652
Comment:
|
906
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Made cables for LVDT. * Made drawings for new wire clamps. * Asked ATC for manufacturing parts.(and modified drawings.) * Asked quotes for SDC coating for hooks. * Sent packing tools for BF. * Talked with i-ject about quotes for payload. |
* Updated the 3D assembly model for BS (among other issues, it turned out that parts were not correctly mated near where the suspension sits on the hydraulic jacks in the tank). * Liaised with IJECT. * Made an inventory for Type B (BS and SR). * Packed and shipped second winch to Kamioka. * Packed some jigs for adjusting BF blades. * Attended NINS information security seminar. * Attended the public hearing for the Opt-IR Research Division Chief Election. |
Line 18: | Line 19: |
* Mark, Fabian and Enzo * |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Hirata-san:
- Updated the 3D assembly model for BS (among other issues, it turned out that parts were not correctly mated near where the suspension sits on the hydraulic jacks in the tank).
- Liaised with IJECT.
- Made an inventory for Type B (BS and SR).
- Packed and shipped second winch to Kamioka.
- Packed some jigs for adjusting BF blades.
- Attended NINS information security seminar.
- Attended the public hearing for the Opt-IR Research Division Chief Election.
- Mark and Fabian at Kamioka (plus Enzo for 2 days):
- Finished rebalance of IM
- Reinstalled IRM, adjusted OSEMs
- Replaced broken Type 3 cable on IM-H1 OSEM.
- Fixed issues with k1visbs real-time model.
- Started TFs from IRM OSEMs to IRM and IM OSEMs.
- Mark, Fabian and Enzo