Size: 1192
Comment:
|
Size: 887
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Type B Past Week Summary * Fabian prepared a work space in the ATC cleanroom and moved in nearly all the parts for the dummy BS, RM, IM and IRM. * Fabian finally got perfect agreement between the Mathematica and Matlab models of the BS. (The wire thicknesses had in µm instead of mm, leading to some modes off by 1E3.) * Hirata-san remeasured the BF for the BS. He noted that the cap went on and came off easily (unlike some other filters). * Hirata-san worked on final details of the Mirapro order for the assembly frame. * Hirata-san and Takahashi-san washed a large batch of parts. * Tatsumi-san will glue flags, sapphire primary prisms and metal secondary prisms to the dummy BS some time in the week of 6/8. Fabian and possibly Mark and/or Hirata-san will travel to KEK to help and observe. * Mark worked more on [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4235|E1504235 BS Assembly Procedure]] ([[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!195&authkey=!AM_usynuo9QI57g&ithint=folder,webloc|Draft on OneDrive]]) |
* Hirata-san: * Worked on the PR optic removal jig. * Enzo-san * Worked on getting his drivers license. * Mark, Fabian (at Kamioka): * Tried different strategies for getting the IRM-IM EQ stops and IRM OSEMs to line up simultaneously. * Realized that the main problem was that the pitch of the BS had changed relative to the IM (presumably due to slight slippage of the wires) so the IM had to be pitched up by 16 mrad to get the BS pitched slightly down (4.7 mrad). * Took the sides off the IRM to get access to the clamps and tightened them to prevent further slips. * Rebalanced the IM to be level in pitch (and roll). * Reassembled the IRM and aligned the IRM-IM EQ stops - this time it was easy. * Adjusted the IRM and RM OSEMs to mid-range. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Hirata-san:
- Worked on the PR optic removal jig.
- Enzo-san
- Worked on getting his drivers license.
- Mark, Fabian (at Kamioka):
- Tried different strategies for getting the IRM-IM EQ stops and IRM OSEMs to line up simultaneously.
- Realized that the main problem was that the pitch of the BS had changed relative to the IM (presumably due to slight slippage of the wires) so the IM had to be pitched up by 16 mrad to get the BS pitched slightly down (4.7 mrad).
- Took the sides off the IRM to get access to the clamps and tightened them to prevent further slips.
- Rebalanced the IM to be level in pitch (and roll).
- Reassembled the IRM and aligned the IRM-IM EQ stops - this time it was easy.
- Adjusted the IRM and RM OSEMs to mid-range.