==== Report for week of 8/13 ====
 * KAGRA was closed Mon/Tue 8/13-14 due to O-Bon.
 * Enzo and team debugged an issue with height of the SR3 keystone coupling to yaw of the payload as measured by the OL. We suspect a ferromagnetic item on the SF damper, but we're not sure.
==== Report for the week of 4/15 ====
 * Fabian debugged a dead stepper on SR3 (broken driver channel) and a dead geophone on SRM (unplugged cable). He made another update to the table used by the Python script for the stepper driver MEDM screen to reflect the remapping.
 * Fabian monitored the pumpdown and he and Hirata-san did post-pumpdown checks of all the suspensions. They were all healthy.
 * Hirata-san participated in the health checks and learned about the computer systems.
 * Mark did major revisions to the MEDM menu on the OVERVIEW screen with scripts for making `safe.snap` files and snapshots of setpoints. He made the `safe.snap` files in directories under `/opt/rtcds/kamioka/k1/target` into symbolic links to files in `/opt/rtcds/userapps/release/vis/k1/burtfiles`, alongside the setpoint files, so that they could be backed up to the SVN (as at LIGO).
 * Mark did major updates to his `vistools.py` Python package for manipulating the suspensions (based on his LIGO `sustools.py`). He added entries for Type B suspensions to the internal database and added commands for manipulating SET and DCCTRL blocks. He also added commands to simulate pressing on the `CLEAR HISTORY` and `LOAD COEFFICIENTS` buttons.
 * Mark started updating the `TYPEB.py` Guardian definition file to use `vistools.py`. So far only the `ENGAGING_IP_CONTROL` state has been fully rewritten and tested, but other states will be simple adaptations. It should be easy to do Type A and other Guardians in the same style.
Line 10: Line 13:
==== Report for week of 8/20 ====
===== SR3 =====
 * Hatoya-san and Enzo gathered date for a study of yaw mode Q damping time as a study of damper ring height.
===== SR2 =====
 * We continued with cabling work.
 * We configured the second pico driver and connected it.
 * We assembled the LBB damper rings in the tank, craned them to near the top and hooked them. While the tank was open we also set the jacks below the mushroom that will support the suspension to nominal height.
==== Plan for week of 4/22 ====
 * Mark, Terrence at Kamioka Mon-Fri.
 * Fabian at Kamioka Mon-Thu.
 * Work with Lucia to do blending of the IP LVDTs and geophones.
 * More Guardian improvements.
  * Improve `vistools.py` (add more useful functions; add docstrings; add support for Type A/Bp/C; create test suite).
  * Finish and test new Guardian code using `vistools.py`.
  * Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output).
 * Work on Type B paper.
 * Tidy up.
  * Gather and clean tools.
  * Gather and organize unused parts and fasteners.
Line 18: Line 26:
===== SRM =====
 * We reserved and configured two pico drivers.
 * We checked the prism gluing and all the jigs came away successfully.
 * Fabian assembled the RM.
 * Hirata-san added ballast masses to the IM and we weighed it, as well as the RM and the optic in the mirror box.
 * We suspended the optic and RM.

==== Report for week of 8/27 ====
===== SR3 =====
 * We did an inventory of arc weights to see if we had enough for SRM and found that we had only enough for a basic allocation for all of type B (172 kg for BS and 103.2 kg per SR) with almost no spare for tuning.
 * Using SR3, we did a quick study of the IP frequency as a function of the number of arc weights, to see how much more we might need. 3 pairs of small arc weights (10 mm thick, 4.53 kg each) brought the frequency below 0.1 Hz, 4 pairs made it unstable. If SR3 is typical we would need about 27 kg extra per suspension.
 * After the IP study, we left three pairs of 10 mm arc weights installed on the IP for more investigation with the digital system (instead of a stopwatch). ''RESULTS.''

===== SR2 =====
 * We finished routing the in-vacuum cables, and connected everything through to the rack for final testing.
 * We brought a basic 103.2 kg set of arc weights (3 large (38 mm) and 6 medium (19 mm)) into the SR2 cleanbooth.

===== SRM =====
 * Panwei calibrated 6 OSEMs to be used on the IM.
 * We brought in all the remaining arc weights from the pallet into the SRM cleanbooth, and Hirata-san cleaned up 1 large arc weight and 3 mediums left over from the BS that complete a basic set of 103.2 kg, plus about 5 kg spare. (However 27 kg of these are on loan to SR3.)
 * We assembled and installed the bottom section of the security structure under the optic and RM.
 * We set up a new OL for setting the pitch. We found the reflection off the AR surface was much weaker than for SR2 and SR3, but fortunately the HR surface is almost flat (ROC≈300 m) so we were able to use the HR reflection instead.
 * ''We set the pitch of the SRM and RM and tightened the wire clamps.''

==== Plan for week of 9/3 ====
 * Mark, Enzo, Hirata-san, Fabian, Kozu-kun, Panwei at Kamioka Mon-Fri.
 * (Mark possible trip to LIGO Hanford - TBD.)
===== SR2 =====
 * Crane in SR2.
 * Move SR2 in-air cables.
 * Remove First Contact. ''DO WE NEED TO GET THE DUCT MOVED FIRST???''
 * Unlock and realign payload.

===== SRM =====
 *
===== Etc =====
 * Prepare for scheduled power outage on 9/10.

==== Plan for week of 9/10 ====
 * Monday 9/10 is scheduled power outage.
 * Mark, Hirata-san, Fabian, Kozu-kun, Panwei at Kamioka Tue-Fri.
 * Enzo at Kamioka Tue-Thu, then JPS Meeting Fri, then vacation.
 * (Mark possible trip to LIGO Hanford - TBD.)
 * Recover from power outage.

==== Plan for week of 9/17 ====
 * Monday 9/17 is holiday (Respect for the Aged Day).
 * Enzo on vacation.
 * Mark, Hirata-san, Fabian, Kozu-kun, Panwei at Kamioka Tue-Fri.

==== Plan for week of 9/24 ====
 * Monday 9/24 is holiday (Autumn Equinox).
 * Mark, Hirata-san, Fabian, Kozu-kun, Panwei at Kamioka Tue-Fri.

==== To-Do Lists, Schedule ====
 * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
 * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]]

==== Vacation Info ====
 * Mark: 8/13-16.
 * Hirata-san: 8/13-17
 * Terrence: 8/24-26 f2f, then returns to Hong Kong.
 * Enzo: 9/14 JPS, 9/15 through 10/8 vacation in Chile.
==== Vacation/Travel Info ====
 * Terrence's next visit from 4/18.
 * Fabian's vacation 4/26 to 5/10.
 * Mark's US vacation from 5/22 to 6/11.
 * Mark's final day 6/28.

Scraps of text for incorporation in the VIS Meeting Minutes

KAGRA/Subgroups/VIS/MeetingNAOJ

Type B (Mark)

Report for the week of 4/15

  • Fabian debugged a dead stepper on SR3 (broken driver channel) and a dead geophone on SRM (unplugged cable). He made another update to the table used by the Python script for the stepper driver MEDM screen to reflect the remapping.
  • Fabian monitored the pumpdown and he and Hirata-san did post-pumpdown checks of all the suspensions. They were all healthy.
  • Hirata-san participated in the health checks and learned about the computer systems.
  • Mark did major revisions to the MEDM menu on the OVERVIEW screen with scripts for making safe.snap files and snapshots of setpoints. He made the safe.snap files in directories under /opt/rtcds/kamioka/k1/target into symbolic links to files in /opt/rtcds/userapps/release/vis/k1/burtfiles, alongside the setpoint files, so that they could be backed up to the SVN (as at LIGO).

  • Mark did major updates to his vistools.py Python package for manipulating the suspensions (based on his LIGO sustools.py). He added entries for Type B suspensions to the internal database and added commands for manipulating SET and DCCTRL blocks. He also added commands to simulate pressing on the CLEAR HISTORY and LOAD COEFFICIENTS buttons.

  • Mark started updating the TYPEB.py Guardian definition file to use vistools.py. So far only the ENGAGING_IP_CONTROL state has been fully rewritten and tested, but other states will be simple adaptations. It should be easy to do Type A and other Guardians in the same style.

Plan for week of 4/22

  • Mark, Terrence at Kamioka Mon-Fri.
  • Fabian at Kamioka Mon-Thu.
  • Work with Lucia to do blending of the IP LVDTs and geophones.
  • More Guardian improvements.
    • Improve vistools.py (add more useful functions; add docstrings; add support for Type A/Bp/C; create test suite).

    • Finish and test new Guardian code using vistools.py.

    • Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output).
  • Work on Type B paper.
  • Tidy up.
    • Gather and clean tools.
    • Gather and organize unused parts and fasteners.

Vacation/Travel Info

  • Terrence's next visit from 4/18.
  • Fabian's vacation 4/26 to 5/10.
  • Mark's US vacation from 5/22 to 6/11.
  • Mark's final day 6/28.