==== Report for week of 10/29 ==== * SRM * Hirata-san and Mark craned the LBB ring sandwich to the ceiling of the lower half of the tank, and set the heights of the jacks on the upper half. * Fabian and Hirata-san finished the in-vacuum cabling. * Enzo ran DC power to the second SRM stepper driver and did the rest of the in-air cabling. * We're now ready for final tests of the SF/... items and initial tests of the PI items. * Enzo and Fujii-kun built three geophones for SRM. * Mark worked on the height budget. * SR2 * Enzo experimented with [[http://www2.mpq.mpg.de/~ros/geo600_docu/soft/liso/manual.pdf|LISO]] (circuit analysis software which, among other functions, can fit measured TFs with a ZPK model) but then wrote his own fitting software in Python and used it to build Foton models of key TFs of the SR2. (These are in slots FM6-FM8 of the DAMP blocks and should not be accidentally enabled.) ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]] |
==== Report for the week of 4/8 ==== * Support of Type Bp * Mark made lots of Guardian improvements: * Used Guardian's timer functionality to drastically reduce the number of notifications during ramping. * Added new requestable states DCCTRL_ONLY and NEUTRAL (and associated transitional states) to facilitate testing. * Tidied up the code to use tabs consistently throughout for indentation. * Disabled the test for the IM-H coil driver WD (to work around the fact that only the relay in the chassis has been disabled, not the WD signals going to the BIO). * We opened the BS tank lid and offloaded a large IM-Y offset to F0-Y with manual adjustment of the broken yaw mechanism). * We opened the SR2 side doors and adjusted the V1 OSEM to mid-range. * Mark offloaded a large SR2 IM-Y offset to F0-Y. * Mark did health checks for BS, SR2 and SR3. * Fabian offloaded yaw from SRM and did the SRM health check. * Fabian updated the Python code for the stepper driver MEDM screen to reflect that two stepper drivers have different mappings to work around dead channels. * Fabian monitored pumpdown on Friday afternoon and will continue on Saturday. |
Line 22: | Line 20: |
==== Plan for week of 11/11 ==== * Mark, Enzo, Hirata-san and Fabian at Kamioka Mon-Fri. ===== SRM ===== * Main sequence |
==== Plan for week of 4/15 ==== * Mark, Hirata-san at Kamioka Tue-Thu. * Fabian at Kamioka Mon-Wed. * All at f2f Meeting 4/19-21. * Post-pumpdown health checks. * Teach Hirata-san about the computer systems and control theory. * Work with Lucia to do blending of the IP LVDTs and geophones. * More Guardian improvements. * Update vistools.py (formerly LIGO sustools.py) for Type B and KAGRA, and have the TYPEB.py Guardian use it where appropriate. * Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output). * Work on Type B paper. * Tidy up. * Gather and clean tools. * Gather and organize unused parts and fasteners. |
Line 27: | Line 35: |
==== Plan for week of 11/19 ==== * Friday 11/23 is Labor Thanksgiving Day. * Mark, Enzo and Fabian at Kamioka Mon-Thu. * Hirata-san at Kamioka Tue-Thu (Mitaka on Mon for Engineering Promotion Office meeting). ===== SRM ===== * Go/no-go test of all electronics items, especially SF/... section. * Finish vertical height check and adjust SF trim mass as required. * Unlock IP and center roughly. * Check/adjust alignment of SS. * Calibrate IP LVDTs. * Add arc weights and geophones. * Improve centering/tuning of IP and SS alignment. * Disconnect cables at feedthroughs, lock suspension. * Crane into tank. ===== SR2 ===== * Assist MIF team with pico cables and LBB breadboard ballast. * Install SR2 OL pillar and shelf (with AOL supervision)? ==== Plan for week of 11/26 ==== * Move SRM in-air cables over to tank. * Remove First Contact. * Unlock and align SRM. * Hook and roughly ballast LBB. ==== Plan for week of 12/3 ==== * f2f Meeting at NAOJ - no Kamioka work. ==== Vacation/Event Info ==== * Hirata-san at Mitaka, Mon 11/19 (Engineering Promotion Office meeting). |
==== Vacation/Travel Info ==== * Mark at Mitaka 4/15. * f2f 4/19 (Friday), 4/20, 4/21. * Terrence's next visit from 4/18. * Fabian's vacation 4/26 to 5/10. * Mark's US vacation from 5/22 to 6/11. * Mark's final day 6/28. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
Type B (Mark)
Report for the week of 4/8
- Support of Type Bp
- Mark made lots of Guardian improvements:
- Used Guardian's timer functionality to drastically reduce the number of notifications during ramping.
- Added new requestable states DCCTRL_ONLY and NEUTRAL (and associated transitional states) to facilitate testing.
- Tidied up the code to use tabs consistently throughout for indentation.
- Disabled the test for the IM-H coil driver WD (to work around the fact that only the relay in the chassis has been disabled, not the WD signals going to the BIO).
- Mark made lots of Guardian improvements:
- We opened the BS tank lid and offloaded a large IM-Y offset to F0-Y with manual adjustment of the broken yaw mechanism).
- We opened the SR2 side doors and adjusted the V1 OSEM to mid-range.
- Mark offloaded a large SR2 IM-Y offset to F0-Y.
- Mark did health checks for BS, SR2 and SR3.
- Fabian offloaded yaw from SRM and did the SRM health check.
- Fabian updated the Python code for the stepper driver MEDM screen to reflect that two stepper drivers have different mappings to work around dead channels.
- Fabian monitored pumpdown on Friday afternoon and will continue on Saturday.
Plan for week of 4/15
- Mark, Hirata-san at Kamioka Tue-Thu.
- Fabian at Kamioka Mon-Wed.
- All at f2f Meeting 4/19-21.
- Post-pumpdown health checks.
- Teach Hirata-san about the computer systems and control theory.
- Work with Lucia to do blending of the IP LVDTs and geophones.
- More Guardian improvements.
- Update vistools.py (formerly LIGO sustools.py) for Type B and KAGRA, and have the TYPEB.py Guardian use it where appropriate.
- Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output).
- Work on Type B paper.
- Tidy up.
- Gather and clean tools.
- Gather and organize unused parts and fasteners.
Vacation/Travel Info
- Mark at Mitaka 4/15.
- f2f 4/19 (Friday), 4/20, 4/21.
- Terrence's next visit from 4/18.
- Fabian's vacation 4/26 to 5/10.
- Mark's US vacation from 5/22 to 6/11.
- Mark's final day 6/28.