Differences between revisions 4 and 305 (spanning 301 versions)
Revision 4 as of 2016-04-15 12:02:42
Size: 14643
Editor: MarkBarton
Comment:
Revision 305 as of 2018-07-27 14:19:43
Size: 2930
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Electronics
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600| D1503600-v9 BS Suspension Cabling]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111| E1605111-v1 BS Suspension Electronic Items List]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3901| D1503901-v2 In-Vacuum Cable Detail]]
  * Need to hand-make geophone cables
  * Need to make longer versions of BF-PI and SF-PI cables (3.7 m and 2.5 m)
  * Need to check OSEM cables have same flip for flexicircuit as for PRx.
  * Asked Miyakawa-san for status on AEL items, especially stepper driver.
 * Compensation masses for RM/IRM ordered, expected 4/29
=== Type B (Mark) ===
==== Report for week of 7/23 ====
 * We finished adding cable clamps to the SR2 PI and SF.
 * We craned in the SR2 PI and installed the PI-SF rod. As expected, there was not quite enough load capacity for even a 2 Cu-segment SF.
 * We changed the CuBe spring on the SR2 PI from an F2 type to an F1 and got about an extra 2 kg, which is plenty for 2 Cu segments.
 * We moved the feedthroughs from the SR3 assembly frame to the SR3 tank. Mirapro then moved the assembly frame to the SRM area. Mirapro also moved the duct on the +Y side of the SR3 tank to give us access to that side.
 * We laid a new set of SR3 in-air cables running directly to the tank. (We will repurpose the original set for SRM.)
 * We reconnected the SR3 cables on both sides of the feedthroughs. We had to adjust the routing of the in-vacuum ones several times to stop them touching the tank, but we finally found a good solution.
 * With help from Ohishi-san we removed the First Contact and then unlocked the whole suspension by stages. We need to check the optic pitch and do a little more mechanical adjustment but we were able to take TFs and implement IM and GAS control filters.
 * Hirata-san and Fujii-kun received most of the SRM metal mass parts, did inventory and practiced some of the key steps in the assembly, especially inserting the Sol-Black coated parts without touching the delicate surfaces.
 * Mark did inventory of the BIO stuff for the WD and of the OL parts.
Line 15: Line 17:
 * Hirata-san drew up flags ==== Plan for week of 7/30 ====
 * Mark, Enzo, Hirata-san, Fabian, Kozu-kun, Terrence, Panwei at Kamioka Mon-Fri.
 * Kozu-kun works at Mozumi Mon, Fri, and Thu afternoon.

===== SR3 =====
 * Finalize optic pitch, OSEM alignment.
 * Hook LBB, add ballast mass, set up temporary OL (horizontal beam, pitch/yaw only).
 * Identify/acquire items required for final OL (steering mirrors, second QPD, lens, collimator).

===== SR2 =====
 * Fix issue with PI/SS/chain alignment.
 * Put magnets on SR damper ring (2 Cu segment pattern).
 * Remove PI-SF rod temporarily, install Cu segments and damper ring.
 * Do vertical height budget; choose optimum F0 keystone height.
 * Add estimated final ballast mass.
 * Do PI cable routing.
 * Adjust ballast/trim mass, with reserve for cables.
Line 17: Line 35:
   * Lots of new drawings - see above or [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5035| E1605035 VIS Document and Drawing Tree (BS)]] ===== SRM =====
 * Set up filter tuning area.
 * Tune F0 for SRM.
 * Add LBB blade units, cable clamps etc.
 * Check PI coil connections, IP LVDT magnets.
Line 19: Line 41:
= VIS Meeting on 2016/4/15 =
2016/4/15 13:30 -
==== To-Do Lists, Schedule ====
 * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
 * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]]
Line 22: Line 46:
Room 210 & eZuce

Participants:

== Schedule ==
 * #Schedule status (Aso)
 * #Will have a schedule meeting with Ando-san on April 15th in Kamioka (Takahashi, Mark, Shoda will come)

== iKAGRA related activities ==
== PR3 ==
 * PR3 Operation Status (Aso)
  *
 * Traverser and Stepper motor remote control (Shoda):
  * Aso will send a stepper motor driver from Kamioka to Mitaka for test.-> Done

== iKAGRA ETM suspension ==
 * Current status (Ohishi)

== Electronics ==
 * What are necessary in the next few weeks ?
  * BS:
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600|JGW-D1503600 - BS Suspension Cabling]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111| E1605111 BS Suspension Electronic Items List]]
   * Gave dates to Miyakawa-san and asked for feedback and status (no reply yet). Also, some issues with previously ordered cables were brought to attention of Takahashi-san.

 * Watch dog system (Tanaka)
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5108|Graceful shutdown mechanism]]

  * Will give a presentation at the next AEL meeting on 4/18

 * #Electronics diagram and review
  * #Electronics document tree for VIS by Mark ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4937|E1604937]])
  * #Updated PR3 schematic with OpLev wiring ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4795|D1604795]])
  * #Who will manage the electronics of each suspension
   * Type-Bp will be controlled by Shoda but the diagram update will be done by Mark
   * Type-A may be maintained by a new engineer. Sould be discussed with the person before April .
  * #We need to count electronics and cables needed for the tests, such as temporary sensors and so on.

== bKAGRA preparation ==
 * Three big categories of the tasks
  * Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
  * Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
  * Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

== Common Issues ==
 * Policy of the screw types to be used (Mark, Fabian) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5107|E1605107]] ([[https://onedrive.live.com/redir?resid=1447B05D5B571A84!346&authkey=!ABNrIarsklTd8Q0&ithint=file,docx|draft]])
 * Reflection type local sensor (Akutsu)
  * Test widening the opening next week (Akutsu) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1459|report]]
  * Continue to work on how to fit the reflective sensor into the current coil bobbin (Akutsu)
 * OSEM assembly (Akutsu)
  * Schedule for each suspension is now given to Akutsu-kun

== Type-B ==
 * [[KAGRA/Subgroups/VIS/TypeB]]
 * [[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!185&authkey=!AGcFDradxzrNJ00&ithint=folder,txt|Task list/schedule]]
 * Past Week Summary
  * Mark posted [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600|JGW-D1503600 - BS Suspension Cabling]], did a summary [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111| E1605111 BS Suspension Electronic Items List]] and asked Miyakawa-san for feedback and status (no reply yet). Also, some issues with previously ordered cables were brought to attention of Takahashi-san.
  * Mirapro sent assembly frame quote based on [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5037|E1605037]]
  * Mark designed a clean bag [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5123 | T1605123]]
  * Fabian continued analysis of wire thickness versus mode frequency: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5106|T1605106]] ([[https://onedrive.live.com/view.aspx?resid=1447B05D5B571A84!354&ithint=file,docx&app=Word&authkey=!AO5CHNP3xlO5RjY|draft]])
  * Hirata-san investigated and found a good height for secondary prism was 3 mm. He drew up the dummy primary prisms and the secondary prisms: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5125| D1605125]]
  * Hirata-san did drawings for the flags: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5087| D1605087 Flag for BS RM]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5088| D1605088 Flag for BS IM]]
  * Hirata-san asked for quote on prisms and flags.
  * Hirata-san did assembly drawings for the safety bar between IM and RM and for the EQ stop: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5127| D1605127]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5124|D1605124]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5112| D1605112 Flag for BS IM type2]]
 * Can we make SR wire breakers bigger?
  * Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016 -> Hirata-san and Takahashi-san talking to ATC 4/8 morning.
 * Flag design
  * [[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!279&authkey=!ABLGQZIFvuQFtz4&ithint=folder,dwg|BS Flag Redesign on OneDrive]]
   * Drawings done, RFQ issued: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5087|D1605087]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5088|D1605088]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5112| D1605112]]
  * Widen the OSEM opening (Akutsu)
  * A new local length sensing
   * Need to decide the strategy for BS: three choices
    * Use OSEMs as originally planned
    * Use OpLev, No OSEM flag
    * Use reflection type sensors, No OSEM flag
   * Decide later!
 * BS dummy optic
  * Ordered, expected ≈4/22 ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811|T1604811]])
 * Prisms
  * New drawings for dummy primary prisms and secondary prisms: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5125| D1605125]], safety bar between IM and RM [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5127| D1605127]], and for the EQ stop [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5124|D1605124]]
 * EQ stop screws, extensions and lock nuts (in manufacture - promised for 4/22)
 * Ballast masses for payload
  * Hirata-san created drawings [[https://www.dropbox.com/sh/t5tfj9uvdkldk1d/AAB0ypH6SZpZjBYK0E0416Lwa?dl=0|DropBox link]]
  * Drawings were checked by Mark, not yet ordered.
 * Lower breadboard stuff
  * Breadboard spring bases and associated cable clamps (in manufacture, expected 4/15)
  * Breadboard springs (in manufacture)
  * Damper ring mods (in manufacture, expected 4/28)
  * Nail-head parts: quote from Mirapro received, not urgent, will be combined with assembly frame order.
 * BS Assembly Frame Design (Mark, Hirata)
  * Quote received, drawings being checked. Will need minor modifications to support clean bag (see below).
 * Clean bag
  * Design done: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5123 | T1605123]]
  * Aso-san will order
 * 2D and 3D CAD
  * BS 3D Assembly
   * Lots of new drawings - see above or [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5035| E1605035 VIS Document and Drawing Tree (BS)]]
   * 3D CAD for BS assembly frame received from Mirapro - Hirata-san is adding clean bag extension and rail stuff.
 * Electronics
  * Lots of work:
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600|JGW-D1503600 - BS Suspension Cabling]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111| E1605111 BS Suspension Electronic Items List]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3901| D1503901 In-Vacuum Cable Detail]]
   * Item list and timetable was given to Miyakawa-san.
   * Need to get new longer versions of some previously ordered BF-PI and SF-PI cables (Takahashi).
   * Need to check previously ordered TM-BF and IM-BF OSEM cables have been flipped (Takahashi).
   * Decided to hand-make cables for geophones because previously ordered cables have no conductor on pin 5.
   * Need to get status on design of stepper drive box (requested by Sekiguchi-san [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3385|T1503385]])
 * Procedure documents
  * No action since last week
 * Mirror box (Tatsumi)
  * Hirata-san is working on this as top priority - design decided, drawings being checked, will get them to Tatsumi-san ASAP.
  * BS clamp blocks already adjusted.
 * Not enough crane height problem (Hirata, Saito)
  * No action since last week

== Type A ==
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Task list]] (Takahashi)

 * Prototype test<<BR>>
  * The prototype EQ stop was transported from Kashiwa to Kamioka on 31th March.
  * Assembly of the EQ stop prototype on 6-7 April next to the SR3 chamber. -> Found a lot of things to improve. Report by Okutomi.
   * Will redeisgn the EQ stops for the actual Type-A suepsnions.
  * Demonstration of installation procedure using prototype filters (SFx1 + BFx2) from May
   * Use the prototype EQ stops with the old Type-B assembly frame
   * Clean booth construction for SR will start from July 1st.
   * The location will be between SR2 and SR3. Will talk with Saito-san if this plan is OK or not on 4/15 (Takahashi)
 * The next Type-A meeting will be on 4/14.
 * The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1185
  * Load dependence was measured using a laser position sensor. Extension of 2.84mm was observed for the load of 272.8kg. The extension is consistent with the calculation (2.75mm).
 * Maraging rod preparation status
  * 2 sets for magnetic dampers are missing
  * 4 long maraging rods will
 * Care on the humidity should be taken to store maraging steel to avoid cracking noise.

 * Type-A Filters Optimal Load Measurements
  * Started the measurements and installation of fishing rods: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5105|report]]
 * Simultion (Okutomi)
  * Simulation with a dummy payload (report)
  * Will update the seismic noise data.
  * Need to implement the damping control part to see the damped RMS.
  * Ballast masses for the top filter may interfere with the magic wands.
   * Need to check how many ballast masses are necessaryfor Type-B and see if they interfere (Mark). If so we need to modify the mass like making some cuts.

== Type-Bp modification ==
 * This Week
  * Working on the CAD model and control simulation of BF modification (Shoda)

  * Details will be reported at the next meeting.
 * Traverser motor driver (Shoda)
  * Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
  * Miyakawa-san wants to have a driver and a motor to test
   * Will give them to MIyakawa-san when Shoda-san come to Kamioka for the shifts
    . -> Done (3/28)
    * Shoda is also asking Uraguchi-san to provide one more Traverser motor driver for the test.

 * Modification for bKAGRA
  * [[KAGRA/Subgroups/VIS/TypeBp|wiki]]
   * Uraguchi-san proposed us the new IP plan
   * Shoda updated the proposal(concerns?) for the BF active damping plan

  * Action items for Type-Bp modification
   * Calculate the upper limit of the resonant fequency for IP (Fujii): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5096|MeetingMemo]]
   * Check if we need the magnetic damper for the bottom filter (Fujii): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5096|MeetingMemo]]
    * Either the MD is used or the resonant frequency of the IP should be matched with the whole chain resonance.
   * Check the mass of the bottom plate and the cap of the standard filter -> Send Uraguchi-san (Shoda)
    . -> Done (3/31)
   * Check structure analysis of the EQ stop for active damping on BF (Shoda)
   * Check the minimam weight we need for the BFRM in order to damp the resonance enough (Shoda)
   * Check the capability to modify the BF cap (Shoda)
    . '''We want the correct CAD model for the original Type-Bp'''
    * The BF and SF designs are the same for Bp and B except for the blades. So the effort to make correct CAD models for those filters can be unified between the two teams. Hirata-san with help from Shoda-san will work to make correct CAD models.

  * Will have a meeting with Virgo people sometime soon. Then have a review for Type-Bp

== Site work plan for the next week ==
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:

== Travel Plans ==
 * Travel (Week of 4/18)
  * Takahashi:23-25 (Shift)
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:

 * Travel (Week of 4/25)
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:

== Other ==
 * Safety
  *

 * #GAS blade inspection by Virgo (Takahashi)
  * Shipped the blades. Will get results in 1-2 months.

== Next meeting ==
2016/4/22 (Fri) 13:30 -
==== Vacation Info ====
 * Terrence: 8/24-26 f2f, then returns to Hong Kong.
 * Enzo: 9/14 JPS, 9/15 through 10/8 vacation in Chile.

Scraps of text for incorporation in the VIS Meeting Minutes

KAGRA/Subgroups/VIS/MeetingNAOJ

Type B (Mark)

Report for week of 7/23

  • We finished adding cable clamps to the SR2 PI and SF.
  • We craned in the SR2 PI and installed the PI-SF rod. As expected, there was not quite enough load capacity for even a 2 Cu-segment SF.
  • We changed the CuBe spring on the SR2 PI from an F2 type to an F1 and got about an extra 2 kg, which is plenty for 2 Cu segments.

  • We moved the feedthroughs from the SR3 assembly frame to the SR3 tank. Mirapro then moved the assembly frame to the SRM area. Mirapro also moved the duct on the +Y side of the SR3 tank to give us access to that side.
  • We laid a new set of SR3 in-air cables running directly to the tank. (We will repurpose the original set for SRM.)
  • We reconnected the SR3 cables on both sides of the feedthroughs. We had to adjust the routing of the in-vacuum ones several times to stop them touching the tank, but we finally found a good solution.
  • With help from Ohishi-san we removed the First Contact and then unlocked the whole suspension by stages. We need to check the optic pitch and do a little more mechanical adjustment but we were able to take TFs and implement IM and GAS control filters.
  • Hirata-san and Fujii-kun received most of the SRM metal mass parts, did inventory and practiced some of the key steps in the assembly, especially inserting the Sol-Black coated parts without touching the delicate surfaces.
  • Mark did inventory of the BIO stuff for the WD and of the OL parts.

Plan for week of 7/30

  • Mark, Enzo, Hirata-san, Fabian, Kozu-kun, Terrence, Panwei at Kamioka Mon-Fri.
  • Kozu-kun works at Mozumi Mon, Fri, and Thu afternoon.

SR3
  • Finalize optic pitch, OSEM alignment.
  • Hook LBB, add ballast mass, set up temporary OL (horizontal beam, pitch/yaw only).
  • Identify/acquire items required for final OL (steering mirrors, second QPD, lens, collimator).

SR2
  • Fix issue with PI/SS/chain alignment.
  • Put magnets on SR damper ring (2 Cu segment pattern).
  • Remove PI-SF rod temporarily, install Cu segments and damper ring.
  • Do vertical height budget; choose optimum F0 keystone height.
  • Add estimated final ballast mass.
  • Do PI cable routing.
  • Adjust ballast/trim mass, with reserve for cables.

SRM
  • Set up filter tuning area.
  • Tune F0 for SRM.
  • Add LBB blade units, cable clamps etc.
  • Check PI coil connections, IP LVDT magnets.

To-Do Lists, Schedule

Vacation Info

  • Terrence: 8/24-26 f2f, then returns to Hong Kong.
  • Enzo: 9/14 JPS, 9/15 through 10/8 vacation in Chile.

KAGRA/Subgroups/VIS/TypeB/Minutes (last edited 2022-10-28 10:02:46 by fabian.arellano)