* Type B Past Week Summary * Fabian took photos of the cleanroom in the ATC to help decide whether it is a good place to assemble PIs for Type A/B. * Hirata-san wiped one set each of wires for the BS and RM (addition sets pending). * Hirata-san washed remachined locking parts for the IM and screws for jacks. * Hirata-san liaised with Ikenoue-san of ATC to get winch parts designed for the new wire thicknesses. * Hirata-san worked on the Inventor 3D assembly of the SR2. * The scale for checking the masses of the IM parts was received. * Fabian and Hirata-san identified an issue with the lock screws between the IM and IRM. The screws were too tight in the holes and adjusting the size with a die caused large flakes of the black coating to come off. (These screws were ordered before the current screw policy was instituted.) Hirata-san will order better screws from Misumi and have additional machining done on them. * Fabian tracked down the calibration factors for the geophones and generated a calibrated plot. * Type B ongoing issues * OSEMs * Akutsu-san is working to get wide-mouth OSEMs * Longer cables for BF->PI and SF->PI. * Connectors RECEIVED, cables being made. * SR machining test ongoing. * Lower breadboard stuff * Installation to be incorporated into the procedure document. Mark/Takahashi to discuss. * Breadboard springs (in manufacture, expected end of July) * Documents * BS Assembly Procedure [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4235| E1504235]], [[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!195&authkey=!AM_usynuo9QI57g&ithint=folder,webloc|E1504235 draft]] * To-do list during Mark's vacation * Weigh IM/RM/IRM (Fabian, Hirata) - DONE but anomalies found. * Pack/ship IM/RM/IRM to Kamioka (Hirata/Fabian). * Analyze geophone data (Fabian/Shoda) - data taken by Shoda-san; Fabian to find calibration factors. * Remove glue from dummy BS face (Fabian) - partly done. * Reglue flags and prisms (Tatsumi, Fabian) * Clean wire for BS and RM (Hirata) - DONE * Get new winch parts for new wire diameters - design received from Ikenoue-san * Do fit/function test of winches (Fabian/Hirata) * Ship winches to Kamioka (Hirata/Fabian) * Work on BS simulation (Fabian) * Do Inventor assembly for SR2 in chamber and on assembly frame (Hirata) - ONGOING. * Write more of payload assembly procedure (Fabian) * Write more of main assembly procedure (Mark) * Longer term to-do list * Do BS Simulink model (Mark, Kokeyama) * Do 2D drawings of SR2 parts (Hirata) * Redesign SRx IM wire clamps for larger prisms, remachined RMs. * Order SRM/PRM parts (Hirata/Shoda) * Order SRx fasteners (Hirata) * Check SR RM machining test progress (Hirata) |
=== Type B (Mark) === ==== Report for the week of 4/8 ==== * Support of Type Bp * Mark made lots of Guardian improvements: * Used Guardian's timer functionality to drastically reduce the number of notifications during ramping. * Added new requestable states DCCTRL_ONLY and NEUTRAL (and associated transitional states) to facilitate testing. * Tidied up the code to use tabs consistently throughout for indentation. * Disabled the test for the IM-H coil driver WD (to work around the fact that only the relay in the chassis has been disabled, not the WD signals going to the BIO). * We opened the BS tank lid and offloaded a large IM-Y offset to F0-Y with manual adjustment of the broken yaw mechanism). * We opened the SR2 side doors and adjusted the V1 OSEM to mid-range. * Mark offloaded a large SR2 IM-Y offset to F0-Y. * Mark did health checks for BS, SR2 and SR3. * Fabian offloaded yaw from SRM and did the SRM health check. * Fabian updated the Python code for the stepper driver MEDM screen to reflect that two stepper drivers have different mappings to work around dead channels. * Fabian monitored pumpdown on Friday afternoon and will continue on Saturday. ==== Plan for week of 4/15 ==== * Mark, Hirata-san at Kamioka Tue-Thu. * Fabian at Kamioka Mon-Wed. * All at f2f Meeting 4/19-21. * Post-pumpdown health checks. * Teach Hirata-san about the computer systems and control theory. * Work with Lucia to do blending of the IP LVDTs and geophones. * More Guardian improvements. * Update vistools.py (formerly LIGO sustools.py) for Type B and KAGRA, and have the TYPEB.py Guardian use it where appropriate. * Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output). * Work on Type B paper. * Tidy up. * Gather and clean tools. * Gather and organize unused parts and fasteners. ==== Vacation/Travel Info ==== * Mark at Mitaka 4/15. * f2f 4/19 (Friday), 4/20, 4/21. * Terrence's next visit from 4/18. * Fabian's vacation 4/26 to 5/10. * Mark's US vacation from 5/22 to 6/11. * Mark's final day 6/28. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
Type B (Mark)
Report for the week of 4/8
- Support of Type Bp
- Mark made lots of Guardian improvements:
- Used Guardian's timer functionality to drastically reduce the number of notifications during ramping.
- Added new requestable states DCCTRL_ONLY and NEUTRAL (and associated transitional states) to facilitate testing.
- Tidied up the code to use tabs consistently throughout for indentation.
- Disabled the test for the IM-H coil driver WD (to work around the fact that only the relay in the chassis has been disabled, not the WD signals going to the BIO).
- Mark made lots of Guardian improvements:
- We opened the BS tank lid and offloaded a large IM-Y offset to F0-Y with manual adjustment of the broken yaw mechanism).
- We opened the SR2 side doors and adjusted the V1 OSEM to mid-range.
- Mark offloaded a large SR2 IM-Y offset to F0-Y.
- Mark did health checks for BS, SR2 and SR3.
- Fabian offloaded yaw from SRM and did the SRM health check.
- Fabian updated the Python code for the stepper driver MEDM screen to reflect that two stepper drivers have different mappings to work around dead channels.
- Fabian monitored pumpdown on Friday afternoon and will continue on Saturday.
Plan for week of 4/15
- Mark, Hirata-san at Kamioka Tue-Thu.
- Fabian at Kamioka Mon-Wed.
- All at f2f Meeting 4/19-21.
- Post-pumpdown health checks.
- Teach Hirata-san about the computer systems and control theory.
- Work with Lucia to do blending of the IP LVDTs and geophones.
- More Guardian improvements.
- Update vistools.py (formerly LIGO sustools.py) for Type B and KAGRA, and have the TYPEB.py Guardian use it where appropriate.
- Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output).
- Work on Type B paper.
- Tidy up.
- Gather and clean tools.
- Gather and organize unused parts and fasteners.
Vacation/Travel Info
- Mark at Mitaka 4/15.
- f2f 4/19 (Friday), 4/20, 4/21.
- Terrence's next visit from 4/18.
- Fabian's vacation 4/26 to 5/10.
- Mark's US vacation from 5/22 to 6/11.
- Mark's final day 6/28.