261
Comment:
|
590
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Hirata-san produced a near-final Inventor assembly of the BS on the assembly frame. * [[attachment:160419-チャンバーカバーⅡ型.pdf]] |
* Type B * Hirata-san finished the design of the trolley system (including adapter plates for the mirror box). * Mirapro reported that rails for the trolley system had a long lead time, so we decided to order them separately. * IM and BS flags were ordered. * Tatsumi-san ordered the prism gluing jig parts for the mirror box. * Hirata-san measured another SF. * Mark worked on the assembly procedure. * Fabian worked on the Mathematica/Matlab model of the BS. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B
- Hirata-san finished the design of the trolley system (including adapter plates for the mirror box).
- Mirapro reported that rails for the trolley system had a long lead time, so we decided to order them separately.
- IM and BS flags were ordered.
- Tatsumi-san ordered the prism gluing jig parts for the mirror box.
- Hirata-san measured another SF.
- Mark worked on the assembly procedure.
- Fabian worked on the Mathematica/Matlab model of the BS.