* Type B Past Week Summary, weeks of 9/19 and 9/26 | * Type B Past Week Summary |
Line 8: | Line 8: |
* Took TF data from the TM-H1 coil output to the voltage and current monitors and found that the response was approximately flat. | * Took TF data from the TM-H1 coil output to the voltage and current monitors and found that the response was approximately flat, meaning that meaningful TFs can be taken of the RM/BS stage with no DIO. |
Line 18: | Line 18: |
* Mark checked lots of drawings by Hirata-san. * Mark worked on schedule but only succeeded in completely garbling the Type B section of the VIS schedule on the server. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B Past Week Summary
- Fabian, Mark and Liu-kun did BS installation at Kamioka:
- Connected the DIO card to the LPCD. (Simulink model changes will be needed to make use of it.)
- Took TF data from the TM-H1 coil output to the voltage and current monitors and found that the response was approximately flat, meaning that meaningful TFs can be taken of the RM/BS stage with no DIO.
- Used the 90° prism and the optical lever to set the pitch of the RM to match the dummy BS.
- Removed the RM trolley and added the bottom section of the security structure.
- Lifted the IM/RM/BS with the load gauge adapter and load gauge and measured its mass.
- Hirata-san:
- Mark checked lots of drawings by Hirata-san.
- Mark worked on schedule but only succeeded in completely garbling the Type B section of the VIS schedule on the server.
- Fabian, Mark and Liu-kun did BS installation at Kamioka:
- Longer term to-do list
- Do Inventor assembly for SRx in chamber and on assembly frame (Hirata) - SR2/SR3 DONE, SRM ongoing.
- Part "disk security" top has to be modified - screw positions do not match.
- Write more of payload assembly procedure (Fabian) - ONGOING
Write more of BS Assembly Procedure E1504235, E1504235 draft (Mark) - ONGOING
- Lower breadboard installation to be incorporated into the procedure document.
- Work on BS simulation (Fabian)
- Do BS Simulink model (Mark, Kokeyama) - TM/IM/BF level DONE
- Do 2D drawings of SR2 parts (Hirata)
- Redesign SRx IM wire clamps for larger prisms, remachined RMs
- Order SRM/PRM parts (Hirata/Shoda)
- Order SRx fasteners (Hirata)
- Do Inventor assembly for SRx in chamber and on assembly frame (Hirata) - SR2/SR3 DONE, SRM ongoing.