* Type B Past Week Summary * Mark updated the BS circuit diagram [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600|D1503600]]: * Added information on the binary IO. * Renamed channels to conform to Okutomi-kun's new scheme. * Made the ADC/DAC channel assignment consistent and more logical. * Updated the stepper motor sections with info about the new driver chassis. * Mark and Hirata-san worked on collecting parts and tools that will be needed for cabling of the BS next week. (11 special-purpose cables need to be made for the picos/steppers/OSEMs/LVDT on the RM/IRM/IM/BF and, time permitting, 2 more for the SF.) * Mark worked on schedule. * Mark updated the installation procedure with lessons learned from the last few weeks. * Mark downloaded Hirata-san's Inventor model of the BS in the tank and starting thinking about installation of the suspension and lower bread board. |
* Activity report for week of 12/19 * Mark and Fabian checked Hirata-san's drawings and parts/fastener lists for the SRM/PRM order. * [[KAGRA/Subgroups/VIS/VISMinutes/20161216|BF issue]] * Aso-san and Mark decided to have the BS bottom filter |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Activity report for week of 12/19
- Mark and Fabian checked Hirata-san's drawings and parts/fastener lists for the SRM/PRM order.
- Aso-san and Mark decided to have the BS bottom filter