1053
Comment:
|
2146
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Mark updated the BS circuit diagram [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3600|D1503600]]: * Added information on the binary IO. * Renamed channels to conform to Okutomi-kun's new scheme. * Made the ADC/DAC channel assignment consistent and more logical. * Updated the stepper motor sections with info about the new driver chassis. * Mark and Hirata-san worked on collecting parts and tools that will be needed for cabling of the BS next week. (11 special-purpose cables need to be made for the picos/steppers/OSEMs/LVDT on the RM/IRM/IM/BF and, time permitting, 2 more for the SF.) |
* Mark (with Enzo) did initial TFs on the BF. * Did fixed-sine TFs on individual OSEMs at low frequency to check actuator polarity (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2176 | 2176]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]). * Set gains in the COILOUTF block to compensate for actuator polarity. * Mark (with Enzo) did a free-swing measurement on the BS after earthquake of 11/22 (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]). * Results suspicious (noted by Shoda-san): too much difference between OSEMs - horizontal showing much less motion than vertical. * Possible rubbing in horizontal. * May need a trip to Kamioka. * Mark (with Enzo) made corrections and improvements to many of the MEDM screens (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2176 | 2176]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]). * Main overview screen was not generic in many places, and links to GDS_TP screens were broken. * ADC monitor screen referenced bad channels with LIGO-style names. * DAC monitor screen was not generic and did not support IM OSEMs. * Watchdog IM OSEM AC band limit filter screen was a copy of the TM one. * Watchdog TM OSEM AC band limit filter screen appears to be getting OL signals as input - needs model changes to fix. * The zoomed screens for IM OSEM centering were called incorrectly and did not work. * Various screens had LIGO-style channel names as labels. * Mark did a draft of D1603600-v12, including: * New assignment of IM OSEMs to DAQ channels (#4-9 are now V1, V2, V3, H1, H2, H3 rather than H1, H2, ...) from last Friday (the wiring was changed to reflect the model). * Information on how to identify the wires from the steppers and LVDTs so that the adapter cables can be plugged in properly. |
Line 13: | Line 25: |
* Mark updated the installation procedure with lessons learned from the last few weeks. * Mark downloaded Hirata-san's Inventor model of the BS in the tank and starting thinking about installation of the suspension and lower bread board. |
* Hirata-san did drawings for new 8-mm maraging wires for Type A. * Hirata-san worked on PR/SR mirror box modifications with Shoda-san. |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B Past Week Summary
- Mark (with Enzo) did initial TFs on the BF.
Mark (with Enzo) did a free-swing measurement on the BS after earthquake of 11/22 (klog 2182).
- Results suspicious (noted by Shoda-san): too much difference between OSEMs - horizontal showing much less motion than vertical.
- Possible rubbing in horizontal.
- May need a trip to Kamioka.
Mark (with Enzo) made corrections and improvements to many of the MEDM screens (klog 2176 and 2182).
- Main overview screen was not generic in many places, and links to GDS_TP screens were broken.
- ADC monitor screen referenced bad channels with LIGO-style names.
- DAC monitor screen was not generic and did not support IM OSEMs.
- Watchdog IM OSEM AC band limit filter screen was a copy of the TM one.
- Watchdog TM OSEM AC band limit filter screen appears to be getting OL signals as input - needs model changes to fix.
- The zoomed screens for IM OSEM centering were called incorrectly and did not work.
- Various screens had LIGO-style channel names as labels.
- Mark did a draft of D1603600-v12, including:
- New assignment of IM OSEMs to DAQ channels (#4-9 are now V1, V2, V3, H1, H2, H3 rather than H1, H2, ...) from last Friday (the wiring was changed to reflect the model).
- Information on how to identify the wires from the steppers and LVDTs so that the adapter cables can be plugged in properly.
- Mark worked on schedule.
- Hirata-san did drawings for new 8-mm maraging wires for Type A.
- Hirata-san worked on PR/SR mirror box modifications with Shoda-san.