Line 5: | Line 5: |
* Type B Past Week Summary * Mark worked on task lists and schedule. * Mark worked on an update of the BS Electronic Items doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111|E1505111]]) and started a SRx Electronics Items doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5886|E1605886]]). * Mark worked on an update of the In-Vacuum Cable doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3901|E1503901]]), including information on lengths that. * Fabian worked on a redesign of the EQ stops for the BS (2 of 4 screws under the RM are opposite large holes and there are no screws to restrain the RM front/back at either top or bottom). * Hirata-san worked on PR/SR mirror box modifications with Shoda-san. |
=== Type B (Mark) === ==== Past week report ==== At Kamioka (Mark, Ohishi-san, Fabian, Enzo, Hirata-san, Kozu-kun): * We couldn't count for a bubble level, so we removed a service port cover, searched again on top of the BF and found it. * We locked the LBB, put the table KOACH filters on the table. Ohishi-san removed the FC in two stages (AR side on Tue, HR side on Fri). * Ohishi-san measured the height of the SS and optic relative to the tank and found the optic was 3 mm low but the SS was 2 mm high. According to the GAS LVDTs, the suspension had not sagged but was 1.7 mm high. * Therefore we raised the suspension by 9 quarter-turns of the tank jacks (4.5 mm) to get the optic in the right position after (future) downward adjustment of the GAS filters. * We put the GAS LVDT calibration data as offsets and gains in the LVDTINF filters so the output would be height in µm relative to nominal. * We calibrated the IP LVDTs. We had worked around a mechanical interference due to the poor design of the old LVDTs by setting them to be 4 mm off-center with the IP locked centrally, but we discovered this was overkill and we have lost some linear range on the LVDT sensor in the opposite direction. If we have time we may move the LVDT bases 1-2 mm to a compromise position. * We worked with Simon to get the OL aligned and to learn the adjustment procedure. At Mitaka (Hirata-san): * Hirata-san met with manufacturers and requested quotes. * Hirata-san made many assembly drawings for sections of the SR. * Hirata-san worked on compiling the SR inventory. ==== Plan for week of 10/10 ==== Kamioka: Mark, Fabian, Enzo, Ohishi-san, Kozu-kun. Mitaka: Hirata-san Holiday Mon 10/9, Open Day prep Fri 10/13.<<BR>> * Tune IP, do LVDT/stepper calibration. * Remove First Contact, try OL. * TFs, final preparation for alignment in week of 10/16. * SR procurement. * Design ballast for LBB. * Continue design of improved PI yaw adjustment, also improved F0 FR. ==== Plan for week of 10/16 ==== Kamioka: all but Mark, Hirata-san Mitaka: Hirata-san * Work with alignment team. * SR procurement ==== Vacation Info ==== Mark: 10/16-24 |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
Type B (Mark)
Past week report
At Kamioka (Mark, Ohishi-san, Fabian, Enzo, Hirata-san, Kozu-kun):
- We couldn't count for a bubble level, so we removed a service port cover, searched again on top of the BF and found it.
- We locked the LBB, put the table KOACH filters on the table. Ohishi-san removed the FC in two stages (AR side on Tue, HR side on Fri).
- Ohishi-san measured the height of the SS and optic relative to the tank and found the optic was 3 mm low but the SS was 2 mm high. According to the GAS LVDTs, the suspension had not sagged but was 1.7 mm high.
- Therefore we raised the suspension by 9 quarter-turns of the tank jacks (4.5 mm) to get the optic in the right position after (future) downward adjustment of the GAS filters.
- We put the GAS LVDT calibration data as offsets and gains in the LVDTINF filters so the output would be height in µm relative to nominal.
- We calibrated the IP LVDTs. We had worked around a mechanical interference due to the poor design of the old LVDTs by setting them to be 4 mm off-center with the IP locked centrally, but we discovered this was overkill and we have lost some linear range on the LVDT sensor in the opposite direction. If we have time we may move the LVDT bases 1-2 mm to a compromise position.
- We worked with Simon to get the OL aligned and to learn the adjustment procedure.
At Mitaka (Hirata-san):
- Hirata-san met with manufacturers and requested quotes.
- Hirata-san made many assembly drawings for sections of the SR.
- Hirata-san worked on compiling the SR inventory.
Plan for week of 10/10
Kamioka: Mark, Fabian, Enzo, Ohishi-san, Kozu-kun. Mitaka: Hirata-san Holiday Mon 10/9, Open Day prep Fri 10/13.
- Tune IP, do LVDT/stepper calibration.
- Remove First Contact, try OL.
- TFs, final preparation for alignment in week of 10/16.
- SR procurement.
- Design ballast for LBB.
- Continue design of improved PI yaw adjustment, also improved F0 FR.
Plan for week of 10/16
Kamioka: all but Mark, Hirata-san Mitaka: Hirata-san
- Work with alignment team.
- SR procurement
Vacation Info
Mark: 10/16-24