Line 2: Line 2:
Archived items are at ../ToDoOld.
Line 3: Line 4:
Archived items are at [[../ToDoOld]]. [[#EveryWeek|Every Week]]
Line 5: Line 6:
[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]
[[#ComingWeeks|Coming Weeks]]
Line 16: Line 15:
 * Get stuff from [[../WishList]]  * Get stuff from ../WishList

<<Anchor(ComingWeeks)>>
Line 19: Line 20:
<<Anchor(ComingWeeks)>>
=== 2019-01-07,14,21 ===
==== BS (top priority) ====
 * Check that the suspension is floating.
 * Re-center OL and log value to capture yaw position.
 * Look for cracks in F0 blades.
 * Install new double-sided F0 fishing rod (need to get blades) and (if necessary) auxiliary !CuBe spring.
 * Check that current defective yaw adjuster is at least locating the suspension in yaw.
 * Remove and service or swap out geophones (one has high noise, one has DC offset, all have flipped pinouts). Could use new geophones originally intended for SRM to save time.
 * Replace geophones and add more arc weights to IP to get a lower frequency.
 * Re-calibrate F0 GAS LVDT.
 * Adjust amount of mass on F0 keystone to get correct height, and secure in place.
 * Confirm the positions of the IP LVDTs and Actuators, and update T1707205 if necessary.
 * Install camera viewport???
=== 2019-02-12 ===
 * Monday is public holiday.
==== Etc ====
 * Wipe inside tanks with Vectra-Alpha wipes and ethanol.

==== BS ====
 * Check focus of BS camera.
 * Debug stepper remote enable.

==== SR2 ====
 * Install GAS filter control loops.
 * Debug stepper remote enable.
 * Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
 * Split model.

==== SR3 ====
 * Debug stepper remote enable.
 * Split model.
Line 35: Line 40:
 * Test new yaw mechanism.
 * Adjust F0 keystone mass to give desired height and secure weights in place.
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Borrow LED from SR2 and check/adjust optic pitch; return LED to SR2.
 * Install Enomoto-kun's beam target plate (if available).
 * Seal geophones.
 * Install geophones and arc weights.
 * Center and tune IP.
 * Install OL viewport (already available).
 * Install camera viewport if available. (At a minimum, remove flange cover temporarily and check that there is a good view of the HR surface.)
 * Hook LBB and add just enough ballast to have it bouncing.
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).
 * Set up OL (needs various parts).

==== SR3 ====
 * Install/test new yaw mechanism.
 * Adjust height.
 * Realign OL.
 * Install camera viewport (already available).
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).

==== SR2 ====
 * Adjust height.
 * Remove tape, writing etc on PI and PI items.
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
 * Install cable for MIF pico on LBB (with Izumi-san-tachi)?
 * Add ballast mass to LBB.
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Set up LEN OL (if/when 3D QPD stage arrives).
 * Debug stepper remote enable.
 * Check BIO connections for possible swap of GAS/IP.
Line 66: Line 45:
== Tasks To Be Scheduled ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
=== Real-Time Model ===
 * See [[KAGRA/Subgroups/VIS/OpsManual/Simulink]]
 * Restart k1vissrmt (Wednesday during maintenance??):
  * Re-convert filter files.
  * Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
  * Make fresh safe.snap.
  * Note all TEST and OPTICALIGN offsets.
  * Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
  * Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
  * Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
  * Restore safe.snap.
  * Debug OVERVIEW, IP and WD screens (check for white channels etc).
  * Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
  * Set new WD thresholds for IP LVDT and ACC.
  * Enable all DAMP, ALIGN, and OPTICALIGN offsets.
  * Make sure SRM Guardian is pointing to generic Type B Guardian.
  * Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
  * Reenable Guardian if/when satisfied.
 * Rebuild and restart k1visbst and initialize/test as for SRM.
 * Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
  * SR2 FECT=54, FECT=55
  * SR3 FECT=56, FECT=57
  * (SRM FECT=58, FECP=59)
 * Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
 * Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
 * For SR2, just before restarting with the new real-time models, power the whole front end down and replug everything into the new power strip.
  * Turn off all DC-powered boxes.
  * Shut down the FE computer using the web server at [[http://10.68.99.171]].
  * Turn off the IO chassis using the switch on the front.
  * Turn off the DC power supplies.
  * Replug all AC-powered stuff (DC supplies, IO chassis, signal generator, routers) into the new power strip that is already there.
  * Restore everything in reverse order.
  * Reset the signal generator: 10 kHz, 5 Vpp, sine wave, ON.
Line 71: Line 79:
==== SR2 ====

==== SR3 ====

==== SRM ====
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.

=== Tunnel ===
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

=== Mitaka or remotely ===
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Install damping filters for SR2.
 * Review DAC channel requests.
 * Split SRx real-time models?

== ASAP ==
 * --(Get picomotor drivers back on line.)--
 * --(Debug BS BIO connections, especially PI IP.)--

=== Main Assembly Sequence ===
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''

 * Necessary for phase-II★★
  * Debug BS geophones.
  * Flip circuit boards in BS geophones to make them the same as SRx.
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.

 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control
Line 126: Line 83:
<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * --(Move safety bars from BS AF area to SR2 area.)--
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Figure out how to make PI yaw adjustment reliable.
Line 139: Line 86:
 * --(Return/replace temporary ballast mass (dog clamps).)--
 * Characterize replacement F0.
 * --(Wipe/clean arc weights that were rained on.)--
Line 144: Line 88:
==== Electrical ====
== Electrical ==
Line 160: Line 105:
==== Real-time and SUMCON models ==== == Real-time and SUMCON models ==
Line 167: Line 112:

== One Day, If Ever Needed ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
==== SR3 ====
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
==== SRM ====
 * Install Enomoto-kun's beam target plate (if/when available).
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-02-12

  • Monday is public holiday.

Etc

  • Wipe inside tanks with Vectra-Alpha wipes and ethanol.

BS

  • Check focus of BS camera.
  • Debug stepper remote enable.

SR2

  • Install GAS filter control loops.
  • Debug stepper remote enable.
  • Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
  • Split model.

SR3

  • Debug stepper remote enable.
  • Split model.

SRM

  • Set up LEN OL (if/when 3D QPD stage arrives).
  • Debug stepper remote enable.
  • Check BIO connections for possible swap of GAS/IP.

Real-Time Model

  • See KAGRA/Subgroups/VIS/OpsManual/Simulink

  • Restart k1vissrmt (Wednesday during maintenance??):
    • Re-convert filter files.
    • Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
    • Make fresh safe.snap.
    • Note all TEST and OPTICALIGN offsets.
    • Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
    • Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
    • Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
    • Restore safe.snap.
    • Debug OVERVIEW, IP and WD screens (check for white channels etc).
    • Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
    • Set new WD thresholds for IP LVDT and ACC.
    • Enable all DAMP, ALIGN, and OPTICALIGN offsets.
    • Make sure SRM Guardian is pointing to generic Type B Guardian.
    • Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
    • Reenable Guardian if/when satisfied.
  • Rebuild and restart k1visbst and initialize/test as for SRM.
  • Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
    • SR2 FECT=54, FECT=55
    • SR3 FECT=56, FECT=57
    • (SRM FECT=58, FECP=59)
  • Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
  • Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
  • For SR2, just before restarting with the new real-time models, power the whole front end down and replug everything into the new power strip.
    • Turn off all DC-powered boxes.
    • Shut down the FE computer using the web server at http://10.68.99.171.

    • Turn off the IO chassis using the switch on the front.
    • Turn off the DC power supplies.
    • Replug all AC-powered stuff (DC supplies, IO chassis, signal generator, routers) into the new power strip that is already there.
    • Restore everything in reverse order.
    • Reset the signal generator: 10 kHz, 5 Vpp, sine wave, ON.

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

One Day, If Ever Needed

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.

SR3

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

KAGRA/Subgroups/VIS/TypeB/ToDo (last edited 2019-12-18 12:38:30 by fabian.arellano)