Line 19: Line 19:
=== 2019-01-27 ===
=== Etc ===
 * Work with Akutsu-san to get additional two camera viewports (for SR2 and SRM).
 * Get rid of all cable reels
 * Currently we don't know where the SFs' and BFs' stepper motor are. We should decide whether we are going to move them soon or once they are in vacuum and in an stable suitable temperature (25 degress for BS/SR2 and 24 degrees for SR3 and SRM).
Line 25: Line 20:
=== SR3 ===
 * Move the IP such that the horizontal stepper motors are in their respective mid-ranges. '''(Terrence Monday morning.)'''
 * Set the IP stops to an appropriate position. Confirm with Hirata-san who released the IP the latest.
 * Confirm the jacks supporting the mushroom head of the vacuum chamber must be withdrawn. If so, do it and center the IP again if necessary. '''(Monday.)'''
 * Centrer the IM in L, T, Y, V and R using the pico-motors. '''(Fabian and Terrence on Monday morning.)'''
 * Work with the alignment team when the yaw adjustment of the optic is required. ''Use the F0 yaw stepper motor''. '''(Maybe Monday.)'''
 * Work with the alignment team when the IM pitch requires adjustment. ''Use the IM pico-motor''. '''(Maybe Monday.)'''
 * Adjust the OSEM to a suitable position in case the pitch adjustment required cannot be achived in their current positions. This requires moving the panels sideways and/or the OSEM bodies in or out.
 * Once the OSEMs have been adjusted hang the optical table again. '''Now it is fixed to allow people sit or stand inside'''.
=== 2019-02-04 ===
==== Etc ====
 * --(Get additional two camera viewports.)--
 * --(Get rid of SRM cable reel.)--
 * --(Run cables for cameras (with Kokeyama-san).)--
 * --(Install BIO config boards on OL whitening filters for SR2, SR3, SRM)--
 * Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
 * Wipe inside tanks with Vectra-Alpha wipes and IPA.
Line 35: Line 29:
=== SR2 (Very similar to SR3's with additional items underlined.) ===
 * Move the IP such that the horizontal stepper motors are in their respective mid-ranges. '''(Tuesday.)'''
 * Set the IP stops to an appropriate position. Confirm status with Enzo and Terrence.
 * Confirm the jacks supporting the mushroom head of the vacuum chamber must be withdrawn. If so, do it and center the IP again if necessary. '''(Tuesday.)'''
 * Centrer the IM in L, T, Y, V and R using the pico-motors. '''(Tuesday.)'''
 * Work with the alignment team when the yaw adjustment of the optic is required. ''Use the F0 yaw stepper motor''.
 * Work with the alignment team when the IM pitch requires adjustment. ''Use the IM pico-motor''.
 * __As requested by Enomoto-kun, work with him in the installation and cabling of the pick up mirror system. '''(Hirata-san has been assigned to this already.)''' __
 * __Fix the optical table to prepare for optic cleaning and OSEM adjustment (as per optic alignment requirement.)__
 * Adjust the OSEM to a suitable position in case the pitch adjustment required cannot be achived in their current positions. This requires moving the panels sideways and/or the OSEM bodies in or out.
 * __Liaise with Mirapro in removing the SR2 bellow at the +Y side. '''(Hirata-san.)'''__
 * Work with Hirose-san in cleaning the optic. '''(Hirata-san.)'''
 * __Once the OSEMs have been adjusted and the optic has been cleaned hang the optical table again.__''''''

=== SR3 (list incomplete!) ===
 * Release the IM/RM/OPT/IP. '''(Fujii-kun and Fabian on Monday afternoon.)'''
 * Change geophones pre-amplifier. '''(Fabian on Monday morning.)'''

=== 2019-01-21 ===
==== Etc ====
 * --(Get the clean-room compatible vacuum machine from KEK people. Notify Hirose-san in case he wants to use it himself.)-- '''(Cancelled)'''
 * Work with Akutsu-san to get additional two camera viewports (for SR2 and SRM).
 * Open all dead geophones, replace preamps, test, seal, retest. --((For BS is was done.)-- For SRM not yet.)
 * Get rid of all cable reels.

==== BS (top priority) ====
 * --(The suspension is not in a healthy state. We should check the IM horizontal OSEM coil driver, satellite amplifier and whether there's anything toching. See klog entry)-- [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7725|7725]].
 * --(Take to the tunnel a spare HPCD (or a modified LPCD) and a satellite amplifier. '''(Fabian on Monday.)''')--
 * --(Fix geophones. '''(Enzo on Wednesday or later.)''')--
 * --(Replace geophones. '''(Enzo whenever is fine for commisiong team.)''')--
 * --(Fix touching issue.)--
 * --(Secure any keystone trim mass. '''(Hirata-san or Fabian on Wednesday of later.)''')--
 * --(Recenter the OL.)--
 * Diagonalization of IP. '''(Enzo)'''
 * Install IP control loops. '''(Enzo)'''
 * Install GAS Filters control loops. '''(Enzo)'''
 * Install IM control loops. '''(Enzo)'''

==== SR3 (priority 2) ====
 * --(Survey optic height )--'''--((Fabian on Monday))-- '''--(and raise suspension on jacks as necessary '''(Enzo, Hirata-san, Terrence and Fabian on Tuesday)''')--.''' '''
 * Reinstall OL LED (original one borrowed for SR2 - probably use new one to be supplied by Simon), probably change collimator, and realign OL. '''(Terrence on Tuesday.)'''
 * --(Secure any keystone trim mass. '''(Hirata-san or Fabian on Tuesday.)''')--
 * Diagonalization of IP. '''(Enzo)'''
 * Install IP control loops. '''(Enzo)'''
 * Install GAS Filters control loops. '''(Enzo)'''
 * Install IM control loops. '''(Enzo)'''
==== BS ====
 * --(Install BNC cables for stepper remote enable.)--
 * Debug stepper remote enable.
 * Debug BS camera.
 
Line 83: Line 36:
 * --(Survey optic height '''(Fabian on Monday)''')-- --(and raise suspension on jacks as necessary. '''(Enzo, Hirata-san, Terrence and Fabian on''' '''Tuesday.)''')--
 * --(Remove tape, writing etc on PI and PI items. '''(Hirata-san on Tuesday.)''')--
 * --(Secure any keystone trim mass. '''(Hirata-san or Fabian on Tuesday.)''')--
 * Diagonalization of IP. '''(Enzo)'''
 * Install IP control loops. '''(Enzo)'''
 * Install GAS Filters control loops. '''(Enzo)'''
 * Install IM control loops. '''(Enzo)'''

==== SRM (postponed) ====
 * Raise suspension 3.5 mm on jacks.
 * Check/improve payload alignment and IM OSEMs. Recheck optic pitch with OL as needed.\
 * Adjust F0 keystone trim to give desired height and secure weights in place.
 * Install geophones and arc weights.
 * Center and tune IP.
 * Hook LBB and add just enough ballast to have it bouncing.
 * Wipe inside tank with Vectra-Alpha wipes and IPA.
 * Set up TILT OL.

=== 2019-01-28 ===
==== BS ====
==== SRM ====
 * Install camera viewport. (Mirapro will be available 1/28)
 * Setup LEN OL.
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).
 * Install Enomoto-kun's beam target plate (when available).
 * --(Release LBB; add approximate final ballast.)--
 * --(Install IM control loops.)--
 * --(Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.)--
 * --(Install BNC cables for stepper remote enable.)--
 * --(Install camera viewport.)--
 * --(Install camera.)--
 * Install GAS filter control loops.
 * Debug stepper remote enable.
 * Split model.
Line 110: Line 47:
 * Install camera viewport (already available).
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).
 * Install camera.
 * Run cables for camera.
 * --(Release the optical table again.)--
 * --(Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.)--
 * --(Add approximate final ballast.)--
 * --(Install camera viewport.)--
 * --(Install camera.)--
 * Debug stepper remote enable.
 * Split model.
Line 115: Line 55:
==== SR2 ====
 * Add camera viewport (when available).
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
 * Install cable for MIF pico on LBB (with Izumi-san-tachi)?
 * Add additional mass to LBB to have it at the desired height
 * Install camera.
 * Run cables for camera.
==== SRM ====
 * --(Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.)--
 * --(Install camera (with Kokeyama-san).)--
 * --(Set up TILT OL.)--
 * --(Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.)--
 * --(Add approximate final ballast.)--
 * --(Split model.)--
 * Set up LEN OL.
 * Debug stepper remote enable.
 * Check BIO connections for possible swap of GAS/IP.
Line 131: Line 74:
 * Install Enomoto-kun's beam target plate (if/when available).
Line 138: Line 82:
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
Line 143: Line 85:
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
Line 149: Line 90:
== ASAP ==
 * --(Get picomotor drivers back on line.)--
 * --(Debug BS BIO connections, especially PI IP.)--

=== Main Assembly Sequence ===
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''

 * Necessary for phase-II★★
  * Debug BS geophones.
  * Flip circuit boards in BS geophones to make them the same as SRx.
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.
  * Diagonalization of IM for SR2, SR3, SRM. Is BS one done?'''(When?)'''

 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control
=== Real-Time Model ===
 * Restart k1vissrmt (Wednesday during maintenance??):
  * Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
  * Make fresh safe.snap.
  * Note all TEST and OPTICALIGN offsets.
  * Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
  * Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
  * Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
  * Restore safe.snap.
  * Debug OVERVIEW, IP and WD screens (check for white channels etc).
  * Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
  * Set new WD thresholds for IP LVDT and ACC.
  * Enable all DAMP, ALIGN, and OPTICALIGN offsets.
  * Make sure SRM Guardian is pointing to generic Type B Guardian.
  * Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
  * Reenable Guardian if/when satisfied.
 * Rebuild and restart k1visbst and initialize/test as for SRM.
 * Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
  * SR2 FECT=54, FECT=55
  * SR3 FECT=56, FECT=57
  * (SRM FECT=58, FECP=59)
 * Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
 * Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
Line 191: Line 125:
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Figure out how to make PI yaw adjustment reliable.
Line 197: Line 129:
 * --(Return/replace temporary ballast mass (dog clamps).)--
 * Characterize replacement F0.
 * --(Wipe/clean arc weights that were rained on.)--

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-02-04

Etc

  • Get additional two camera viewports.

  • Get rid of SRM cable reel.

  • Run cables for cameras (with Kokeyama-san).

  • Install BIO config boards on OL whitening filters for SR2, SR3, SRM

  • Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
  • Wipe inside tanks with Vectra-Alpha wipes and IPA.

BS

  • Install BNC cables for stepper remote enable.

  • Debug stepper remote enable.
  • Debug BS camera.

SR2

  • Release LBB; add approximate final ballast.

  • Install IM control loops.

  • Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.

  • Install BNC cables for stepper remote enable.

  • Install camera viewport.

  • Install camera.

  • Install GAS filter control loops.
  • Debug stepper remote enable.
  • Split model.

SR3

  • Release the optical table again.

  • Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.

  • Add approximate final ballast.

  • Install camera viewport.

  • Install camera.

  • Debug stepper remote enable.
  • Split model.

SRM

  • Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.

  • Install camera (with Kokeyama-san).

  • Set up TILT OL.

  • Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.

  • Add approximate final ballast.

  • Split model.

  • Set up LEN OL.
  • Debug stepper remote enable.
  • Check BIO connections for possible swap of GAS/IP.

Tasks To Be Scheduled

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

SR2

SR3

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

Tunnel

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Split SRx real-time models?

Real-Time Model

  • Restart k1vissrmt (Wednesday during maintenance??):
    • Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
    • Make fresh safe.snap.
    • Note all TEST and OPTICALIGN offsets.
    • Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
    • Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
    • Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
    • Restore safe.snap.
    • Debug OVERVIEW, IP and WD screens (check for white channels etc).
    • Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
    • Set new WD thresholds for IP LVDT and ACC.
    • Enable all DAMP, ALIGN, and OPTICALIGN offsets.
    • Make sure SRM Guardian is pointing to generic Type B Guardian.
    • Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
    • Reenable Guardian if/when satisfied.
  • Rebuild and restart k1visbst and initialize/test as for SRM.
  • Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
    • SR2 FECT=54, FECT=55
    • SR3 FECT=56, FECT=57
    • (SRM FECT=58, FECP=59)
  • Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
  • Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.

  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.