Differences between revisions 27 and 54 (spanning 27 versions)
Revision 27 as of 2019-02-01 19:14:46
Size: 4838
Editor: MarkBarton
Comment:
Revision 54 as of 2019-03-17 00:53:07
Size: 5379
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
== Paper ==
 * --(Review Type Bp paper)--
 * --(Choose paper title)-- -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?
 * --(Create JGWDoc number for paper)-- -> [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9836|P1909836]]
 * --(Decide paper author list)-- -> KAGRA Author List 2019?
 * Write Type B paper abstract
 * Write paper outline
 * Write Type B paper Section 1 Introduction
 * Vibration isolation systems in KAGRA
  * Write Section 2.1 Overview
   * Steal or reproduce Type Bp Figure 1 (optic layout)
   * Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
 * Write Section 2.2 Requirements for Type B
 * Write Section 3 Design of the Type-B suspension
  * Write Section 3.1 Mechanical
   * Choose photo of Type B suspension in mid-air
   * Make diagram of Type B in vacuum chamber
  * Write Section 3.2 Sensors and Actuators
  * Write Section 3.3 Control and Damping
   * Make controls diagram like Type Bp paper Figure 7
 * Write Section 4 Measured performance
  * Write Section 4.1 Damping Time
   * Make decay time plot like Type Bp paper Figure 8
  * Write Section 4.2 Residual Velocity
  * Write Section 4.3 Residual Angular Fluctuations
  * Write Section 4.4 Vibration Isolation Performance
 * Write Section 5 Summary
 * Write Section 6 Acknowledgments
 * Write References Section

Line 11: Line 42:
=== Facilities ===
Line 20: Line 50:
=== 2019-02-04 ===
==== Etc ====
 * Get additional two camera viewports.
 * Get rid of all cable reels
 * Run cables for cameras (with Kokeyama-san).
== 2019-03-18 ==
=== Etc ===
 * Tidy up.
  * Throw out foil and other garbage.
  * Gather and clean tools.
  * Gather and organize unused parts and fasteners.
  * Pull out unused cables in cable tray near SR3.
  * Return all unused cables to tent.
  * Move charging station to more convenient location (e.g., near -X entrance).
 * Make cheat sheet for BIO Config cards and put one in each rack. See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2081| D1302081]]
 
=== BS ===
 * IMPORTANT!!!!!!!!!!!!!!!!!!! Check IP H2 connection!
 * Improve immobilization of OL breadboard.
 * Reinstall LEN OL.
 * Double-check calibration of IP H3 LVDT: is the offset of ≈-805 µm at mechanical zero from klog 8377 correct per previous klogs etc?
=== SR2 ===
 * --Recalibrate OL with improved procedure.--
 * Do pitch/longitudinal decoupling. L2P filter
 * Tidy up cables in rear of SR2 rack.
Line 26: Line 71:
==== BS ====
 * Install BNC cables for stepper remote enable, and debug.
=== SR3 ===
 * Recalibrate OL with improved procedure.
 * Check pico cables (one may have been stolen for SRM).
 * Choose optimum BIO Config board switch settings.
Line 29: Line 76:
==== SR2 ====
 * Check the IP stop height (if there's a excuse to open the tank).
 * Release LBB; add approximate final ballast.
 * Install GAS Filters control loops. '''(Enzo)'''
 * Install IM control loops. '''(Enzo)'''
 * Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.
 * Install BNC cables for stepper remote enable, and debug.
 * Install camera viewport.
 * Install camera.
 * Split model.
=== SRM ===
 * Set up LEN OL.
 * Design/install control filters.
 * Set up SRM Guardian.
 * Check pico adapter cables.
 * Debug 240 Hz noise in LVDT.
 * Get thermometer for SRM booth.
 * Choose optimum BIO Config board switch settings.
Line 40: Line 85:
==== SR3 ====
 * Release the optical table again.
 * Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.
 * Add approximate final ballast.
 * Install camera viewport.
 * Install camera.
 * Debug stepper remote enable.
 * Split model.

==== SRM ====
 * Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.
 * Install camera (with Kokeyama-san).
 * Set up TILT OL.
 * Set up LEN OL.
 * Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.
 * Add approximate final ballast.
 * Wipe inside tank with Vectra-Alpha wipes and IPA.
 * Debug stepper remote enable.
 * Install Enomoto-kun's beam target plate (if/when available).
 * Split model.

== Tasks To Be Scheduled ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

==== SR2 ====
==== SR3 ====
==== SRM ====
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

=== Tunnel ===
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

=== Mitaka or remotely ===
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Install damping filters for SR2.
 * Review DAC channel requests.
 * Split SRx real-time models?

== ASAP ==


=== Documentation and Operation Manual ===
 * Add useful info from Enzo's notebook to BSData.

<<Anchor(RealBSHang)>>

== Tasks Not To Forget ==
=== Major Tasks ===
 * --(Move safety bars from BS AF area to SR2 area.)--
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.

=== Minor Tasks ===
==== Mechanical ====
== Minor Tasks ==
=== Mechanical ===
Line 107: Line 91:
==== Electrical ==== == Electronics ==
 * Install Tanaka-san's LVDT sig gen cards (when available).
 * Test stepper remote enable system.
 * Put SR3 cleanbooth electronics in minirack.
Line 110: Line 97:
  * Organize stepper reset system and watchdog BIO.   * Add stepper remote enable system.
 * Include watchdog.
Line 113: Line 101:
  * Add default and as-built stepper channel assignments.
Line 123: Line 112:
==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
== Real-time and SUMCON models ==
Line 126: Line 114:
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)  * Make table of ADC/DAC assignments and check for consistency with D1503600.
Line 130: Line 118:

== Guardian ==

== Documentation and Operation Manual ==
 * Add useful info from Enzo's notebook to BSData/etc.

== OLs ==
 * Design/procure/install permanent hard protective boxes.

== One Day, If Ever Needed ==
=== BS ===
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

=== SR3 ===
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

=== SRM ===
 * Install Enomoto-kun's beam target plate (if/when available).
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Paper

  • Review Type Bp paper

  • Choose paper title -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?

  • Create JGWDoc number for paper -> P1909836

  • Decide paper author list -> KAGRA Author List 2019?

  • Write Type B paper abstract
  • Write paper outline
  • Write Type B paper Section 1 Introduction
  • Vibration isolation systems in KAGRA
    • Write Section 2.1 Overview
      • Steal or reproduce Type Bp Figure 1 (optic layout)
      • Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
  • Write Section 2.2 Requirements for Type B
  • Write Section 3 Design of the Type-B suspension
    • Write Section 3.1 Mechanical
      • Choose photo of Type B suspension in mid-air
      • Make diagram of Type B in vacuum chamber
    • Write Section 3.2 Sensors and Actuators
    • Write Section 3.3 Control and Damping
      • Make controls diagram like Type Bp paper Figure 7
  • Write Section 4 Measured performance
    • Write Section 4.1 Damping Time
      • Make decay time plot like Type Bp paper Figure 8
    • Write Section 4.2 Residual Velocity
    • Write Section 4.3 Residual Angular Fluctuations
    • Write Section 4.4 Vibration Isolation Performance
  • Write Section 5 Summary
  • Write Section 6 Acknowledgments
  • Write References Section

Every Week

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-03-18

Etc

  • Tidy up.
    • Throw out foil and other garbage.
    • Gather and clean tools.
    • Gather and organize unused parts and fasteners.
    • Pull out unused cables in cable tray near SR3.
    • Return all unused cables to tent.
    • Move charging station to more convenient location (e.g., near -X entrance).
  • Make cheat sheet for BIO Config cards and put one in each rack. See D1302081

BS

  • IMPORTANT!!!!!!!!!!!!!!!!!!! Check IP H2 connection!
  • Improve immobilization of OL breadboard.
  • Reinstall LEN OL.
  • Double-check calibration of IP H3 LVDT: is the offset of ≈-805 µm at mechanical zero from klog 8377 correct per previous klogs etc?

SR2

  • --Recalibrate OL with improved procedure.--
  • Do pitch/longitudinal decoupling. L2P filter
  • Tidy up cables in rear of SR2 rack.

SR3

  • Recalibrate OL with improved procedure.
  • Check pico cables (one may have been stolen for SRM).
  • Choose optimum BIO Config board switch settings.

SRM

  • Set up LEN OL.
  • Design/install control filters.
  • Set up SRM Guardian.
  • Check pico adapter cables.
  • Debug 240 Hz noise in LVDT.
  • Get thermometer for SRM booth.
  • Choose optimum BIO Config board switch settings.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electronics

  • Install Tanaka-san's LVDT sig gen cards (when available).
  • Test stepper remote enable system.
  • Put SR3 cleanbooth electronics in minirack.
  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Add stepper remote enable system.
    • Include watchdog.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Add default and as-built stepper channel assignments.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600.
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

Guardian

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData/etc.

OLs

  • Design/procure/install permanent hard protective boxes.

One Day, If Ever Needed

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

SR3

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

KAGRA/Subgroups/VIS/TypeB/ToDo (last edited 2019-12-18 12:38:30 by fabian.arellano)