Differences between revisions 30 and 31
Revision 30 as of 2019-02-08 10:45:40
Size: 6526
Editor: MarkBarton
Comment:
Revision 31 as of 2019-02-08 11:13:52
Size: 6837
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 112: Line 112:
 * Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.  * Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
 * For SR2, just before restarting with the new real-time models, power the whole front end down and replug everything into the new power strip.
  * Turn off all DC-powered boxes.
  * Shut down the FE computer using the web server at [[http://10.68.99.171]].
  * Turn off the IO chassis using the switch on the front.
  * Turn off the DC power supplies.
  * Replug all AC-powered stuff (DC supplies, IO chassis, signal generator, routers) into the new power strip that is already there.
  * Restore everything in reverse order.
  * Reset the signal generator: 10 kHz, 5 Vpp, sine wave, ON.
Line 116: Line 124:

<<Anchor(RealBSHang)>>

== Tasks Not To Forget ==
=== Major Tasks ===
 * --(Move safety bars from BS AF area to SR2 area.)--
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-02-04

Etc

  • Get additional two camera viewports.

  • Get rid of SRM cable reel.

  • Run cables for cameras (with Kokeyama-san).

  • Install BIO config boards on OL whitening filters for SR2, SR3, SRM

  • Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
  • Wipe inside tanks with Vectra-Alpha wipes and IPA.

BS

  • Install BNC cables for stepper remote enable.

  • Debug stepper remote enable.
  • Debug BS camera.

SR2

  • Release LBB; add approximate final ballast.

  • Install IM control loops.

  • Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.

  • Install BNC cables for stepper remote enable.

  • Install camera viewport.

  • Install camera.

  • Install GAS filter control loops.
  • Debug stepper remote enable.
  • Split model.

SR3

  • Release the optical table again.

  • Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.

  • Add approximate final ballast.

  • Install camera viewport.

  • Install camera.

  • Debug stepper remote enable.
  • Split model.

SRM

  • Decide buoyancy correction and pre-apply as much as possible, leaving optic at nominal height.

  • Install camera (with Kokeyama-san).

  • Set up TILT OL.

  • Adjust LBB damper and rods to give correct height and gap at mid-range on the blades.

  • Add approximate final ballast.

  • Split model.

  • Set up LEN OL.
  • Debug stepper remote enable.
  • Check BIO connections for possible swap of GAS/IP.

Tasks To Be Scheduled

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

SR2

SR3

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

Tunnel

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Split SRx real-time models?

Real-Time Model

  • Restart k1vissrmt (Wednesday during maintenance??):
    • Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
    • Make fresh safe.snap.
    • Note all TEST and OPTICALIGN offsets.
    • Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
    • Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
    • Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
    • Restore safe.snap.
    • Debug OVERVIEW, IP and WD screens (check for white channels etc).
    • Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
    • Set new WD thresholds for IP LVDT and ACC.
    • Enable all DAMP, ALIGN, and OPTICALIGN offsets.
    • Make sure SRM Guardian is pointing to generic Type B Guardian.
    • Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
    • Reenable Guardian if/when satisfied.
  • Rebuild and restart k1visbst and initialize/test as for SRM.
  • Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
    • SR2 FECT=54, FECT=55
    • SR3 FECT=56, FECT=57
    • (SRM FECT=58, FECP=59)
  • Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
  • Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
  • For SR2, just before restarting with the new real-time models, power the whole front end down and replug everything into the new power strip.
    • Turn off all DC-powered boxes.
    • Shut down the FE computer using the web server at http://10.68.99.171.

    • Turn off the IO chassis using the switch on the front.
    • Turn off the DC power supplies.
    • Replug all AC-powered stuff (DC supplies, IO chassis, signal generator, routers) into the new power strip that is already there.
    • Restore everything in reverse order.
    • Reset the signal generator: 10 kHz, 5 Vpp, sine wave, ON.

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

KAGRA/Subgroups/VIS/TypeB/ToDo (last edited 2019-12-18 12:38:30 by fabian.arellano)