Line 26: Line 26:
 * Check focus of BS camera.
Line 43: Line 44:
== One Day, If Ever Needed ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

==== SR2 ====
==== SR3 ====
==== SRM ====
 * Install Enomoto-kun's beam target plate (if/when available).
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.
Line 102: Line 89:
==== Electrical ==== == Electrical ==
Line 118: Line 105:
==== Real-time and SUMCON models ==== == Real-time and SUMCON models ==
Line 133: Line 120:
 * ==== SRM ====
 * Install Enomoto-kun's beam target plate (if/when available).
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-02-12

  • Monday is public holiday.

Etc

  • Wipe inside tanks with Vectra-Alpha wipes and ethanol.

BS

  • Check focus of BS camera.
  • Debug stepper remote enable.

SR2

  • Install GAS filter control loops.
  • Debug stepper remote enable.
  • Get rid of SR2 cable reel (shutdown FE and rack, replug everything into new power strip, start up rack and FE).
  • Split model.

SR3

  • Debug stepper remote enable.
  • Split model.

SRM

  • Set up LEN OL (if/when 3D QPD stage arrives).
  • Debug stepper remote enable.
  • Check BIO connections for possible swap of GAS/IP.

Real-Time Model

  • See KAGRA/Subgroups/VIS/OpsManual/Simulink

  • Restart k1vissrmt (Wednesday during maintenance??):
    • Re-convert filter files.
    • Stop SRM Guardian (just stop it dead - don't transition to SAFE; don't let it meddle at all).
    • Make fresh safe.snap.
    • Note all TEST and OPTICALIGN offsets.
    • Put large ramp times (≈30++ s) in all DAMP, TEST and OPTICALIGN filters.
    • Turn off all DAMP, TEST, and OPTICALIGN filter offsets and master switch.
    • Restart k1vissrmt. If there are gross problems, consider restarting the whole FE.
    • Restore safe.snap.
    • Debug OVERVIEW, IP and WD screens (check for white channels etc).
    • Restore OPTICALIGN offsets (if necessary), transfer TEST offsets to new ALIGN filters and set long ramp times.
    • Set new WD thresholds for IP LVDT and ACC.
    • Enable all DAMP, ALIGN, and OPTICALIGN offsets.
    • Make sure SRM Guardian is pointing to generic Type B Guardian.
    • Adjust Type B Guardian code to set long ramp times on all DAMP, ALIGN and OPTICALIGN filters. Wrap the ALIGN stuff in an if block for now to not break BS/SR2/SR3.
    • Reenable Guardian if/when satisfied.
  • Rebuild and restart k1visbst and initialize/test as for SRM.
  • Create new k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p based on k1vissrmt and k1vissrmp. Be sure to update DCUID numbers:
    • SR2 FECT=54, FECT=55
    • SR3 FECT=56, FECT=57
    • (SRM FECT=58, FECP=59)
  • Update DCUID numbers also in /opt/rtcds/userapps/release/vis/common/medm/vissr2_overview_macro.txt and vissr3_overview_macro.txt.
  • Rebuild, restart k1vissr2t, k1vissr2p, k1vissr3t, k1vissr3p and initialize/test as for SRM/BS.
  • For SR2, just before restarting with the new real-time models, power the whole front end down and replug everything into the new power strip.
    • Turn off all DC-powered boxes.
    • Shut down the FE computer using the web server at http://10.68.99.171.

    • Turn off the IO chassis using the switch on the front.
    • Turn off the DC power supplies.
    • Replug all AC-powered stuff (DC supplies, IO chassis, signal generator, routers) into the new power strip that is already there.
    • Restore everything in reverse order.
    • Reset the signal generator: 10 kHz, 5 Vpp, sine wave, ON.

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

One Day, If Ever Needed

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.

SR3

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.