Archived items are at ../ToDoOld.
Line 3: Line 4:
Archived items are at [[../ToDoOld]]. [[#EveryWeek|Every Week]]
Line 5: Line 6:
[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]
[[#ComingWeeks|Coming Weeks]]
Line 10: Line 9:

== Paper ==
 * --(Review Type Bp paper)--
 * --(Choose paper title)-- -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?
 * --(Create JGWDoc number for paper)-- -> [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9836|P1909836]]
 * --(Decide paper author list)-- -> KAGRA Author List 2019?
 * Write Type B paper abstract
 * Write paper outline
 * Write Type B paper Section 1 Introduction
 * Vibration isolation systems in KAGRA
  * Write Section 2.1 Overview
   * Steal or reproduce Type Bp Figure 1 (optic layout)
   * Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
 * Write Section 2.2 Requirements for Type B
 * Write Section 3 Design of the Type-B suspension
  * Write Section 3.1 Mechanical
   * Choose photo of Type B suspension in mid-air
   * Make diagram of Type B in vacuum chamber
  * Write Section 3.2 Sensors and Actuators
  * Write Section 3.3 Control and Damping
   * Make controls diagram like Type Bp paper Figure 7
 * Write Section 4 Measured performance
  * Write Section 4.1 Damping Time
   * Make decay time plot like Type Bp paper Figure 8
  * Write Section 4.2 Residual Velocity
  * Write Section 4.3 Residual Angular Fluctuations
  * Write Section 4.4 Vibration Isolation Performance
 * Write Section 5 Summary
 * Write Section 6 Acknowledgments
 * Write References Section
Line 16: Line 46:
 * Get stuff from [[../WishList]]  * Get stuff from ../WishList

<<Anchor(ComingWeeks)>>
Line 19: Line 51:
<<Anchor(ComingWeeks)>>
=== 2019-01-07,14,21 ===
==== BS (top priority) ====
 * --(Check that the suspension is floating. (It wasn't.))--
 * --(Re-center OL and log value to capture yaw position. (We didn't bother because the chain wasn't in a good enough condition.))--
 * --(Remove bolts (or wait for Mirapro to do).)--
 * --(Remove tank lid.)--
 * --(Look for cracks in F0 blades.)--
 * --(Install new double-sided F0 fishing rod (need to get blades) and (if necessary) auxiliary !CuBe spring.)--
 * Test new F0 FR.
 * Center new F0 FR (mid-range height is 75 mm).
 * --(Adjust amount of mass on F0 keystone to get correct height)--, and secure in place.
 * --(Check that current defective yaw adjuster is at least locating the suspension in yaw.)--
 * Remove and service or swap out geophones (one has high noise, one has DC offset, all have flipped pinouts). Could use new geophones originally intended for SRM to save time.
 * Swap in new cables for geophones and other items.
 * Add longer studs for arc weights.
 * Replace geophones and add more arc weights to IP to get a lower frequency.
 * Re-calibrate the F0 GAS LVDT.
 * --(Confirm the positions of the IP LVDTs and Actuators)--, and update T1707205 if necessary.
 * Recenter the OL.
=== 2019-03-04 ===
==== Etc ====
 * Help Fujii-kun with PRx.
Line 40: Line 55:
==== SRM ====
 * Test new yaw mechanism.
 * Adjust F0 keystone mass to give desired height and secure weights in place.
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Borrow LED from SR2 and check/adjust optic pitch; return LED to SR2.
 * Install Enomoto-kun's beam target plate (if available).
 * Seal geophones.
 * Install geophones and arc weights.
 * Center and tune IP.
 * Install OL viewport (already available).
 * Install camera viewport (when available). (At a minimum, in the short term, remove flange cover temporarily and check that there is a good view of the HR surface.)
 * Hook LBB and add just enough ballast to have it bouncing.
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).
 * Set up OL (needs various parts).
==== All ====
 * Test stepper remote enable system.
 * Choose optimum BIO Config board switch settings for all OLs. See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2081| D1302081]] for what each switch does. Four of them are gain stages (24 dB, 12 dB, 6 dB, 3 dB), and three are filters (all 1 Hz zero, 10 Hz pole). Please clarify the switch numbering and functions (switch "1" = circuit board B0 = group 1, filter A1; position 1 = enable?), make a cheat sheet and put a copy in each rack.
Line 55: Line 59:
==== SR3 ====
 * Install/test new yaw mechanism.
 * Adjust height.
 * Realign OL.
 * Install camera viewport (already available).
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Add additional ballast to LBB to set desired height (only if someone will be putting stuff on it).
==== BS ====
 * Offload large IM/IRM yaw to IP or F0 yaw.
 
Line 64: Line 63:
 * Adjust height.
 * Remove tape, writing etc on PI and PI items.
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
 * Install cable for MIF pico on LBB (with Izumi-san-tachi)?
 * Add ballast mass to LBB.
 * Measure height of RM/TM relative to SS and height of SS relative to tank or Telada-san's reference. Raise suspension on jacks if necessary.
 * Add camera viewport (when available).


== Tasks To Be Scheduled ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

==== SR2 ====
 * Redo control filters for new topology.
 * Damping time measurements.
Line 83: Line 68:
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.
 * Debug OL, especially whitening filter. Note that WF S1808108 has a mysterious note on its JGWDoc page suggesting it may have a fault.
 * Set up LEN OL (if/when 3D QPD stage arrives).
Line 89: Line 71:
=== Tunnel ===
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

=== Mitaka or remotely ===
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Install damping filters for SR2.
 * Review DAC channel requests.
 * Split SRx real-time models?

== ASAP ==
 * --(Get picomotor drivers back on line.)--
 * --(Debug BS BIO connections, especially PI IP.)--

=== Main Assembly Sequence ===
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''

 * Necessary for phase-II★★
  * Debug BS geophones.
  * Flip circuit boards in BS geophones to make them the same as SRx.
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.

 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control
=== Real-Time Model/Guardian ===
 * See [[KAGRA/Subgroups/VIS/OpsManual/Simulink]]
 * Test Guardians.
Line 134: Line 78:
<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * --(Move safety bars from BS AF area to SR2 area.)--
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Figure out how to make PI yaw adjustment reliable.
Line 147: Line 81:
 * --(Return/replace temporary ballast mass (dog clamps).)--
 * Characterize replacement F0.
 * --(Wipe/clean arc weights that were rained on.)--
Line 152: Line 83:
==== Electrical ====
== Electrical ==
Line 168: Line 100:
==== Real-time and SUMCON models ==== == Real-time and SUMCON models ==
Line 175: Line 107:

== One Day, If Ever Needed ==
==== BS ====
 * Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
 * Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
==== SR3 ====
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
==== SRM ====
 * Install Enomoto-kun's beam target plate (if/when available).
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Paper

  • Review Type Bp paper

  • Choose paper title -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?

  • Create JGWDoc number for paper -> P1909836

  • Decide paper author list -> KAGRA Author List 2019?

  • Write Type B paper abstract
  • Write paper outline
  • Write Type B paper Section 1 Introduction
  • Vibration isolation systems in KAGRA
    • Write Section 2.1 Overview
      • Steal or reproduce Type Bp Figure 1 (optic layout)
      • Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
  • Write Section 2.2 Requirements for Type B
  • Write Section 3 Design of the Type-B suspension
    • Write Section 3.1 Mechanical
      • Choose photo of Type B suspension in mid-air
      • Make diagram of Type B in vacuum chamber
    • Write Section 3.2 Sensors and Actuators
    • Write Section 3.3 Control and Damping
      • Make controls diagram like Type Bp paper Figure 7
  • Write Section 4 Measured performance
    • Write Section 4.1 Damping Time
      • Make decay time plot like Type Bp paper Figure 8
    • Write Section 4.2 Residual Velocity
    • Write Section 4.3 Residual Angular Fluctuations
    • Write Section 4.4 Vibration Isolation Performance
  • Write Section 5 Summary
  • Write Section 6 Acknowledgments
  • Write References Section

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-03-04

Etc

  • Help Fujii-kun with PRx.

All

  • Test stepper remote enable system.
  • Choose optimum BIO Config board switch settings for all OLs. See D1302081 for what each switch does. Four of them are gain stages (24 dB, 12 dB, 6 dB, 3 dB), and three are filters (all 1 Hz zero, 10 Hz pole). Please clarify the switch numbering and functions (switch "1" = circuit board B0 = group 1, filter A1; position 1 = enable?), make a cheat sheet and put a copy in each rack.

BS

  • Offload large IM/IRM yaw to IP or F0 yaw.

SR2

  • Redo control filters for new topology.
  • Damping time measurements.

SR3

SRM

  • Debug OL, especially whitening filter. Note that WF S1808108 has a mysterious note on its JGWDoc page suggesting it may have a fault.
  • Set up LEN OL (if/when 3D QPD stage arrives).

Real-Time Model/Guardian

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

One Day, If Ever Needed

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.

SR3

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.