Line 42: Line 42:
=== Facilities ===
Line 51: Line 50:
=== 2019-02-12 ===
 * Monday is public holiday.
==== Etc ====
== 2019-03-18 ==
=== Etc ===
 * Tidy up.
  * Throw out foil and other garbage.
  * Gather and clean tools.
  * Gather and organize unused parts and fasteners.
  * Pull out unused cables in cable tray near SR3.
  * Return all unused cables to tent.
  * Move charging station to more convenient location (e.g., near -X entrance).
 * Make cheat sheet for BIO Config cards and put one in each rack. See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2081| D1302081]]
 
=== BS ===
 * Improve immobilization of OL breadboard.
 * Reinstall LEN OL.
 * Double-check calibration of IP H3 LVDT: is the offset of ≈-805 µm at mechanical zero from klog 8377 correct per previous klogs etc?
=== SR2 ===
 * Recalibrate OL with improved procedure.
 * Do pitch/longitudinal decoupling.
 * Tidy up cables in rear of SR2 rack.
Line 55: Line 70:
==== All ====
 * --(Debug stepper remote enable.)--
 * --(Do survey of numbering of coil drivers and corresponding Contec assignments.)--
 * Choose optimum BIO Config board switch settings for all OLs. See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2081| D1302081]] for what each switch does. Four of them are gain stages (24 dB, 12 dB, 6 dB, 3 dB), and three are filters (all 1 Hz zero, 10 Hz pole). Please clarify the switch numbering and functions (switch "1" = circuit board B0 = group 1, filter A1; position 1 = enable?), make a cheat sheet and put a copy in each rack.
=== SR3 ===
 * Recalibrate OL with improved procedure.
 * Check pico cables (one may have been stolen for SRM).
 * Choose optimum BIO Config board switch settings.
Line 60: Line 75:
==== BS ====
 * Offload large IM/IRM yaw to IP or F0 yaw.
 
==== SR2 ====
 * --(Install GAS filter control loops.)--
=== SRM ===
 * Set up LEN OL.
 * Design/install control filters.
 * Set up SRM Guardian.
 * Check pico adapter cables.
 * Debug 240 Hz noise in LVDT.
 * Get thermometer for SRM booth.
 * Choose optimum BIO Config board switch settings.
Line 66: Line 84:
==== SR3 ====

==== SRM ====
 * --(Debug geophone channels!!!)--
 * Debug OL, especially whitening filter. Note that WF S1808108 has a mysterious note on its JGWDoc page suggesting it may have a fault.
 * Set up LEN OL (if/when 3D QPD stage arrives).
 * --(Check BIO connections for possible swap of GAS/IP.)--

=== Real-Time Model/Guardian ===
 * See [[KAGRA/Subgroups/VIS/OpsManual/Simulink]]
 * --(Work out what IM1 and IM2 items of BIO section are actually driving based on the rack survey.)--
 * --(Correct all user-facing text on BIO MEDM screen (e.g., "SRM IM-H MONITORS LPCD #1 = Contec #1L") to reflect reality.)--
 * --(Rename all IM1 and IM2 items in RTM to IMH and IMV per above.)--
 * --(Do a new BIO screen that points to new IMH and IMV channels (use search and replace in GEDIT), but keep the old version for the time being.)--
 * --(Finalize models.)--
 *
 * Make a new Type B Guardian and edit it to drive all the new model features and ignore the removed bits.
  * --(-ALIGN blocks)--
  * --(-OPTICALIGN blocks.)--
  * --(+SET blocks.)--
  * --(+DCCTRL blocks)--
 * --(Have the transition from the SAFE state to the DAMPED state load the ALIGN offsets with long ramp times.)--
 * --(Have the transition from the DAMPED state to the ALIGNED state load the OPTICALIGN offsets with long ramp times and also enable damping).)--

=== Documentation and Operation Manual ===
 * Add useful info from Enzo's notebook to BSData.

=== Minor Tasks ===
==== Mechanical ====
== Minor Tasks ==
=== Mechanical ===
Line 99: Line 90:
== Electrical == == Electronics ==
 * Install Tanaka-san's LVDT sig gen cards (when available).
 * Test stepper remote enable system.
 * Put SR3 cleanbooth electronics in minirack.
Line 102: Line 96:
  * Organize stepper reset system and watchdog BIO.   * Add stepper remote enable system.
 * Include watchdog.
Line 105: Line 100:
  * Add default and as-built stepper channel assignments.
Line 116: Line 112:
 * Create SUMCON models for full BS and major installation milestones.
Line 118: Line 113:
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)  * Make table of ADC/DAC assignments and check for consistency with D1503600.
Line 123: Line 118:
== Guardian ==

== Documentation and Operation Manual ==
 * Add useful info from Enzo's notebook to BSData/etc.

== OLs ==
 * Design/procure/install permanent hard protective boxes.
Line 124: Line 127:
==== BS ==== === BS ===
Line 127: Line 130:
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
==== SR3 ====

=== SR3 ===
Line 130: Line 133:
==== SRM ====
=== SRM ===
Line 132: Line 136:
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.

VIS Type B To-Do List

Archived items are at ../ToDoOld.

Every Week

Coming Weeks

Paper

  • Review Type Bp paper

  • Choose paper title -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?

  • Create JGWDoc number for paper -> P1909836

  • Decide paper author list -> KAGRA Author List 2019?

  • Write Type B paper abstract
  • Write paper outline
  • Write Type B paper Section 1 Introduction
  • Vibration isolation systems in KAGRA
    • Write Section 2.1 Overview
      • Steal or reproduce Type Bp Figure 1 (optic layout)
      • Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
  • Write Section 2.2 Requirements for Type B
  • Write Section 3 Design of the Type-B suspension
    • Write Section 3.1 Mechanical
      • Choose photo of Type B suspension in mid-air
      • Make diagram of Type B in vacuum chamber
    • Write Section 3.2 Sensors and Actuators
    • Write Section 3.3 Control and Damping
      • Make controls diagram like Type Bp paper Figure 7
  • Write Section 4 Measured performance
    • Write Section 4.1 Damping Time
      • Make decay time plot like Type Bp paper Figure 8
    • Write Section 4.2 Residual Velocity
    • Write Section 4.3 Residual Angular Fluctuations
    • Write Section 4.4 Vibration Isolation Performance
  • Write Section 5 Summary
  • Write Section 6 Acknowledgments
  • Write References Section

Every Week

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2019-03-18

Etc

  • Tidy up.
    • Throw out foil and other garbage.
    • Gather and clean tools.
    • Gather and organize unused parts and fasteners.
    • Pull out unused cables in cable tray near SR3.
    • Return all unused cables to tent.
    • Move charging station to more convenient location (e.g., near -X entrance).
  • Make cheat sheet for BIO Config cards and put one in each rack. See D1302081

BS

  • Improve immobilization of OL breadboard.
  • Reinstall LEN OL.
  • Double-check calibration of IP H3 LVDT: is the offset of ≈-805 µm at mechanical zero from klog 8377 correct per previous klogs etc?

SR2

  • Recalibrate OL with improved procedure.
  • Do pitch/longitudinal decoupling.
  • Tidy up cables in rear of SR2 rack.

SR3

  • Recalibrate OL with improved procedure.
  • Check pico cables (one may have been stolen for SRM).
  • Choose optimum BIO Config board switch settings.

SRM

  • Set up LEN OL.
  • Design/install control filters.
  • Set up SRM Guardian.
  • Check pico adapter cables.
  • Debug 240 Hz noise in LVDT.
  • Get thermometer for SRM booth.
  • Choose optimum BIO Config board switch settings.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS

Electronics

  • Install Tanaka-san's LVDT sig gen cards (when available).
  • Test stepper remote enable system.
  • Put SR3 cleanbooth electronics in minirack.
  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Add stepper remote enable system.
    • Include watchdog.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Add default and as-built stepper channel assignments.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600.
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

Guardian

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData/etc.

OLs

  • Design/procure/install permanent hard protective boxes.

One Day, If Ever Needed

BS

  • Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
  • Replace BS F0 thrust bearing and yaw adjuster - BIG JOB, DON'T BOTHER (unless lack of yaw adjustment becomes a major problem).

SR3

  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

SRM

  • Install Enomoto-kun's beam target plate (if/when available).
  • Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.