VIS Type B To-Do List
Archived items are at ../ToDoOld.
Paper
Review Type Bp paper
Choose paper title -> "Vibration isolation systems for the beam splitter and signal recycling mirrors of the KAGRA gravitational wave detector"?
Create JGWDoc number for paper -> P1909836
Decide paper author list -> KAGRA Author List 2019?
- Write Type B paper abstract
- Write paper outline
- Write Type B paper Section 1 Introduction
- Vibration isolation systems in KAGRA
- Write Section 2.1 Overview
- Steal or reproduce Type Bp Figure 1 (optic layout)
- Steal or reproduce Type Bp paper Figure 2 (suspension comparison)
- Write Section 2.1 Overview
- Write Section 2.2 Requirements for Type B
- Write Section 3 Design of the Type-B suspension
- Write Section 3.1 Mechanical
- Choose photo of Type B suspension in mid-air
- Make diagram of Type B in vacuum chamber
- Write Section 3.2 Sensors and Actuators
- Write Section 3.3 Control and Damping
- Make controls diagram like Type Bp paper Figure 7
- Write Section 3.1 Mechanical
- Write Section 4 Measured performance
- Write Section 4.1 Damping Time
- Make decay time plot like Type Bp paper Figure 8
- Write Section 4.2 Residual Velocity
- Write Section 4.3 Residual Angular Fluctuations
- Write Section 4.4 Vibration Isolation Performance
- Write Section 4.1 Damping Time
- Write Section 5 Summary
- Write Section 6 Acknowledgments
- Write References Section
- Find Type A reference
- Find cryogenic payload reference
- Find bKAGRA reference
- Find LIGO-India reference
Find NS-NS detection reference
Find initial detection reference
Tunnel
- Tidy up.
- Move charging station to more convenient location (e.g., near -X entrance).
- Find and inventory all gluing tools.
- Put pointy-tipped screw in RM trolley for BS
- Put FC on SRM-W and install it in its holder with 1.4 mm shims ready for possible use.
Shakedown/Characterization
BS
- Measure decay time, rms with and without control.
- Do geophone blending.
SR2
Measure decay time, rms with and without control.
- Do FEA model of IRM side plates.
Do geophone blending.
SR3
- Measure decay time, rms with and without control.
- Put SR3 cleanbooth electronics in minirack.
- Check pico adapter cables.
- Do geophone blending.
SRM
- Check pico adapter cables.
- Debug 240 Hz noise in LVDT.
- Measure decay time, rms with and without control.
- Check keystone lock screws in BF (on next vent).
- Do geophone blending.
SDF
- Document SDF in Operations Manual
- Make SDF states for Type B, e.g.:
- SAFE
- DCCTRL-ONLY
- ALIGNED-IN-AIR
- ALIGNED-IN-VACUUM
MEDM
- Fix DAC screen (split model issue).
Guardian
- Rethink Guardian to avoid going back to SAFE for minor problems.
- Consider splitting Type B Guardian into tower and payload sections with possible third monitor Guardian overseeing both.
RTM
- Make cycle times of BS models the same as for SRx.
Change the DAQ channel lists per Shoda-san's final design.
- Remove TM_OSEM subsystem from payload model.
- Remove GEOWHITEN from IP of top model.
Remove ISIINF->CART2EUL->ISIWIT from IM.
- WD/Guardian related
- Add temperature alarms.
- Add secondary watchdog with lower threshold that puts all outputs to HOLD and then gets Guardian to ramp them down.
Simulation
Create controls design description (cf LIGO-T1100378).
Get a good set of TFs and put them in a common directory:
Directory: /kagra/Dropbox/Subsystems/VIS/TypeBData/SR2/simulation/TF/
Content: diaggui xml files and regular text files.
Compare the Matlab prediction with the measurements.
In a reasonable way tune the parameters of the simulation in ordet to get a good agreement.
It should include resonant peaks not predicted by the simulation.
Write a klog about this.
Given the fact that Takanori's Matlab simulation provides the TFs in units of [m/N] calculate a calibration factor for each GAS LVDT and IP and IM virtual actuator, which are in units of [µm/cnt].
- Collect the measurements of LVDT and OSEM readout noise and put them in a common directory:
- Location: /kagra/Dropbox/Subsystems/VIS/TypeBData/SR2/simulation/sensor_readout_noise/
- Content: duaggui xml files and regular text files.
- Check Panwei's measurements of OSEM noise. Pay special attention to the conversion into m/rtHz from V/rtHz.
- Calculate the readut noise of the virtual sensors from the readout noise of the real ones.
- Estimate coil driver noise. It seems this is not expected to contribute significantly but we should still know.
- Convert real actuation noise to virtual actuation noise.
Check whether the Matlab simulation implements the output of the length sensing oplev.
Extract the filters designed by Enzo, Terrence and Lucia from the filter bank using Foton and write them in a format compatible with Takanori's simulation: IP LVDT, IP GEO, blending filters, GAS, IM, optic.
- Check the whether the oplev takes into account the ground motion movement in
- longitudinal displacement: NO
- Pitch and yaw
- In the simulation, what are the assumed coupling between
- Does the simulation take into account the 1/300 rads of the tunnel slope?
- In the software modify the control feeback loop topology in order to have the same as in the real system.
- Tune the filters in order to account for the differences between simulation and measurement.
- As sanity check for the simulation, check the stability criteria and compare with Enzo's.
- Ask whether there is a recent measurement of seismic motion at the the central room.
Electronics
- Pick better resistor values for sat amps (to give closer to 32K open-light values).
- Install Tanaka-san's LVDT sig gen cards when available).
- Install Tanaka-san's hardware watchdogs.
- Test and permanently enable stepper remote enable system.
- Update BS Circuit diagram, D1503600
Make generic to Type B.
Note removal of LED/PD on TM OSEMs.
Add stepper remote enable system.
Add note about gender-changers and non-flipping feedthrough adapters.
Correct default stepper channel assignments and link to wiki for changes.
Remove note about steppers with limit switches (we didn't use them).
Include LVDT pin size (1 mm).
Include Stepper pin size (1.6 mm).
Undo renumbering of IP items.
Page 10: "DIO Card # 0" should be "DIO Card # 1"
Include OutConfigBoards on OL page (Sheet 18).
Update HPCD section to reflect:
All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.
Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.
Include blank page for watchdog.
Include actual watchdog.
- Include information on assignment of channels to feedthrough positions (or summarize on wiki and add link).
Documentation and Operation Manual
- Add useful info from Enzo's notebook to BSData/etc.
OLs
- Design/procure/install permanent hard protective boxes.
- Tweak whitening filter gains.
One Day, If Ever Needed
BS
- Tune BS LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
- Replace BS F0 thrust bearing - BIG JOB - NOT WORTH IT.
- Replace BS F0 yaw adjuster - DO AT NEXT VENT AFTER PARTS ARE AVAILABLE.
SR3
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
SRM
- Install Enomoto-kun's beam target plate (if/when available).