= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
To-Do List 2017-03-13 [[../ToDoOldBS|Archived BS To-Do Items]]
Line 5: Line 5:
== Facilities ==
 * Vacuum and roll floor (All)
 * Wipe ladders (All)
 * Tidy tools, parts (All)
 * Find missing light lent to Kokeyama-san (Mark)
 * Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count pillars with bare concrete bases.
[[../ToDoSR|SR To-Do Items]]
Line 13: Line 7:
== Electronics == [[#EveryWeek |Every Week]]
Line 15: Line 9:
 * Wire up BF roll/pitch picos (Enzo)
 * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
 * Grab remaining cables etc per E1605111 and update document (Enzo)
 * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
 * Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
 * Debug excess noise on TM-H3 OSEM (Enzo, Mark)
[[#ComingWeeks |Coming Weeks]]

<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
 * Get stuff from [[../WishList]]

<<Anchor(ComingWeeks)>>
== 2017-09-04 ==

=== Main Assembly Sequence ===
 * --(Crane out SF.)--
 * --(Raise BF cap and retrieve lost hex cable clamp PEEK piece.)--
 * --(Crane in SF.)--
 * --(Install SF-BF rod with hex cable clamp.)--
 * --(Route cables via hex cable clamp up to below SF.)--
 * --(Adjust BF ballast mass for total weight and pitch/roll.)--
 * --(Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.)--
 * --(Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).)--
 * --(Calibrate SF LVDT.)--
 * --(Install SF main ballast mass.)--
 * --(Cable and test SF fishing rod stepper.)--
 * --(Add SF cap.)--
 * Lift and weigh SF/... section.
 

=== In parallel, time permitting ===
 * --(Rearrange arc weights on PI to allow installation of magic wand.)--
 * --(Install magic wand on PI.)--
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * --(Rearrange magnets on SF damper magnet ring for full three Cu segments.)--
 * --(Find Ni-plated rods for SF damper magnet ring and do fit check.)--
 * --(Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.)--
 * Wipe LLB damper parts with ethanol.
 * --(Get Cu O-rings for feedthroughs.)--
 * Figure out how to tighten PI yaw return spring.
 * --(Recalibrate remachined LBB springs and choose best three.)--

== Dates ==
 * Repaired LBB half ring is returned: 9/11 (Mon, lunchtime)
 * BUMAX countersunk screws for LBB Cu
 * SDC screws for LBB half rings: 9/15 (Fri)
 * LBB Cu segments: 9/19-20

<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 24: Line 85:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (???)

== Hanging BF/IRM/IM/RM/BS ==
 * Correct orientation of SF cap (Mark, Fabian, Perry)
 * Correct orientation of SF (Mark, Fabian, Perry)
 * Find/attach cable clamps for SF (Fabian)

== Real-time and SUMCON models ==
 * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-04

Main Assembly Sequence

  • Crane out SF.

  • Raise BF cap and retrieve lost hex cable clamp PEEK piece.

  • Crane in SF.

  • Install SF-BF rod with hex cable clamp.

  • Route cables via hex cable clamp up to below SF.

  • Adjust BF ballast mass for total weight and pitch/roll.

  • Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.

  • Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

  • Calibrate SF LVDT.

  • Install SF main ballast mass.

  • Cable and test SF fishing rod stepper.

  • Add SF cap.

  • Lift and weigh SF/... section.

In parallel, time permitting

  • Rearrange arc weights on PI to allow installation of magic wand.

  • Install magic wand on PI.

  • Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
  • Rearrange magnets on SF damper magnet ring for full three Cu segments.

  • Find Ni-plated rods for SF damper magnet ring and do fit check.

  • Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.

  • Wipe LLB damper parts with ethanol.
  • Get Cu O-rings for feedthroughs.

  • Figure out how to tighten PI yaw return spring.
  • Recalibrate remachined LBB springs and choose best three.

Dates

  • Repaired LBB half ring is returned: 9/11 (Mon, lunchtime)
  • BUMAX countersunk screws for LBB Cu
  • SDC screws for LBB half rings: 9/15 (Fri)
  • LBB Cu segments: 9/19-20

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.

  • Improve ADC Monitor MEDM screen.