Line 3: Line 3:
To-Do List 2017-03-13 ../ToDoOld
Line 5: Line 5:
== Facilities ==
 * Vacuum and roll floor (All)
 * Wipe ladders (All)
 * Tidy tools, parts (All)
 * Find missing light lent to Kokeyama-san (Mark)
 * Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count pillars with bare concrete bases.
== Every Week ==
=== Facilities (mostly full team) ===
 * Clean up after floor work.
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
Line 13: Line 12:
== Electronics == == 2017-04-03 ==
Line 15: Line 14:
 * Wire up BF roll/pitch picos (Enzo)
 * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
 * Grab remaining cables etc per E1605111 and update document (Enzo)
 * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
=== SF/BF/... ===
 * Trim BF to correct pitch/roll.
 * Install temporary ballast mass in SF.
 * Lift SF/BF/... and check SF pitch/roll balance and overall weight.

=== Continue PI Prep ===
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Enlarge ring of crane adapter.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Set up LBB blade tensioning jig.
 * Install LLB blades.
 * Install LLB blade units in PI.

=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ===
 * Test SF LVDT.
 * Test SF fishing rod stepper.
 * Debug TM-H4.

=== Electronics (mostly Enzo, Mark) ===
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Update E1503600 with DIO card for HPCDs, etc, etc.
Line 20: Line 38:
 * Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
 * Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
 * Debug excess noise on TM-H3 OSEM (Enzo, Mark)
 * Send list of required in-vacuum cables to Takahashi-san
Line 26: Line 42:
== PI Prep ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (???)

== Hanging BF/IRM/IM/RM/BS ==
 * Correct orientation of SF cap (Mark, Fabian, Perry)
 * Correct orientation of SF (Mark, Fabian, Perry)
 * Find/attach cable clamps for SF (Fabian)

== Real-time and SUMCON models ==
 * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

VIS Type B Near Term To-Do List

../ToDoOld

Every Week

Facilities (mostly full team)

  • Clean up after floor work.
  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

2017-04-03

SF/BF/...

  • Trim BF to correct pitch/roll.
  • Install temporary ballast mass in SF.
  • Lift SF/BF/... and check SF pitch/roll balance and overall weight.

Continue PI Prep

  • Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
  • Install fishing rod.
  • Enlarge ring of crane adapter.
  • Find table, weights, etc for use with LBB blade bending jigs.
  • Set up LBB blade tensioning jig.
  • Install LLB blades.
  • Install LLB blade units in PI.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Test SF LVDT.
  • Test SF fishing rod stepper.
  • Debug TM-H4.

Electronics (mostly Enzo, Mark)

  • Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

Real-time and SUMCON models (mostly Perry, Mark)

  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)