1718
Comment:
|
1577
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
To-Do List 2017-03-13 | ../ToDoOld |
Line 5: | Line 5: |
== Facilities == * Vacuum and roll floor (All) * Wipe ladders (All) * Tidy tools, parts (All) * Find missing light lent to Kokeyama-san (Mark) * Mark/photograph/count peeling patches on the floor. * Mark/photograph/count pillars with bare concrete bases. |
== Every Week == === Facilities (mostly full team) === * Clean up after floor work. * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. |
Line 13: | Line 12: |
== Electronics == | == 2017-04-03 == |
Line 15: | Line 14: |
* Wire up BF roll/pitch picos (Enzo) * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark) * Grab remaining cables etc per E1605111 and update document (Enzo) * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo) |
=== SF/BF/... === * Trim BF to correct pitch/roll. * Install temporary ballast mass in SF. * Lift SF/BF/... and check SF pitch/roll balance and overall weight. === Continue PI Prep === * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender. * Install fishing rod. * Enlarge ring of crane adapter. * Find table, weights, etc for use with LBB blade bending jigs. * Set up LBB blade tensioning jig. * Install LLB blades. * Install LLB blade units in PI. === Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) === * Test SF LVDT. * Test SF fishing rod stepper. * Debug TM-H4. === Electronics (mostly Enzo, Mark) === * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Work with Miyo-kun to get pico drivers added to BS rack and screens * Update E1503600 with DIO card for HPCDs, etc, etc. |
Line 20: | Line 38: |
* Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark) * Debug 900 Hz noise on BF LVDT output (Enzo, Mark) * Debug excess noise on TM-H3 OSEM (Enzo, Mark) |
* Send list of required in-vacuum cables to Takahashi-san |
Line 26: | Line 42: |
== PI Prep == * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark) * Identify missing PI parts (Hirata, Mark) * Find and reattach repaired LVDT coil(s) (???) == Hanging BF/IRM/IM/RM/BS == * Correct orientation of SF cap (Mark, Fabian, Perry) * Correct orientation of SF (Mark, Fabian, Perry) * Find/attach cable clamps for SF (Fabian) == Real-time and SUMCON models == * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?) * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?) * Compare measured TFs to cut-down model * Create a proper DAC Monitor MEDM screen * Improve ADC Monitor MEDM screen |
== Real-time and SUMCON models (mostly Perry, Mark) == * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
VIS Type B Near Term To-Do List
Every Week
Facilities (mostly full team)
- Clean up after floor work.
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
2017-04-03
SF/BF/...
- Trim BF to correct pitch/roll.
- Install temporary ballast mass in SF.
- Lift SF/BF/... and check SF pitch/roll balance and overall weight.
Continue PI Prep
- Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
- Install fishing rod.
- Enlarge ring of crane adapter.
- Find table, weights, etc for use with LBB blade bending jigs.
- Set up LBB blade tensioning jig.
- Install LLB blades.
- Install LLB blade units in PI.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Test SF LVDT.
- Test SF fishing rod stepper.
- Debug TM-H4.
Electronics (mostly Enzo, Mark)
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
Real-time and SUMCON models (mostly Perry, Mark)
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.