Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2017-03-12 19:19:05
Size: 1718
Editor: MarkBarton
Comment:
Revision 8 as of 2017-03-16 13:38:53
Size: 2332
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
To-Do List 2017-03-13 2017-03-13
Line 5: Line 5:
== Facilities ==
 *
Vacuum and roll floor (All)
 *
Wipe ladders (All)
 *
Tidy tools, parts (All)
 *
Find missing light lent to Kokeyama-san (Mark)
 *
Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count p
illars with bare concrete bases.
== Facilities (mostly full team) ==
 * ''
Vacuum and roll floor.''
 * ''
Wipe ladders.''
 * ''
Tidy tools, parts.''
 * ''
Find missing light lent to Kokeyama-san.''
 * ''
Mark/photograph/count peeling patches on the floor.''
 * ''
Mark/photograph/count pillars with bare concrete bases.''
Line 13: Line 13:
== Electronics == == Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * ''Weigh SF.''
 * ''Crane in SF.''
 * ''Adjust orientation of SF cap.''
 * ''Adjust orientation of SF.''
 * ''Find/attach cable clamps for SF.''
 * ''Hook SF-BF rod (with hex cable clamp).''
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
 * ''Confirm weight of BF/IRM/IM/RM/BS.''
 * ''Complete final ballast mass design.''
 * ''Install new security structure stuff for BS/RM.''
 * ''Install L-brackets under SF.''
Line 15: Line 27:
 * Wire up BF roll/pitch picos (Enzo)
 * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
 * Grab remaining cables etc per E1605111 and update document (Enzo)
 * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
== Electronics (mostly Enzo, Mark) ==
 * ''Add retaining screws to cables at feedthroughs.''
* Wire up BF roll/pitch picos
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Grab remaining cables etc per E1605111 and update document
 * Run cables from third and fourth feedthroughs to rack

 * Update E1503600 with DIO card for HPCDs, etc, etc.
Line 20: Line 35:
 * Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
 * Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
 * Debug excess noise on TM-H3 OSEM (Enzo, Mark)
 * Send list of required in-vacuum cables to Takahashi-san
 * ''Debug 900 Hz noise on BF LVDT output.''
 * ''Debug excess noise on TM-H3 OSEM.''
Line 26: Line 41:
== PI Prep == == PI Prep (mostly Hirata-san, Mark) ==
Line 29: Line 44:
 * Find and reattach repaired LVDT coil(s) (???)  * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
 * Check length/gender of connectors against E1503600 (Enzo)
Line 31: Line 47:
== Hanging BF/IRM/IM/RM/BS ==
 * Correct orientation of SF cap (Mark, Fabian, Perry)
 * Correct orientation of SF (Mark, Fabian, Perry)
 * Find/attach cable clamps for SF (Fabian)

== Real-time and SUMCON models ==
 * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?)
== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)

VIS Type B Near Term To-Do List

2017-03-13

Facilities (mostly full team)

  • Vacuum and roll floor.

  • Wipe ladders.

  • Tidy tools, parts.

  • Find missing light lent to Kokeyama-san.

  • Mark/photograph/count peeling patches on the floor.

  • Mark/photograph/count pillars with bare concrete bases.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Weigh SF.

  • Crane in SF.

  • Adjust orientation of SF cap.

  • Adjust orientation of SF.

  • Find/attach cable clamps for SF.

  • Hook SF-BF rod (with hex cable clamp).

  • Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
  • Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
  • Confirm weight of BF/IRM/IM/RM/BS.

  • Complete final ballast mass design.

  • Install new security structure stuff for BS/RM.

  • Install L-brackets under SF.

Electronics (mostly Enzo, Mark)

  • Add retaining screws to cables at feedthroughs.

  • Wire up BF roll/pitch picos
  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Grab remaining cables etc per E1605111 and update document
  • Run cables from third and fourth feedthroughs to rack
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san
  • Debug 900 Hz noise on BF LVDT output.

  • Debug excess noise on TM-H3 OSEM.

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

PI Prep (mostly Hirata-san, Mark)

  • Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
  • Identify missing PI parts (Hirata, Mark)
  • Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
  • Check length/gender of connectors against E1503600 (Enzo)

Real-time and SUMCON models (mostly Perry, Mark)

  • Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
  • Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
  • Compare measured TFs to cut-down model
  • Create a proper DAC Monitor MEDM screen
  • Improve ADC Monitor MEDM screen

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)