Line 25: Line 25:
 * Re-secure floor panels around tank.
 * Wipe entire frame; blow dust out of grooves.
 * Organize new OL for setting BS pitch (Fabian).
 * --(Re-secure floor panels around tank.)--
 * --(Wipe entire frame; blow dust out of grooves.)--
 * --(Organize new OL for setting BS pitch (Fabian).)--
Line 30: Line 30:
 * Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).  * --(Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).)--
Line 35: Line 35:
 * Remove dummy BS from RM.
 * Install coil-only OSEMs.
 * Measure coil resistances of wide-mouth OSEMs, new coil-only OSEMS (for Michimura-san).
 * Look up log book to find serial numbers of old coil+sensor RM OSEMs.
  * 2016-09-07: H1 = #22, H2 = #23, H3 = #25, H4 = #26
 * Pack RM coil+sensor OSEMs, label them with original serial numbers, and return them to Akutsu-san.
 * --(Remove dummy BS from RM.)--
 * --(Install coil-only OSEMs.)--
 * --(Measure coil resistances of wide-mouth OSEMs, new coil-only OSEMS (for Michimura-san).)--
 * --(Look up log book to find serial numbers of old coil+sensor RM OSEMs.)--
  * --(2016-09-07: H1 = #22, H2 = #23, H3 = #25, H4 = #26)--
 * --(Pack RM coil+sensor OSEMs, label them with original serial numbers, and return them to Akutsu-san.)--
Line 42: Line 42:
 * Reassemble top of AF.
 *
Check verticality of AF, height of crossbars, centering of optical table.
 *
Move NB-03 jacks at PI level of AF to top level.
 *
Set height, level of IM support screws.
 *
Install IM.
 * --(Reassemble top of AF.)--
 * --(
Check verticality of AF, height of crossbars, centering of optical table.)--
 * --(
Move NB-03 jacks at PI level of AF to top level.)--
 * --(
Set height, level of IM support screws.)--
 * --(
Install IM.)--
Line 72: Line 72:
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.

VIS Type B Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for Real BS Hang

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-07-31

Facilities

  • Re-secure floor panels around tank.

  • Wipe entire frame; blow dust out of grooves.

  • Organize new OL for setting BS pitch (Fabian).

Design/Documentation/Planning

  • Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).

Electronics

Main Assembly

  • Remove dummy BS from RM.

  • Install coil-only OSEMs.

  • Measure coil resistances of wide-mouth OSEMs, new coil-only OSEMS (for Michimura-san).

  • Look up log book to find serial numbers of old coil+sensor RM OSEMs.

    • 2016-09-07: H1 = #22, H2 = #23, H3 = #25, H4 = #26

  • Pack RM coil+sensor OSEMs, label them with original serial numbers, and return them to Akutsu-san.

  • Remove IM end panel and check centering of IM picos.
  • Reassemble top of AF.

  • Check verticality of AF, height of crossbars, centering of optical table.

  • Move NB-03 jacks at PI level of AF to top level.

  • Set height, level of IM support screws.

  • Install IM.

Time permitting

  • Remove LBB rings.
  • Send rings for recleaning.

Real BS Hang Tasks

Major Tasks

  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • LBB ballast mass.
    • Research real payload.
    • Do improved mass budget.
  • Get pico drive screens fixed (Miyo-kun)
  • Final ballast mass production for BF and SF (Hirata-san). (have quotes)
  • Design of receptacles for rods with 8 mm heads.
  • Possible rebuild of BF and/or SF
    • Set up build/test stand for filters.
    • Get filter test weights.
    • Find spare BF blade(s).
  • Reclean stuff:
    • PI (remove Kapton tape etc, etc).
    • LLB damper stuff, especially Cu segments.
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Swap out temporary ballast mass in BF, SF.
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
    • Wide-mouth OSEMs from RM to Akutsu-san
  • Adjust height of crossbars below BF.
  • If possible, fix galled pole in BF level of EQ stop.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
  • Check inside SF for lost ruler.
  • Tighten PI yaw return spring.
  • Get Cu O-rings for feedthroughs.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark).
  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

SR Prep Tasks

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Design final SF ballast masses (Fabian).

Electronics

  • Get cables/cards for SR3:
    • 5 DSub-37 cables (tent)
    • 5 DSub-15M to DSub-9M adapter cables (tent)
    • 3 DIO cards (tent)
    • 2 DSub-9 FF gender benders (for LVDTs)
    • extra ADC card(s)?
    • extra DAC card(s)?
    • BNC-LEMO adapter (for LVDTs)