Line 1: Line 1:
= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
[[../ToDoOld|Archived To-Do Items]] [[../ToDoOldBS|Archived BS To-Do Items]]

[[../ToDoSR|SR To-Do Items]]
Line 8: Line 10:

[[#RealBSHang|Preparation for Real BS Hang]]

[[#SRPrepTasks|Preparation for SR Installation]]
Line 23: Line 21:
== 2017-07-31 ==
=== Facilities ===
 * --(Re-secure floor panels around tank.)--
 * --(Wipe entire frame; blow dust out of grooves.)--
 * --(Organize new OL for setting BS pitch (Fabian).)--
Line 29: Line 22:
=== Design/Documentation/Planning ===
 * --(Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).)--
  
=== Electronics ===
== 2017-10-10 ==
Line 34: Line 24:
=== Main Assembly ===
 * --(Remove dummy BS from RM.)--
 * --(Install coil-only OSEMs.)--
 * --(Measure coil resistances of wide-mouth OSEMs, new coil-only OSEMS (for Michimura-san).)--
 * --(Look up log book to find serial numbers of old coil+sensor RM OSEMs.)--
  * --(2016-09-07: H1 = #22, H2 = #23, H3 = #25, H4 = #26)--
 * --(Pack RM coil+sensor OSEMs, label them with original serial numbers, and return them to Akutsu-san.)--
 * Remove IM end panel and check centering of IM picos.
 * --(Reassemble top of AF.)--
 * --(Check verticality of AF, height of crossbars, centering of optical table.)--
 * --(Move NB-03 jacks at PI level of AF to top level.)--
 * --(Set height, level of IM support screws.)--
 * --(Install IM.)--
=== Main Assembly Sequence ===
 * --(Account for second bubble level (might be on BF))--.
 * Borrow portable hard drive.
 * Clean up sticker residue and magic marker writing.
 * --(Remove LVDT modules; identify screws.)--
 * --(Check that all in-air cables are labeled)--.
 * If possible, reroute cable to eliminate need for fifth feedthrough.
 * --(Debug all electronics, especially actuation.)--
 * Measure IP period; adjust ballast mass.
 * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Set all EQ stops to TBD clearance.
 * --(Install small KOACH filters on LBB.)--
 * --(Remove First Contact.)--
 * --(Cable optical lever (Simon, Enzo))--
 * --(Align optical lever (Simon))--
 * Get ready for full TFs.
Line 48: Line 42:
=== Time permitting ===
 * Remove LBB rings.
 * Send rings for recleaning.
=== Etc ===
 * Move stuff out of PR2 area.
 * Tidy/label parts.
 * Move safety bars from BS AF area to SR2 area.
 * (Put up safety bars in SR3 area.)
 * Close hole in floor above BS AF area.

=== Software ===
 * --(Enter new IP matrices and do safe.snap.)--
 * Send stepper driver info to Miyo-kun.
 * Update real-time model to number channels from #0.
 * Remove old OL stuff; add link to new OL stuff.
 * Remove unused screens.
 * Sort out SVN.
 * --(Add support for comments to SUMCON.)--
 * Create SUMCON model with values commented.
 * Derive matrices for IP FRs.

=== Design ===
 * Finalize redesign of IP yaw adjuster.
 * Design better F0 FR adjuster.
Line 53: Line 65:
== Real BS Hang Tasks == == Tasks Not To Forget ==
Line 55: Line 67:
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
Line 56: Line 69:
 * LBB ballast mass.
  * Research real payload.
  * Do improved mass budget.
 * Get pico drive screens fixed (Miyo-kun)
 * Final ballast mass production for BF and SF (Hirata-san). (have quotes)
 * Design of receptacles for rods with 8 mm heads.
 * Possible rebuild of BF and/or SF
  * Set up build/test stand for filters.
  * Get filter test weights.
  * Find spare BF blade(s).
 * Reclean stuff:
  * PI (remove Kapton tape etc, etc).
  * LLB damper stuff, especially Cu segments.
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Figure out how to make PI yaw adjustment reliable.
Line 75: Line 73:
 * Get clean bag laundered.
Line 77: Line 74:
 * Swap out temporary ballast mass in BF, SF.
Line 79: Line 75:
  * Lock washers for LBB dampers
Line 81: Line 76:
  * Wide-mouth OSEMs from RM to Akutsu-san
 * Adjust height of crossbars below BF.
 * If possible, fix galled pole in BF level of EQ stop.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
 * Check inside SF for lost ruler.
 * Tighten PI yaw return spring.
 * Get Cu O-rings for feedthroughs.
Line 90: Line 78:
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark).
 * Remove cling wrap in BF and install vacuum-compatible heat shrink.
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
Line 105: Line 87:
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks ==
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Design final SF ballast masses (Fabian).

=== Electronics ===
 * Get cables/cards for SR3:
  * 5 DSub-37 cables (tent)
  * 5 DSub-15M to DSub-9M adapter cables (tent)
  * 3 DIO cards (tent)
  * 2 DSub-9 FF gender benders (for LVDTs)
  * extra ADC card(s)?
  * extra DAC card(s)?
  * BNC-LEMO adapter (for LVDTs)
  * etc

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-10

Main Assembly Sequence

  • Account for second bubble level (might be on BF).

  • Borrow portable hard drive.
  • Clean up sticker residue and magic marker writing.
  • Remove LVDT modules; identify screws.

  • Check that all in-air cables are labeled.

  • If possible, reroute cable to eliminate need for fifth feedthrough.
  • Debug all electronics, especially actuation.

  • Measure IP period; adjust ballast mass.
  • Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to TBD clearance.
  • Install small KOACH filters on LBB.

  • Remove First Contact.

  • Cable optical lever (Simon, Enzo)

  • Align optical lever (Simon)

  • Get ready for full TFs.

Etc

  • Move stuff out of PR2 area.
  • Tidy/label parts.
  • Move safety bars from BS AF area to SR2 area.
  • (Put up safety bars in SR3 area.)
  • Close hole in floor above BS AF area.

Software

  • Enter new IP matrices and do safe.snap.

  • Send stepper driver info to Miyo-kun.
  • Update real-time model to number channels from #0.
  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.
  • Sort out SVN.
  • Add support for comments to SUMCON.

  • Create SUMCON model with values commented.
  • Derive matrices for IP FRs.

Design

  • Finalize redesign of IP yaw adjuster.
  • Design better F0 FR adjuster.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)