Differences between revisions 108 and 111 (spanning 3 versions)
Revision 108 as of 2017-08-18 11:08:41
Size: 4228
Editor: MarkBarton
Comment:
Revision 111 as of 2017-08-21 09:17:31
Size: 5966
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
== 2017-08-16 ==
=== Facilities ===
 * --(Move cardboard box with old BF to storage.)--
 * --(Tidy up Hirata-san's stuff in genkan of cleanbooth.)--
== 2017-08-21 ==
Line 29: Line 25:
 * LBB ballast mass.
  * Research real payload.
  * Do improved mass budget.
Line 34: Line 27:
=== Electronics ===
 * --(Return spare two Type5-2.2 cables to Sato-san's store.)--
 * Recable/test BF LVDT.
 * --(Rip out remaining old in-air cabling.)--
 * Lay new in-air cabling.
 * Reinstall LVDT chassis.
Line 42: Line 28:
 * Do final trim of IM/RM/TM.
 * Remove LBB blade assemblies from PI.
 * Remove LBB blades from holders.
 * Remove LBB rings.
 * Send rings for recleaning.
 * Wrap new IM bottom ballast masses (Mozumi).
 * Install new IM masses.
 * Set up optical level.
 * Adjust IM ballast mass to give desired roll/pitch/vertical.
 * Level BF.
 * Cable BF LVDT, test and calibrate.
 * Adjust top of IRM to level.
 * Install IRM side panels.
 * Install IRM OSEMs.
 * Cable IRM OSEMs and test.
 * Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.
 * Add extra ballast mass to BF.
 * Add BF cap but don't anchor cables.
 * Cable and test BF cap picos.
 * Lift BF/IRM/IM/RM/BS and weigh.
 * Adjust BF ballast if necessary.
 * Crane in SF.
 * Hook up BF/IRM/IM/RM/BS.
 * Route cables up to SF.
 * Adjust BF ballast if necessary.
Line 49: Line 50:
  * Lay more new in-air cabling.
Line 110: Line 112:
==== Order now ====
 * Bread boards for SR -> すぐ見積り依頼
 * Include installation work in the contract
 * Total budget = 5MJPY
 * PEEK collet for "Small hexagon"(cable clamp) -> すぐ見積り依頼

==== Need simple design changes ====
 * SUS wires(3 types) for the LBB
  * Change the length -> すぐ見積り依頼
 * Receptacles for Bread board damper
  * There is a mistake in the PROMEC drawing.
  * Hirata-san will make a new 2D drawing
 * IM wire clamps for SR
  * Need to change the height
 * SR assembly frame -> 月曜日に見積り依頼
  * Mark is checking the design from Fabian
  * We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

==== Need Fabian's input ====
 * Cable clamps for BF,SF and PI -> 方式を決める
  * Design change for the PI clamps, because the SR PIs are NIKHEF ones.
 * Ballast masses for BF and SF
 * 製作に2週間程度
 * 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
  * 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

==== Need more discussion/checks ====
 * Blade spring assembly for LBB
  * Check the load of the LBB and decide the design load of the springs
  * Correct the length
  * Scale the width of the current blades to design the new blades -> 高橋さんと相談
   * SR用LBBの重さを確認
 * Bread board damper rings
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> 至急確認

VIS Type B Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for Real BS Hang

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-08-21

Design/Documentation/Planning

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.

Main Assembly

  • Wrap new IM bottom ballast masses (Mozumi).
  • Install new IM masses.
  • Set up optical level.
  • Adjust IM ballast mass to give desired roll/pitch/vertical.
  • Level BF.
  • Cable BF LVDT, test and calibrate.
  • Adjust top of IRM to level.
  • Install IRM side panels.
  • Install IRM OSEMs.
  • Cable IRM OSEMs and test.
  • Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.
  • Add extra ballast mass to BF.
  • Add BF cap but don't anchor cables.
  • Cable and test BF cap picos.
  • Lift BF/IRM/IM/RM/BS and weigh.
  • Adjust BF ballast if necessary.
  • Crane in SF.
  • Hook up BF/IRM/IM/RM/BS.
  • Route cables up to SF.
  • Adjust BF ballast if necessary.

Time permitting

  • Lay more new in-air cabling.

Real BS Hang Tasks

Major Tasks

  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Final ballast mass production for BF and SF (Hirata-san). (have quotes)
  • Design of receptacles for rods with 8 mm heads.
  • Possible rebuild of BF and/or SF
    • Set up build/test stand for filters.
    • Get filter test weights.
    • Find spare BF blade(s).
  • Reclean stuff:
    • PI (remove Kapton tape etc, etc).
    • LLB damper stuff, especially Cu segments.
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Swap out temporary ballast mass in BF, SF.

  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
    • Wide-mouth OSEMs from RM to Akutsu-san
  • Adjust height of crossbars below BF.

  • If possible, fix galled pole in BF level of EQ stop.

  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
  • Check inside SF for lost ruler.

  • Tighten PI yaw return spring.
  • Get Cu O-rings for feedthroughs.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark).
  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

SR Prep Tasks

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Design final SF ballast masses (Fabian).

Order now

  • Bread boards for SR -> すぐ見積り依頼

  • Include installation work in the contract
  • Total budget = 5MJPY
  • PEEK collet for "Small hexagon"(cable clamp) -> すぐ見積り依頼

Need simple design changes

  • SUS wires(3 types) for the LBB
    • Change the length -> すぐ見積り依頼

  • Receptacles for Bread board damper
    • There is a mistake in the PROMEC drawing.
    • Hirata-san will make a new 2D drawing
  • IM wire clamps for SR
    • Need to change the height
  • SR assembly frame -> 月曜日に見積り依頼

    • Mark is checking the design from Fabian
    • We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

Need Fabian's input

  • Cable clamps for BF,SF and PI -> 方式を決める

    • Design change for the PI clamps, because the SR PIs are NIKHEF ones.
  • Ballast masses for BF and SF
  • 製作に2週間程度
  • 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
    • 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

Need more discussion/checks

  • Blade spring assembly for LBB
    • Check the load of the LBB and decide the design load of the springs
    • Correct the length
    • Scale the width of the current blades to design the new blades -> 高橋さんと相談

      • SR用LBBの重さを確認
  • Bread board damper rings
    • Need to check whether we can put a full ring into the chamber from the side flanges or not. -> 至急確認

Electronics

  • Get cables/cards for SR3:
    • 5 DSub-37 cables (tent)
    • 5 DSub-15M to DSub-9M adapter cables (tent)
    • 3 DIO cards (tent)
    • 2 DSub-9 FF gender benders (for LVDTs)
    • extra ADC card(s)?
    • extra DAC card(s)?
    • BNC-LEMO adapter (for LVDTs)
    • etc

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)