= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
[[../ToDoOld|Archived To-Do Items]] [[../ToDoOldBS|Archived BS To-Do Items]]

[[../ToDoSR|SR To-Do Items]]
Line 8: Line 10:

[[#RealBSHang|Preparation for Real BS Hang]]

[[#SRPrepTasks|Preparation for SR Installation]]
Line 23: Line 21:
== 2017-08-21 ==
=== Design/Documentation/Planning ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
Line 27: Line 22:
=== Main Assembly ===
 * --(Wrap new IM bottom ballast masses (Mozumi).)--
 * --(Install new IM masses.)--
 * --(Set up optical level.)--
 * --(Adjust IM ballast mass to give desired roll/pitch/vertical.)--
 * --(Level BF.)--
 * --(Cable BF LVDT, test and calibrate.)--
 * --(Adjust top of IRM to level.)--
 * --(Install IRM side panels.)--
 * --(Install IRM OSEMs.)--
 * --(Cable IRM OSEMs)-- and test.
 * --(Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.)--
 * Add extra ballast mass to BF.
 * Add BF cap but don't anchor cables.
 * Cable and test BF cap picos.
 * Lift BF/IRM/IM/RM/BS and weigh.
 * Adjust BF ballast if necessary.
 * Crane in SF.
 * Hook up BF/IRM/IM/RM/BS.
 * Route cables up to SF.
 * Adjust BF ballast if necessary.
== 2017-09-19 ==
(No work Monday 9/18)
=== Main Assembly Sequence ===
 * --(Debug BF LVDT actuation)--.
Line 49: Line 27:
=== Time permitting ===
  * Lay more new in-air cabling.
---- /!\ '''Edit conflict - other version:''' ----
 * --(Check F0 yoke height (top of coil former should be 37.5 mm above bottom of recess in top of baseplate))-- 36mm.
 * Test all PI items:
  * Yaw stepper (tested, not clearly working).
  * --(F0 LVDT sensing)--
  * --(F0 LVDT actuation)--
  * Calibrate F0 LVDT.
  * Horizontal LVDT sensing
  * Horizontal LVDT actuation
  * --(Geophones (issues with driver, cables, descramblers))--
 * --(Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS)-- 2 Measurements: f1=0.443 Hz, f2=0.454 Hz.
 * --(Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS)-- 2 Measurements: f1=0.208 Hz, f2=0.210 Hz.
 * --(Double check BS pitch with OL.)--
 * --(Adjust SF damper ring to correct gap.)--
 * --(Install lock nuts on F0 GAS FR at TBD positions.)--
 * Lock BF and F0 keystones (but ''not'' SF keystone).
 * Lock RM to BS and IRM to IM.
 * Lock RM, IRM and BF (but not SF) to security structure.
 * Lock IP.
 * Remove F0 keystone top plate (including yaw stepper) and immobilize SF/... in yaw.
 * Attach lifting fixture.


 * Remove BF- and SF-level crossbars.
 * Remove geophones for craning.
 * Disconnect in-vacuum cables from feedthrough and coil neatly for craning.
 * --(Attach lifting plates.)--
=== Tank Preparation Sequence ===
 * Attach Cu segments to LBB damper ring.
 * Pass halves of LBB magnet ring into tank, join, and make sandwich for craning.
 * Crane tank lid off.
 * Crane LBB damper rings to top of tank and suspend.
 * Crane suspension out of assembly frame.
 * Attach LBB upper rods to LBB blade tips and rotate suspension 45° clockwise.
 * Crane suspension into tank and connect upper rods to LBB Cu ring.
 * Unclamp LBB ring "sandwich" so LBB Cu ring is suspended on upper rods.
 * Install LBB lower rods and hook LBB.
 * Measure required ballast for LBB.
 * Unlock suspension and readjust.
 * Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).

=== In parallel, time permitting ===
 * --(Fix issue with geophone distributor.)--
 * Fix #1 geophone adapter cable (and replace borrowed one).
 * Fix broken pico adapter cable.
 * Figure out how to tighten PI yaw return spring or otherwise make yaw adjustment reliable.
Line 53: Line 75:
== Real BS Hang Tasks == == Tasks Not To Forget ==
Line 55: Line 77:
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
Line 57: Line 80:
 * Final ballast mass production for BF and SF (Hirata-san). (have quotes)
 * Design of receptacles for rods with 8 mm heads.
 * Possible rebuild of BF and/or SF
  * Set up build/test stand for filters.
  * Get filter test weights.
  * Find spare BF blade(s).
 * Reclean stuff:
  * PI (remove Kapton tape etc, etc).
  * LLB damper stuff, especially Cu segments.
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
Line 74: Line 85:
 * --(Swap out temporary ballast mass in BF)--, SF.
Line 78: Line 88:
  * Wide-mouth OSEMs from RM to Akutsu-san
 * --(Adjust height of crossbars below BF.)--
 * --(If possible, fix galled pole in BF level of EQ stop.)--
Line 82: Line 89:
 * --(Check inside SF for lost ruler.)--
 * Tighten PI yaw return spring.
 * Get Cu O-rings for feedthroughs.
Line 88: Line 92:
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * --(Remove cling wrap in BF and install vacuum-compatible heat shrink.)--
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Adjust yoke on BF to put top of secondary at 3.5 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
Line 104: Line 103:
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks ==
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Design final SF ballast masses (Fabian).
==== Order now ====
 * Bread boards for SR -> すぐ見積り依頼
 * Include installation work in the contract
 * Total budget = 5MJPY
 * PEEK collet for "Small hexagon"(cable clamp) -> すぐ見積り依頼

==== Need simple design changes ====
 * SUS wires(3 types) for the LBB
  * Change the length -> すぐ見積り依頼
 * Receptacles for Bread board damper
  * There is a mistake in the PROMEC drawing.
  * Hirata-san will make a new 2D drawing
 * IM wire clamps for SR
  * Need to change the height
 * SR assembly frame -> 月曜日に見積り依頼
  * Mark is checking the design from Fabian
  * We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

==== Need Fabian's input ====
 * Cable clamps for BF,SF and PI -> 方式を決める
  * Design change for the PI clamps, because the SR PIs are NIKHEF ones.
 * Ballast masses for BF and SF
 * 製作に2週間程度
 * 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
  * 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

==== Need more discussion/checks ====
 * Blade spring assembly for LBB
  * Check the load of the LBB and decide the design load of the springs
  * Correct the length
  * Scale the width of the current blades to design the new blades -> 高橋さんと相談
   * SR用LBBの重さを確認
 * Bread board damper rings
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> 至急確認



=== Electronics ===
 * Get cables/cards for SR3:
  * 5 DSub-37 cables (tent)
  * 5 DSub-15M to DSub-9M adapter cables (tent)
  * 3 DIO cards (tent)
  * 2 DSub-9 FF gender benders (for LVDTs)
  * extra ADC card(s)?
  * extra DAC card(s)?
  * BNC-LEMO adapter (for LVDTs)
  * etc

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-19

(No work Monday 9/18)

Main Assembly Sequence

  • Debug BF LVDT actuation.


/!\ Edit conflict - other version:


  • Check F0 yoke height (top of coil former should be 37.5 mm above bottom of recess in top of baseplate) 36mm.

  • Test all PI items:
    • Yaw stepper (tested, not clearly working).
    • F0 LVDT sensing

    • F0 LVDT actuation

    • Calibrate F0 LVDT.
    • Horizontal LVDT sensing
    • Horizontal LVDT actuation
    • Geophones (issues with driver, cables, descramblers)

  • Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS 2 Measurements: f1=0.443 Hz, f2=0.454 Hz.

  • Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS 2 Measurements: f1=0.208 Hz, f2=0.210 Hz.

  • Double check BS pitch with OL.

  • Adjust SF damper ring to correct gap.

  • Install lock nuts on F0 GAS FR at TBD positions.

  • Lock BF and F0 keystones (but not SF keystone).

  • Lock RM to BS and IRM to IM.
  • Lock RM, IRM and BF (but not SF) to security structure.
  • Lock IP.
  • Remove F0 keystone top plate (including yaw stepper) and immobilize SF/... in yaw.
  • Attach lifting fixture.
  • Remove BF- and SF-level crossbars.
  • Remove geophones for craning.
  • Disconnect in-vacuum cables from feedthrough and coil neatly for craning.
  • Attach lifting plates.

Tank Preparation Sequence

  • Attach Cu segments to LBB damper ring.
  • Pass halves of LBB magnet ring into tank, join, and make sandwich for craning.
  • Crane tank lid off.
  • Crane LBB damper rings to top of tank and suspend.
  • Crane suspension out of assembly frame.
  • Attach LBB upper rods to LBB blade tips and rotate suspension 45° clockwise.
  • Crane suspension into tank and connect upper rods to LBB Cu ring.
  • Unclamp LBB ring "sandwich" so LBB Cu ring is suspended on upper rods.
  • Install LBB lower rods and hook LBB.
  • Measure required ballast for LBB.
  • Unlock suspension and readjust.
  • Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).

In parallel, time permitting

  • Fix issue with geophone distributor.

  • Fix #1 geophone adapter cable (and replace borrowed one).
  • Fix broken pico adapter cable.
  • Figure out how to tighten PI yaw return spring or otherwise make yaw adjustment reliable.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)