= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
2017-04-03 | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Facilities (mostly full team) == * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) == * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary. == Electronics (mostly Enzo, Mark) == * Make more anti-feedthrough adapters. * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Run final 10-m section of cables from third and fourth feedthroughs to rack. * Wire up BF roll/pitch picos * Wire up SF LVDT. * Wire up SF fishing rod stepper. * Work with Miyo-kun to get pico drivers added to BS rack and screens * Grab remaining cables etc per E1605111 and update document * Update E1503600 with DIO card for HPCDs, etc, etc. * Decide final length for BS OSEM cables (Enzo, Mark, Fabian) * Send list of required in-vacuum cables to Takahashi-san * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata) == PI Prep (mostly Hirata-san, Mark) == * Prepare PI for moving. * Remove accelerometers. * Remove large weights. * Remove arc weights. * Attach lifting plates. * Wrap with clingwrap, cover with spare cleanbag. * Clear path to remove PI with forklift. * Move worktables. * Move portable cleanroom. * Shutdown rack and move electrical cables. * Prepare second floor for receiving PI. * Clean and clingwrap pallet. * Double-check dimensions. * Disconnect fan cables, curtain. * Crane PI into clean booth. * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark) * Find and install fishing rod. * Remove and pack away the accelerometers. * Find table, weights, etc for use with LBB blade bending jigs. * Install LLB blades. * Install LLB modules. * Check length/gender of connectors against E1503600 (Enzo) * Clean up after floor work. == Real-time and SUMCON models (mostly Perry, Mark) == * Get Perry (and Enzo) set up with SUMCON. * Update SUMCON model of full BS. * Do cut-down SUMCON model of just payload hanging from fixed BS. * Compare measured TFs to cut-down model(s). * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |