Line 3: Line 3:
2017-04-03 [[../ToDoOld|Archived To-Do Items]]
Line 5: Line 5:
== Facilities (mostly full team) == [[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

[[#RealBSHang|Preparation for Real BS Hang]]

[[#SRPrepTasks|Preparation for SR Installation]]

<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
Line 9: Line 20:
 * Get stuff from [[../WishList]]
Line 10: Line 22:
== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
<<Anchor(ComingWeeks)>>
== Coming Weeks (2017-06-19, 2017-06-26) ==
=== Facilities ===
 * --(Remove cling wrap from stuff.)--
 * --(Plug stuff back in (charging station, KOACH filters, OL etc).)--
 * --(Power up rack.)--
Line 13: Line 29:
== Electronics (mostly Enzo, Mark) ==
 * Make more anti-feedthrough adapters.
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Run final 10-m section of cables from third and fourth feedthroughs to rack.
 * Wire up BF roll/pitch picos
 * Wire up SF LVDT.
 * Wire up SF fishing rod stepper.
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Grab remaining cables etc per E1605111 and update document
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
=== Design/Documentation ===
 * Design final BF/SF ballast mass assuming BF can be made to work without rebuild (Fabian).
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Do version of 3D CAD with test-hang arrangement of suspension and LBB damper stuff (Hirata-san).
 * Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).

=== Main Assembly ===
 * --(Remove crossbars below BF and SF.)--
 * --(Set SF damper to 4 mm clearance.)--
 * --(Find wrenches for vacuum tank jacks (41 mm and possibly 75 mm).)--
 * --(Adjust jacks to nominal height.)--
 * --(Do up all EQ stops etc (except SF).)--
 * --(Remove geophones (temporarily, for craning).)--
 * --(Crane suspension into tank.)--
 * --(Hook LBB Cu ring.)--
 * --(Hook LBB.)--
 * --(Crane vacuum tank lid+ring back on.)--
 * --(Remove vacuum tank lid (only) and store on pallet.)--
 * --(Add ballast to LBB.)--
 * --(Replace geophones.)--
 * --(Unlock all but IP and check pendulum is centered in security structure. Adjust with jacks. )--
 * --(Unlock IP and adjust to center with jacks.)--
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * Adjust pitch/yaw/vertical of dummy optic.
 * Start TFs.

=== Electronics ===
 * Get pico drive screens fixed (Miyo-kun)
 * Order final OSEM cables (six of 1.7 m, two of 2.2 m, two of 2.4 m; Sato-san).
 * --(Disconnect in-vacuum and in-air cabling from feedthroughs (label in-vacuum ones).)--
 * --(Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.)--
 * --(Reconnect in-vacuum cabling.)--
 * --(Adjust in-air cabling to match 135° rotation of BS.)--
 * --(Reconnect in-air cables.)-- (all but 4)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== LSOL ===
 * Assist Simon with hardware installation of LSOL (week of 6/26?).
 * Assist Simon with modifications to realtime model for LSOL (week of 6/26?).

=== Real-time and SUMCON models ===
 * Derive and install PI LVDT matrices.
 * Check LSOL section of k1visbs model.

<<Anchor(RealBSHang)>>
== Real BS Hang Tasks ==
=== Major Tasks ===
 * Final ballast mass design/production for BF and SF (Fabian, Hirata-san).
 * Get final OSEM cables (six of 1.7 m, two of 2.2 m, two of 2.4 m; Sato-san).
 * Possible rebuild of BF and/or SF
  * Set up build/test stand for filters.
  * Get filter test weights.
  * Find spare BF blade(s).
 * Prepare real BS:
  * Coordinate with Hirose-san.
  * Book transport of mirror (Kashiwa to KAGRA)
  * Gather mirror box, gluing supplies, prisms, magnets, new flags, new flag jigs.
  * Solve problem of lack of scribe line on one side of BS (Mark, Hirata-san).
  * Organize cleanroom gear for Kashiwa trip(s).
  * Put magnets in flags.
  * Glue flags/prisms at Kashiwa.
 * Reclean stuff:
  * PI (remove Kapton tape etc, etc).
  * LLB damper stuff, especially Cu segments.
 * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
 * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Swap out temporary ballast mass in BF, SF.
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
  * Wide-mouth OSEMs from RM to Akutsu-san
 * Adjust height of crossbars below BF.
 * If possible, fix galled pole in BF level of EQ stop.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
 * Check inside SF for lost ruler.
 * Tighten PI yaw return spring.
 * Get Cu O-rings for feedthroughs.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark).
 * Remove cling wrap in BF and install vacuum-compatible heat shrink.
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 26: Line 125:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep (mostly Hirata-san, Mark) ==
 * Prepare PI for moving.
  * Remove accelerometers.
  * Remove large weights.
  * Remove arc weights.
  * Attach lifting plates.
  * Wrap with clingwrap, cover with spare cleanbag.
 * Clear path to remove PI with forklift.
  * Move worktables.
  * Move portable cleanroom.
  * Shutdown rack and move electrical cables.
 * Prepare second floor for receiving PI.
  * Clean and clingwrap pallet.
  * Double-check dimensions.
  * Disconnect fan cables, curtain.
 * Crane PI into clean booth.
 * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
 * Find and install fishing rod.
 * Remove and pack away the accelerometers.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB modules.
 * Check length/gender of connectors against E1503600 (Enzo)
 * Clean up after floor work.

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Get Perry (and Enzo) set up with SUMCON.
 * Update SUMCON model of full BS.
 * Do cut-down SUMCON model of just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
Line 60: Line 131:

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks ==
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Design final SF ballast masses (Fabian).

VIS Type B Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for Real BS Hang

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks (2017-06-19, 2017-06-26)

Facilities

  • Remove cling wrap from stuff.

  • Plug stuff back in (charging station, KOACH filters, OL etc).

  • Power up rack.

Design/Documentation

  • Design final BF/SF ballast mass assuming BF can be made to work without rebuild (Fabian).
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Do version of 3D CAD with test-hang arrangement of suspension and LBB damper stuff (Hirata-san).
  • Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).

Main Assembly

  • Remove crossbars below BF and SF.

  • Set SF damper to 4 mm clearance.

  • Find wrenches for vacuum tank jacks (41 mm and possibly 75 mm).

  • Adjust jacks to nominal height.

  • Do up all EQ stops etc (except SF).

  • Remove geophones (temporarily, for craning).

  • Crane suspension into tank.

  • Hook LBB Cu ring.

  • Hook LBB.

  • Crane vacuum tank lid+ring back on.

  • Remove vacuum tank lid (only) and store on pallet.

  • Add ballast to LBB.

  • Replace geophones.

  • Unlock all but IP and check pendulum is centered in security structure. Adjust with jacks.

  • Unlock IP and adjust to center with jacks.

  • Unlock BF keystone and try running BF fishing rod to fix sag problem.
  • Adjust pitch/yaw/vertical of dummy optic.
  • Start TFs.

Electronics

  • Get pico drive screens fixed (Miyo-kun)
  • Order final OSEM cables (six of 1.7 m, two of 2.2 m, two of 2.4 m; Sato-san).
  • Disconnect in-vacuum and in-air cabling from feedthroughs (label in-vacuum ones).

  • Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.

  • Reconnect in-vacuum cabling.

  • Adjust in-air cabling to match 135° rotation of BS.

  • Reconnect in-air cables. (all but 4)

  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

LSOL

  • Assist Simon with hardware installation of LSOL (week of 6/26?).
  • Assist Simon with modifications to realtime model for LSOL (week of 6/26?).

Real-time and SUMCON models

  • Derive and install PI LVDT matrices.
  • Check LSOL section of k1visbs model.

Real BS Hang Tasks

Major Tasks

  • Final ballast mass design/production for BF and SF (Fabian, Hirata-san).
  • Get final OSEM cables (six of 1.7 m, two of 2.2 m, two of 2.4 m; Sato-san).
  • Possible rebuild of BF and/or SF
    • Set up build/test stand for filters.
    • Get filter test weights.
    • Find spare BF blade(s).
  • Prepare real BS:
    • Coordinate with Hirose-san.
    • Book transport of mirror (Kashiwa to KAGRA)
    • Gather mirror box, gluing supplies, prisms, magnets, new flags, new flag jigs.
    • Solve problem of lack of scribe line on one side of BS (Mark, Hirata-san).
    • Organize cleanroom gear for Kashiwa trip(s).
    • Put magnets in flags.
    • Glue flags/prisms at Kashiwa.
  • Reclean stuff:
    • PI (remove Kapton tape etc, etc).
    • LLB damper stuff, especially Cu segments.
  • Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
  • If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Swap out temporary ballast mass in BF, SF.
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
    • Wide-mouth OSEMs from RM to Akutsu-san
  • Adjust height of crossbars below BF.
  • If possible, fix galled pole in BF level of EQ stop.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
  • Check inside SF for lost ruler.
  • Tighten PI yaw return spring.
  • Get Cu O-rings for feedthroughs.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark).
  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

SR Prep Tasks

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Design final SF ballast masses (Fabian).

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)