Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
[[#RealBSHang|Preparation for Real BS Hang]] |
|
Line 23: | Line 21: |
== 2017-08-21 == === Design/Documentation/Planning === * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. |
|
Line 27: | Line 22: |
=== Main Assembly === * --(Wrap new IM bottom ballast masses (Mozumi).)-- * --(Install new IM masses.)-- * --(Set up optical level.)-- * --(Adjust IM ballast mass to give desired roll/pitch/vertical.)-- * --(Level BF.)-- * --(Cable BF LVDT, test and calibrate.)-- * --(Adjust top of IRM to level.)-- * --(Install IRM side panels.)-- * --(Install IRM OSEMs.)-- * --(Cable IRM OSEMs)-- and test. * --(Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.)-- * --(Add extra ballast mass to BF.)-- * --(Add BF cap but don't anchor cables.)-- * --(Cable and test BF cap picos.)-- * --(Lift BF/IRM/IM/RM/BS and weigh.)-- * --(Adjust BF ballast if necessary.)-- * --(Crane in SF.)-- * Hook up BF/IRM/IM/RM/BS. * Route cables up to SF. * Adjust BF ballast if necessary. |
== 2017-09-25 == |
Line 49: | Line 24: |
=== Time permitting === * Lay more new in-air cabling. |
=== Main Assembly Sequence === * --(Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).)-- * --(Fix #1 geophone adapter cable.)-- * Fix broken pico adapter cable? * Debug all electronics, starting with IRM OSEMs. (half done) * --(Unlock IP; use jacks and FRs to center.)-- * Check IP yaw. * Recheck centering of suspension in assembly frame. * Measure IP period; adjust ballast mass. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * LBB stuff (see below). * === LBB Sequence === * --(Unclamp LBB ring sandwich; fully suspend Cu ring.)-- * --(Unscrew LBB from tank brackets.)-- * --(Hook LBB.)-- * --(Remove TBD amount of spacers from between LBB and tank brackets.)-- * --(Set LBB blade stops to nominal height.)-- * --(Extend foot screws on LBB to just barely support LBB.)-- * --(Adjust height of LBB magnet ring to set proper gap (4 mm??).)-- * --(Retract LBB foot screws.)-- * --(Add temporary ballast to LBB until LBB blades just barely sink below stops.)-- * --(Check distance from LBB to main beam height (or other suitable reference); adjust by screwing receptacles.)-- * --(Set foot screws to give ≈5 mm (or TBD) movement range of LBB below nominal.)-- * --(Set stop on LBB blades to give ≈3 mm (or TBD, less than Cu-magnet gap) of LBB above nominal.)-- === In parallel, time permitting === |
Line 53: | Line 54: |
== Real BS Hang Tasks == | == Tasks Not To Forget == |
Line 55: | Line 56: |
* Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. | |
Line 57: | Line 59: |
* --(Final ballast mass production for BF and SF (Hirata-san). )-- * --(Design of receptacles for rods with 8 mm heads.)-- * --(Possible rebuild of BF)-- * --(Set up build/test stand for filters.)-- * --(Get filter test weights.)-- * --(Find spare BF blade(s).)-- * Reclean stuff: * PI (remove Kapton tape etc, etc). * LLB damper stuff, especially Cu segments. * Calibrate SF LVDT. * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * Calibrate PI horizontal LVDTs. |
* Figure out how to make PI yaw adjustment reliable. |
Line 75: | Line 65: |
* --(Swap out temporary ballast mass in BF)--, SF. | |
Line 79: | Line 68: |
* --(Wide-mouth OSEMs from RM to Akutsu-san)-- * --(Adjust height of crossbars below BF.)-- * --(If possible, fix galled pole in BF level of EQ stop.)-- |
|
Line 83: | Line 69: |
* --(Check inside SF for lost ruler.)-- * Tighten PI yaw return spring. * Get Cu O-rings for feedthroughs. |
|
Line 89: | Line 72: |
* Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3 * --(Remove cling wrap in BF and install vacuum-compatible heat shrink.)-- * --(Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).)-- * --(Rewire PI horizontal steppers with vacuum-compatible cable)--. * --(Adjust yoke on BF to put top of secondary at 3.5 mm above top of baseplate (or to give ≈0 counts at nominal height).)-- * Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height). |
* Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 |
Line 105: | Line 83: |
* --(Create a proper DAC Monitor MEDM screen.)-- * --(Improve ADC Monitor MEDM screen.)-- |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-09-25
Main Assembly Sequence
Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).
Fix #1 geophone adapter cable.
- Fix broken pico adapter cable?
- Debug all electronics, starting with IRM OSEMs. (half done)
Unlock IP; use jacks and FRs to center.
- Check IP yaw.
- Recheck centering of suspension in assembly frame.
- Measure IP period; adjust ballast mass.
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- LBB stuff (see below).
LBB Sequence
Unclamp LBB ring sandwich; fully suspend Cu ring.
Unscrew LBB from tank brackets.
Hook LBB.
Remove TBD amount of spacers from between LBB and tank brackets.
Set LBB blade stops to nominal height.
Extend foot screws on LBB to just barely support LBB.
Adjust height of LBB magnet ring to set proper gap (4 mm??).
Retract LBB foot screws.
Add temporary ballast to LBB until LBB blades just barely sink below stops.
Check distance from LBB to main beam height (or other suitable reference); adjust by screwing receptacles.
Set foot screws to give ≈5 mm (or TBD) movement range of LBB below nominal.
Set stop on LBB blades to give ≈3 mm (or TBD, less than Cu-magnet gap) of LBB above nominal.
In parallel, time permitting
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Get pico drive screens fixed (Miyo-kun)
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Get clean bag laundered.
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Lock washers for LBB dampers
- Temporary ballast mass (dog clamps) in BF.
- Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Electrical
- Decide final in-vacuum and in-air cable routing (Enzo).
Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.