Differences between revisions 123 and 157 (spanning 34 versions)
Revision 123 as of 2017-09-03 21:26:31
Size: 3952
Editor: MarkBarton
Comment:
Revision 157 as of 2017-10-10 08:59:50
Size: 2829
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:

[[#RealBSHang|Preparation for Real BS Hang]]
Line 23: Line 21:
== 2017-09-04 ==
== 2017-10-10 ==
Line 26: Line 25:
 * Crane out SF.
 * Raise BF cap and retrieve lost hex cable clamp PEEK piece.
 * Crane in SF.
 * Install SF-BF rod with hex cable clamp.
 * Route cables via hex cable clamp up to below SF.
 * Adjust BF ballast mass for total weight and pitch/roll.
 * Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.
 * Calibrate SF LVDT.
 * Install SF main ballast mass.
 * Cable and test SF fishing rod stepper.
 * Add SF cap.
 * Lift and weigh SF/... section.
 
 * Account for second bubble level (might be on BF).
 * Borrow portable hard drive.
 * Clean up sticker residue and magic marker writing.
 * Remove LVDT modules; identify and replace screws.
 * Check that all in-air cables are labeled.
 * If possible, reroute cable to eliminate need for fifth feedthrough.
 * Debug all electronics, especially actuation.
 * Measure IP period; adjust ballast mass.
 * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Set all EQ stops to TBD clearance.
 * Install small KOACH filters on LBB.
 * Remove First Contact.
 * Cable optical lever (Simon, Enzo)
 * Align optical lever (Simon)
 * Get ready for full TFs.
Line 40: Line 42:
=== In parallel, time permitting ===
 * Rearrange arc weights on PI to allow installation of magic wand.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Rearrange magnets on SF damper magnet ring for full three Cu segments.
 * Find Ni-plated rods for SF damper magnet ring and do fit check.
 * Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.
 * Lay more new in-air cabling.
 * Wipe LLB damper parts with ethanol.
 * Get Cu O-rings for feedthroughs.
 * Figure out how to tighten PI yaw return spring.
=== Etc ===
 * Move stuff out of PR2 area.
 * Tidy/label parts.
 * Move safety bars from BS AF area to SR2 area.
 * (Put up safety bars in SR3 area.)
 * Close hole in floor above BS AF area.

=== Software ===
 * Enter new IP matrices and do safe.snap.
 * Send stepper driver info to Miyo-kun.
 * Update real-time model to number channels from #0.
 * Remove old OL stuff; add link to new OL stuff.
 * Remove unused screens.
 * Sort out SVN.
 * Add support for comments to SUMCON.
 * Create SUMCON model with values commented.
 * Derive matrices for IP FRs.
Line 52: Line 61:
== Real BS Hang Tasks == == Tasks Not To Forget ==
Line 56: Line 65:
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Figure out how to make PI yaw adjustment reliable.
Line 63: Line 69:
 * Get clean bag laundered.
Line 66: Line 71:
  * Lock washers for LBB dampers
Line 68: Line 72:
  * --(Wide-mouth OSEMs from RM to Akutsu-san)--
 * --(Adjust height of crossbars below BF.)--
 * --(If possible, fix galled pole in BF level of EQ stop.)--
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Line 74: Line 74:
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * --(Remove cling wrap in BF and install vacuum-compatible heat shrink.)--
 * --(Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).)--
 * --(Rewire PI horizontal steppers with vacuum-compatible cable)--.
 * --(Adjust yoke on BF to put top of secondary at 3.5 mm above top of baseplate (or to give ≈0 counts at nominal height).)--
 * Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
Line 91: Line 83:
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-10

Main Assembly Sequence

  • Account for second bubble level (might be on BF).
  • Borrow portable hard drive.
  • Clean up sticker residue and magic marker writing.
  • Remove LVDT modules; identify and replace screws.
  • Check that all in-air cables are labeled.
  • If possible, reroute cable to eliminate need for fifth feedthrough.
  • Debug all electronics, especially actuation.
  • Measure IP period; adjust ballast mass.
  • Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to TBD clearance.
  • Install small KOACH filters on LBB.
  • Remove First Contact.
  • Cable optical lever (Simon, Enzo)
  • Align optical lever (Simon)
  • Get ready for full TFs.

Etc

  • Move stuff out of PR2 area.
  • Tidy/label parts.
  • Move safety bars from BS AF area to SR2 area.
  • (Put up safety bars in SR3 area.)
  • Close hole in floor above BS AF area.

Software

  • Enter new IP matrices and do safe.snap.
  • Send stepper driver info to Miyo-kun.
  • Update real-time model to number channels from #0.
  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.
  • Sort out SVN.
  • Add support for comments to SUMCON.
  • Create SUMCON model with values commented.
  • Derive matrices for IP FRs.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.