== 2017-09-04 ==
== ASAP ==

=== Pumpdown Prep ===
 * Prepare BS Chamber
  * --(Remove non-vacuum-compatible ballast from LBB.)--
  * --(Check for lost tools.)--
  * Wipe down all accessible areas inside tank with Vector Alpha wipes and ethanol.
 * Help Type Bp Team
  * --(Add screws to cables at PR2 feedthroughs.)--
Line 24: Line 33:
 * Crane out SF.
 * Raise BF cap and retrieve lost hex cable clamp PEEK piece.
 * Crane in SF.
 * Install SF-BF rod with hex cable clamp.
 * Route cables via hex cable clamp up to below SF.
 * Adjust BF ballast mass for total weight and pitch/roll.
 * Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.
 * Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Calibrate SF LVDT.
 * Install SF main ballast mass.
 * Cable and test SF fishing rod stepper.
 * Add SF cap.
 * Lift and weigh SF/... section.
 
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''
  * Check IP BIO is working or not.
Line 39: Line 39:
=== In parallel, time permitting ===
 * Rearrange arc weights on PI to allow installation of magic wand.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Rearrange magnets on SF damper magnet ring for full three Cu segments.
 * Find Ni-plated rods for SF damper magnet ring and do fit check.
 * Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.
 * Lay more new in-air cabling.
 * Wipe LLB damper parts with ethanol.
 * Get Cu O-rings for feedthroughs.
 * Figure out how to tighten PI yaw return spring.
 * Necessary for phase-II★★
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Re-calibrate F0 GAS LVDT
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.

 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control

=== Documentation and Operation Manual ===
 * Add useful info from Enzo's notebook to BSData.
Line 53: Line 64:
 * Move safety bars from BS AF area to SR2 area.
 * Close hole in floor above BS AF area.
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
Line 55: Line 70:
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Figure out how to make PI yaw adjustment reliable.
Line 62: Line 74:
 * Get clean bag laundered.
Line 65: Line 76:
  * Lock washers for LBB dampers
Line 67: Line 77:
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Line 69: Line 78:
<<Anchor(elec)>>
Line 70: Line 80:
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Update BS Circuit diagram, D1503600
  * Make generic for BS+SRx???
  * Note removal of LED/PD on TM OSEMs.
  * Include information on assignment of channels to feedthrough positions.
  * Reflect gender-changers and non-flipping feedthrough adapters.
  * Reflect actual cable lengths.
  * Include LVDT pin size (1 mm).
  * Undo renumbering of IP items.
Line 81: Line 96:
 * Design and install GAS drift compensation filters.
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

ASAP

Pumpdown Prep

  • Prepare BS Chamber
    • Remove non-vacuum-compatible ballast from LBB.

    • Check for lost tools.

    • Wipe down all accessible areas inside tank with Vector Alpha wipes and ethanol.
  • Help Type Bp Team
    • Add screws to cables at PR2 feedthroughs.

Main Assembly Sequence

  • Necessary for phase-I★★★
    • Modify IP LVDT damping filters to include set point.

    • TFs.

    • EXCHANGE YAW/VERT FRs at F0

    • Check IP BIO is working or not.
  • Necessary for phase-II★★
    • Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

    • Design PI Sensor blending filter.
    • Re-calibrate F0 GAS LVDT
    • Tune the LVDT sensitivity
    • Measure IP period; adjust ballast mass.
  • At some point (remotely)★
    • Improve OL offloading.
    • Improve GAS offloading.
    • Spectral analysis of Oplev.
    • Design, install angular lock servo using OL. (Almost done for phase-I)
    • Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
    • Subtract DC level of Geophones.
    • Spectra analysis of PI sensors (PI LVDTs and Geophones).
    • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
    • Set all EQ stops to TBD clearance.
    • Modify the model for IP coil driver control

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.
  • Close hole in floor above BS AF area.
  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

  • Update BS Circuit diagram, D1503600
    • Make generic for BS+SRx???
    • Note removal of LED/PD on TM OSEMs.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Undo renumbering of IP items.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.