Line 21: Line 21:
== 2017-09-04 ==
== 2017-10-02 ==
Line 24: Line 25:
 * --(Crane out SF.)--
 * --(Raise BF cap and retrieve lost hex cable clamp PEEK piece.)--
 * --(Crane in SF.)--
 * --(Install SF-BF rod with hex cable clamp.)--
 * --(Route cables via hex cable clamp up to below SF.)--
 * --(Adjust BF ballast mass for total weight and pitch/roll.)--
 * --(Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.)--
 * --(Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).)--
 * Calibrate SF LVDT.
 * Install SF main ballast mass.
 * --(Cable and test SF fishing rod stepper.)--
 * Add SF cap.
 * Lift and weigh SF/... section.
 
 * --(Tidy up and cover things to prepare for SR2 crane slot work.)--
 * --(Replace BS service port covers.)--
 * --(Check for bubble level and other tools in tank.)--
 * Remove stickers on IP and clean with ethanol (some were missed last time).
 * Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
 * Check that all in-air cables are labeled.
 * Fix broken pico adapter cable?
 * If possible, reroute cable to eliminate need for fifth feedthrough.
 * Debug all electronics, especially actuation.
 * --(Check IP yaw.)--
 * --(Recheck centering of suspension in assembly frame.)--
 * Measure IP period; adjust ballast mass.
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Set all EQ stops to proper clearance.
 * Get ready for full TFs.
Line 39: Line 42:
=== In parallel, time permitting ===
 * --(Rearrange arc weights on PI to allow installation of magic wand.)--
 * Install magic wand on PI.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Rearrange magnets on SF damper magnet ring for full three Cu segments.
 * --(Find Ni-plated rods for SF damper magnet ring and do fit check.)--
 * --(Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.)--
 * Lay more new in-air cabling.
 * Wipe LLB damper parts with ethanol.
 * Get Cu O-rings for feedthroughs.
 * Figure out how to tighten PI yaw return spring.
 * --(Recalibrate remachined LBB springs and choose best three.)--
=== Software ===
 * Enter new IP matrices and do safe.snap.
 * Get pico drive screens fixed (Miyo-kun)
 * Update real-time model to number channels from #0.
 * Remove old OL stuff; add link to new OL stuff.
 * Remove unused screens.
 * Sort out SVN.
Line 57: Line 55:
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Figure out how to make PI yaw adjustment reliable.
Line 72: Line 67:
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
Line 84: Line 76:
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-02

Main Assembly Sequence

  • Tidy up and cover things to prepare for SR2 crane slot work.

  • Replace BS service port covers.

  • Check for bubble level and other tools in tank.

  • Remove stickers on IP and clean with ethanol (some were missed last time).
  • Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
  • Check that all in-air cables are labeled.
  • Fix broken pico adapter cable?
  • If possible, reroute cable to eliminate need for fifth feedthrough.
  • Debug all electronics, especially actuation.
  • Check IP yaw.

  • Recheck centering of suspension in assembly frame.

  • Measure IP period; adjust ballast mass.
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to proper clearance.
  • Get ready for full TFs.

Software

  • Enter new IP matrices and do safe.snap.
  • Get pico drive screens fixed (Miyo-kun)
  • Update real-time model to number channels from #0.
  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.
  • Sort out SVN.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)