* --(Crane out SF.)-- * --(Raise BF cap and retrieve lost hex cable clamp PEEK piece.)-- * --(Crane in SF.)-- * --(Install SF-BF rod with hex cable clamp.)-- * --(Route cables via hex cable clamp up to below SF.)-- * --(Adjust BF ballast mass for total weight and pitch/roll.)-- * --(Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.)-- * --(Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).)-- * --(Calibrate SF LVDT.)-- * --(Install SF main ballast mass.)-- * --(Cable and test SF fishing rod stepper.)-- * --(Add SF cap.)-- * Lift and weigh SF/... section. |
* --(Account for second bubble level (might be on BF))--. * Borrow portable hard drive. * Clean up sticker residue and magic marker writing. * Remove LVDT modules; identify and replace screws. * --(Check that all in-air cables are labeled)--. * If possible, reroute cable to eliminate need for fifth feedthrough. * Debug all electronics, especially actuation. * Measure IP period; adjust ballast mass. * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * Set all EQ stops to TBD clearance. * Install small KOACH filters on LBB. * Remove First Contact. * Cable optical lever (Simon, Enzo) * Align optical lever (Simon) * Get ready for full TFs. |
Line 39: | Line 42: |
=== In parallel, time permitting === * --(Rearrange arc weights on PI to allow installation of magic wand.)-- * --(Install magic wand on PI.)-- * Check that we still have all LBB parts (there was an issue with borrowed lock nuts). * --(Rearrange magnets on SF damper magnet ring for full three Cu segments.)-- * --(Find Ni-plated rods for SF damper magnet ring and do fit check.)-- * --(Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.)-- * Wipe LLB damper parts with ethanol. * --(Get Cu O-rings for feedthroughs.)-- * Figure out how to tighten PI yaw return spring. * --(Recalibrate remachined LBB springs and choose best three.)-- |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * (Put up safety bars in SR3 area.) * Close hole in floor above BS AF area. |
Line 51: | Line 49: |
== Dates == * Repaired LBB half ring is returned: 9/11 (Mon, lunchtime) * BUMAX countersunk screws for LBB Cu * SDC screws for LBB half rings: 9/15 (Fri) * LBB Cu segments: 9/19-20 |
=== Software === * Enter new IP matrices and do safe.snap. * Send stepper driver info to Miyo-kun. * Update real-time model to number channels from #0. * Remove old OL stuff; add link to new OL stuff. * Remove unused screens. * Sort out SVN. * Add support for comments to SUMCON. * Create SUMCON model with values commented. * Derive matrices for IP FRs. === Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. |
Line 62: | Line 69: |
* Get pico drive screens fixed (Miyo-kun) * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * Calibrate PI horizontal LVDTs. |
* Figure out how to make PI yaw adjustment reliable. |
Line 69: | Line 73: |
* Get clean bag laundered. | |
Line 72: | Line 75: |
* Lock washers for LBB dampers | |
Line 74: | Line 76: |
* Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match. | |
Line 77: | Line 78: |
* Decide final in-vacuum and in-air cable routing (Enzo). * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height). |
|
Line 89: | Line 87: |
* --(Create a proper DAC Monitor MEDM screen.)-- * --(Improve ADC Monitor MEDM screen.)-- |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-10
Main Assembly Sequence
Account for second bubble level (might be on BF).
- Borrow portable hard drive.
- Clean up sticker residue and magic marker writing.
- Remove LVDT modules; identify and replace screws.
Check that all in-air cables are labeled.
- If possible, reroute cable to eliminate need for fifth feedthrough.
- Debug all electronics, especially actuation.
- Measure IP period; adjust ballast mass.
Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- Set all EQ stops to TBD clearance.
- Install small KOACH filters on LBB.
- Remove First Contact.
- Cable optical lever (Simon, Enzo)
- Align optical lever (Simon)
- Get ready for full TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- (Put up safety bars in SR3 area.)
- Close hole in floor above BS AF area.
Software
- Enter new IP matrices and do safe.snap.
- Send stepper driver info to Miyo-kun.
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Remove unused screens.
- Sort out SVN.
- Add support for comments to SUMCON.
- Create SUMCON model with values commented.
- Derive matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.