== 2017-09-11 ==
== ASAP ==
 * Get picomotor drivers back on line.
 * Debug BS BIO connections, especially PI IP.
Line 24: Line 27:
 * Debug BF LVDT actuation.
 * Debug other actuation.
 * Remove F-0 rod and reinstall with hex cable clamp.
 * Route cables up past hex cable clamps.
 * Adjust SF trim mass for pitch/roll/vertical.
 *
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''
Line 31: Line 32:
=== In parallel, time permitting ===
 * Fix links to ADC_MONITOR screens.
 * Check that all Take/Restore Safe.snap buttons work.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Wipe LLB damper parts with ethanol.
 * Figure out how to tighten PI yaw return spring.
 * Necessary for phase-II★★
  * Debug BS geophones.
  * Flip circuit boards in BS geophones to make them the same as SRx.
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Re-calibrate F0 GAS LVDT
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.
Line 38: Line 41:
== Dates ==
 * BUMAX countersunk screws for LBB Cu
 * SDC screws for LBB half rings: 9/15 (Fri)
 * LBB Cu segments: 9/19-20
 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control

=== Documentation and Operation Manual ===
 * Add useful info from Enzo's notebook to BSData.
Line 46: Line 59:
 * Move safety bars from BS AF area to SR2 area.
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
Line 48: Line 64:
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Figure out how to make PI yaw adjustment reliable.
Line 55: Line 68:
 * Get clean bag laundered.
Line 58: Line 70:
  * Lock washers for LBB dampers
Line 60: Line 71:
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.  * Characterize replacement F0.
 * Wipe/clean arc weights that were rained on.
Line 62: Line 74:
<<Anchor(elec)>>
Line 63: Line 76:
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Update BS Circuit diagram, D1503600
  * --(Note removal of LED/PD on TM OSEMs.)--
  * Organize stepper reset system and watchdog BIO.
  * Include information on assignment of channels to feedthrough positions.
  * Reflect gender-changers and non-flipping feedthrough adapters.
  * Reflect actual cable lengths.
  * Include LVDT pin size (1 mm).
  * Include Stepper pin size (1.6 mm).
  * --(Undo renumbering of IP items.)--
  * --(Page 10: "DIO Card # 0" should be "DIO Card # 1")--
  * --(Include OutConfigBoards on OL page (Sheet 18).)--
  * --(Update HPCD section to reflect:)--
   * --(All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.)--
   * --(Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.)--
Line 74: Line 98:
 * Design and install GAS drift compensation filters.
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

ASAP

  • Get picomotor drivers back on line.
  • Debug BS BIO connections, especially PI IP.

Main Assembly Sequence

  • Necessary for phase-I★★★
    • Modify IP LVDT damping filters to include set point.

    • TFs.

    • EXCHANGE YAW/VERT FRs at F0

  • Necessary for phase-II★★
    • Debug BS geophones.
    • Flip circuit boards in BS geophones to make them the same as SRx.
    • Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

    • Design PI Sensor blending filter.
    • Re-calibrate F0 GAS LVDT
    • Tune the LVDT sensitivity
    • Measure IP period; adjust ballast mass.
  • At some point (remotely)★
    • Improve OL offloading.
    • Improve GAS offloading.
    • Spectral analysis of Oplev.
    • Design, install angular lock servo using OL. (Almost done for phase-I)
    • Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
    • Subtract DC level of Geophones.
    • Spectra analysis of PI sensors (PI LVDTs and Geophones).
    • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
    • Set all EQ stops to TBD clearance.
    • Modify the model for IP coil driver control

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.
  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.
  • Characterize replacement F0.
  • Wipe/clean arc weights that were rained on.

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.