Line 3: Line 3:
2017-04-03

== Facilities (mostly full team) ==
== Every Week ==
=== Facilities (mostly full team) ===
Line 11: Line 10:
== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
== 2017-04-03 ==

=== SF/BF/... ===
 * Trim BF to correct pitch/roll.
 * Install temporary ballast mass in SF.
 * Lift SF/BF/... and check SF pitch/roll balance and overall weight.

=== Continue PI Prep ===
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Enlarge ring of crane adapter.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Set up LBB blade tensioning jig.
 * Install LLB blades.
 * Install LLB blade units in PI.

=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ===
Line 15: Line 29:
 * Debug TM-H4.
Line 16: Line 31:
== Electronics (mostly Enzo, Mark) ==
 * Make more anti-feedthrough adapters.
=== Electronics (mostly Enzo, Mark) ===
Line 26: Line 40:
== PI Prep ==
 * Prepare PI for moving.
  * Remove accelerometers.
  * Remove large weights.
  * Remove arc weights (move some to second floor, wrap rest for storage).
  * Attach lifting plates.
  * Wrap with clingwrap, cover with spare cleanbag.
 * Clear path to remove PI with forklift.
  * Move worktables.
  * Move portable cleanroom.
  * Shutdown rack and move electrical cables.
 * Prepare second floor for receiving PI.
  * Clean and clingwrap pallet.
  * Double-check dimensions.
  * Disconnect fan cables, curtain.
 * Crane PI into clean booth.
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB blade units in PI.
Line 49: Line 41:
 * Get Perry (and Enzo) set up with SUMCON.
 * Update SUMCON model of full BS.
 * Do cut-down SUMCON model of just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).

VIS Type B Near Term To-Do List

Every Week

Facilities (mostly full team)

  • Clean up after floor work.
  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

2017-04-03

SF/BF/...

  • Trim BF to correct pitch/roll.
  • Install temporary ballast mass in SF.
  • Lift SF/BF/... and check SF pitch/roll balance and overall weight.

Continue PI Prep

  • Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
  • Install fishing rod.
  • Enlarge ring of crane adapter.
  • Find table, weights, etc for use with LBB blade bending jigs.
  • Set up LBB blade tensioning jig.
  • Install LLB blades.
  • Install LLB blade units in PI.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Test SF LVDT.
  • Test SF fishing rod stepper.
  • Debug TM-H4.

Electronics (mostly Enzo, Mark)

  • Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

Real-time and SUMCON models (mostly Perry, Mark)

  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.