= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
2017-04-03 This list has been merged into the common Type B list: [[../ToDo]].
Line 5: Line 5:
== Facilities (mostly full team) ==
 * Clean up after floor work.
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.

== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Test SF LVDT.
 * Test SF fishing rod stepper.

== Electronics (mostly Enzo, Mark) ==
 * Make more anti-feedthrough adapters.
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep ==
 * Prepare PI for moving.
  * Remove accelerometers.
  * Remove large weights.
  * Remove arc weights (move some to second floor, wrap rest for storage).
  * Attach lifting plates.
  * Wrap with clingwrap, cover with spare cleanbag.
 * Clear path to remove PI with forklift.
  * Move worktables.
  * Move portable cleanroom.
  * Shutdown rack and move electrical cables.
 * Prepare second floor for receiving PI.
  * Clean and clingwrap pallet.
  * Double-check dimensions.
  * Disconnect fan cables, curtain.
 * Crane PI into clean booth.
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB blade units in PI.

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Get Perry (and Enzo) set up with SUMCON.
 * Update SUMCON model of full BS.
 * Do cut-down SUMCON model of just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
[[../ToDoOldBS|Archived BS To-Do Items]]

VIS Type B BS Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.