== 2017-09-19 ==
(No work Monday 9/18)
== 2017-10-02 ==

=== SR2 stuff ===
 * Replace BS service port covers, or reinforce foil with tape.
 * Cling-wrap or move:
  * White plastic table
  * Writing table
  * Tall metal table

Line 25: Line 33:
 * Debug BF LVDT actuation. ???
 * Check F0 yoke height (top of coil former should be 37.5 mm above bottom of recess in top of baseplate).
 * Test all PI items:
  * Yaw stepper (tested, not clearly working).
  * F0 LVDT sensing
  * F0 LVDT actuation
  * Horizontal LVDT sensing
  * Horizontal LVDT actuation
  * Geophones (issues with driver, cables, descramblers)
 * Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS.
 * Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS.
 * Double check BS pitch with OL.
 * Adjust SF damper ring to correct gap.
 * Install lock nuts on F0 GAS FR at TBD positions.
 * Lock BF and F0 keystones (but ''not'' SF keystone).
 * Lock RM to BS and IRM to IM.
 * Lock RM, IRM and BF (but not SF) to security structure.
 * Lock IP.
 * Remove F0 keystone top plate (including yaw stepper) and immobilize SF/... in yaw.
 * Attach lifting fixture.
 * Remove BF- and SF-level crossbars.
 * Remove geophones for craning.
 * Disconnect in-vacuum cables from feedthrough and coil neatly for craning.
 * Attach lifting plates.
=== Tank Preparation Sequence ===
 * Attach Cu segments to LBB damper ring.
 * Pass halves of LBB magnet ring into tank, join, and make sandwich for craning.
 * Crane tank lid off.
 * Crane LBB damper rings to top of tank and suspend.
 * Crane suspension out of assembly frame.
 * Attach LBB upper rods to LBB blade tips and rotate suspension 45° clockwise.
 * Crane suspension into tank and connect upper rods to LBB Cu ring.
 * Unclamp LBB ring "sandwich" so LBB Cu ring is suspended on upper rods.
 * Install LBB lower rods and hook LBB.
 * Measure required ballast for LBB.
 * Unlock suspension and readjust.
 * Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).
 * Check for bubble level and other tools in tank.
 * Remove stickers on IP and clean with ethanol (some were missed last time).
 * Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
 * Check that all in-air cables are labeled.
 * Fix broken pico adapter cable?
 * If possible, reroute cable to eliminate need for with feedthrough.
 * Debug all electronics, especially actuation.
 * Check IP yaw.
 * Recheck centering of suspension in assembly frame.
 * Measure IP period; adjust ballast mass.
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Get ready for full TFs.
Line 63: Line 46:
=== In parallel, time permitting ===
 * Fix issue with geophone distributor.
 * Fix #1 geophone adapter cable (and replace borrowed one).
 * Fix broken pico adapter cable.
 * Figure out how to tighten PI yaw return spring or otherwise make yaw adjustment reliable.
=== Software ===
 * Enter new IP matrices and do safe.snap.
 * Get pico drive screens fixed (Miyo-kun)
 * Update real-time model to number channels from #0.
Line 74: Line 56:
 * Get pico drive screens fixed (Miyo-kun)  * Figure out how to make PI yaw adjustment reliable.
Line 87: Line 69:
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3  * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-02

SR2 stuff

  • Replace BS service port covers, or reinforce foil with tape.
  • Cling-wrap or move:
    • White plastic table
    • Writing table
    • Tall metal table

Main Assembly Sequence

  • Check for bubble level and other tools in tank.
  • Remove stickers on IP and clean with ethanol (some were missed last time).
  • Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
  • Check that all in-air cables are labeled.
  • Fix broken pico adapter cable?
  • If possible, reroute cable to eliminate need for with feedthrough.
  • Debug all electronics, especially actuation.
  • Check IP yaw.
  • Recheck centering of suspension in assembly frame.
  • Measure IP period; adjust ballast mass.
  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Get ready for full TFs.

Software

  • Enter new IP matrices and do safe.snap.
  • Get pico drive screens fixed (Miyo-kun)
  • Update real-time model to number channels from #0.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.