Line 1: Line 1:
= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
2017-04-03 [[../ToDoOldBS|Archived BS To-Do Items]]
Line 5: Line 5:
== Facilities (mostly full team) ==
 * Clean up after floor work.
[[../ToDoSR|SR To-Do Items]]

[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
Line 10: Line 18:
 * Get stuff from [[../WishList]]
Line 11: Line 20:
== PI Move ==
 * General prep
  * Decide if air shower needs to be moved.
  * Triple-check dimensions around second-floor parking spot for PI; decide best place for pallet.
  * Check for obstacles along path around -X side of cleanbooth.
  * Find/clean Saito-sensei's PI lifting adapter and any needed fasteners.
  * Check both crane remote controls (clean and dirty) are charged.
 * Prepare PI for moving.
  * Remove accelerometers and store safely.
  * Remove large weights. (How? With forklift at last minute? Where to?)
  * Remove arc weights (move some to second floor, wrap rest for storage).
  * Attach lifting plates.
  * Wrap with clingwrap, cover with spare cleanbag.
  * Remove old cabling from PI to rack.
 * Prepare second floor for receiving PI.
  * Clean and clingwrap pallet.
  * Find metal plates and/or duckboards for on top of pallets.
  * Move BS cables on -Y side of tank off top of beam.
  * Find shims (about 75 mm high) to put on beam where cables were, to help support pallet.
 * Clear path to remove PI with forklift.
  * Move any obstacles identified previously.
  * Shutdown BS/PR2 racks and move electrical cables.
  * Move any stored items on -Y side of portable cleanroom.
  * Move portable cleanroom towards -Y.
  * Move worktables from next to BS/PR2 racks.
 * Move PI
  * Disconnect fan cables, curtain (Miyoki-san).
  * Unzip ceiling panel.
  * Crane pallet into cleanbooth.
  * Lay foil on pallet.
  * Forklift PI to -X,+Y corner of cleanbooth
  * Crane PI into clean booth.
 * Cleanup
  * Zip up ceiling panel.
  * Reconnect fan cables, curtain (Miyoki-san).
  * Replace tables near BS/PR2 racks
  * Move portable cleanroom back to original spot.
  * Re-lay electrical cables.
  * Power up racks.
<<Anchor(ComingWeeks)>>
Line 51: Line 22:
== Continue PI Prep ==
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB blade units in PI.
== 2017-10-02 ==
Line 58: Line 24:
== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Test SF LVDT.
 * Test SF fishing rod stepper.
=== SR2 stuff ===
 * Replace BS service port covers, or reinforce foil with tape.
 * Cling-wrap or move:
  * White plastic table
  * Writing table
  * Tall metal table
Line 63: Line 31:
== Electronics (mostly Enzo, Mark) ==
 * Make more anti-feedthrough adapters.
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san

=== Main Assembly Sequence ===
 * Check for bubble level and other tools in tank.
 * Remove stickers on IP and clean with ethanol (some were missed last time).
 * Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
 * Check that all in-air cables are labeled.
 * Fix broken pico adapter cable?
 * If possible, reroute cable to eliminate need for with feedthrough.
 * Debug all electronics, especially actuation.
 * Check IP yaw.
 * Recheck centering of suspension in assembly frame.
 * Measure IP period; adjust ballast mass.
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Get ready for full TFs.

=== Software ===
 * Enter new IP matrices and do safe.snap.
 * Get pico drive screens fixed (Miyo-kun)
 * Update real-time model to number channels from #0.
 * Remove old OL stuff; add link to new OL stuff.
 * Remove unused screens.
 * Sort out SVN.

<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Figure out how to make PI yaw adjustment reliable.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 71: Line 77:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Get Perry (and Enzo) set up with SUMCON.
 * Update SUMCON model of full BS.
 * Do cut-down SUMCON model of just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-02

SR2 stuff

  • Replace BS service port covers, or reinforce foil with tape.
  • Cling-wrap or move:
    • White plastic table
    • Writing table
    • Tall metal table

Main Assembly Sequence

  • Check for bubble level and other tools in tank.
  • Remove stickers on IP and clean with ethanol (some were missed last time).
  • Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe.
  • Check that all in-air cables are labeled.
  • Fix broken pico adapter cable?
  • If possible, reroute cable to eliminate need for with feedthrough.
  • Debug all electronics, especially actuation.
  • Check IP yaw.
  • Recheck centering of suspension in assembly frame.
  • Measure IP period; adjust ballast mass.
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Get ready for full TFs.

Software

  • Enter new IP matrices and do safe.snap.
  • Get pico drive screens fixed (Miyo-kun)
  • Update real-time model to number channels from #0.
  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.
  • Sort out SVN.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.