= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
2017-04-03 This list has been merged into the common Type B list: [[../ToDo]].
Line 5: Line 5:
== Facilities (mostly full team) ==
 * Clean up after floor work.
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.

== PI Move ==
 * General prep
  * Decide if air shower needs to be moved.
  * Triple-check dimensions around second-floor parking spot for PI; decide best place for pallet.
  * Check for obstacles along path around -X side of cleanbooth.
  * Find/clean Saito-sensei's PI lifting adapter and any needed fasteners.
  * Check both crane remote controls (clean and dirty) are charged.
 * Prepare PI for moving.
  * Remove accelerometers and store safely.
  * Remove large weights. (How? With forklift at last minute? Where to?)
  * Remove arc weights (move some to second floor, wrap rest for storage).
  * Attach lifting plates.
  * Wrap with clingwrap, cover with spare cleanbag.
  * Remove old cabling from PI to rack.
 * Prepare second floor for receiving PI.
  * Clean and clingwrap pallet.
  * Find metal plates and/or duckboards for on top of pallets.
  * Move BS cables on -Y side of tank off top of beam.
  * Find shims (about 75 mm high) to put on beam where cables were, to help support pallet.
 * Clear path to remove PI with forklift.
  * Move any obstacles identified previously.
  * Shutdown BS/PR2 racks and move electrical cables.
  * Move any stored items on -Y side of portable cleanroom.
  * Move portable cleanroom towards -Y.
  * Move worktables from next to BS/PR2 racks.
 * Move PI
  * Disconnect fan cables, curtain (Miyoki-san).
  * Unzip ceiling panel.
  * Crane pallet into cleanbooth.
  * Lay foil on pallet.
  * Forklift PI to -X,+Y corner of cleanbooth
  * Crane PI into clean booth.
 * Cleanup
  * Zip up ceiling panel.
  * Reconnect fan cables, curtain (Miyoki-san).
  * Replace tables near BS/PR2 racks
  * Move portable cleanroom back to original spot.
  * Re-lay electrical cables.
  * Power up racks.

== Continue PI Prep ==
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB blade units in PI.

== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Test SF LVDT.
 * Test SF fishing rod stepper.

== Electronics (mostly Enzo, Mark) ==
 * Make more anti-feedthrough adapters.
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Get Perry (and Enzo) set up with SUMCON.
 * Update SUMCON model of full BS.
 * Do cut-down SUMCON model of just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
[[../ToDoOldBS|Archived BS To-Do Items]]

VIS Type B BS Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.

Archived BS To-Do Items

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)