2764
Comment:
|
2935
|
Deletions are marked like this. | Additions are marked like this. |
Line 22: | Line 22: |
== 2017-10-02 == | == 2017-10-10 == |
Line 25: | Line 25: |
* Tidy up and cover things to prepare for SR2 crane slot work. * Replace BS service port covers. * Check for bubble level and other tools in tank. * Remove stickers on IP and clean with ethanol (some were missed last time). * Wipe rusty screws on IP LVDTs and surrounding area with ethanol-soaked wipe. * Check that all in-air cables are labeled. * Fix broken pico adapter cable? * If possible, reroute cable to eliminate need for with feedthrough. |
* --(Account for second bubble level (might be on BF))--. * Borrow portable hard drive. * Clean up sticker residue and magic marker writing. * Remove LVDT modules; identify and replace screws. * --(Check that all in-air cables are labeled)--. * If possible, reroute cable to eliminate need for fifth feedthrough. |
Line 34: | Line 32: |
* Check IP yaw. * Recheck centering of suspension in assembly frame. |
|
Line 37: | Line 33: |
* Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 | * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 |
Line 39: | Line 35: |
* Set all EQ stops to proper clearance. | * Set all EQ stops to TBD clearance. * Install small KOACH filters on LBB. * Remove First Contact. * Cable optical lever (Simon, Enzo) * Align optical lever (Simon) |
Line 41: | Line 41: |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * (Put up safety bars in SR3 area.) * Close hole in floor above BS AF area. |
|
Line 44: | Line 51: |
* Get pico drive screens fixed (Miyo-kun) | * Send stepper driver info to Miyo-kun. |
Line 49: | Line 56: |
* Add support for comments to SUMCON. * Create SUMCON model with values commented. * Derive matrices for IP FRs. === Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. |
|
Line 59: | Line 73: |
* Get clean bag laundered. | |
Line 62: | Line 75: |
* Lock washers for LBB dampers | |
Line 64: | Line 76: |
* Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-10
Main Assembly Sequence
Account for second bubble level (might be on BF).
- Borrow portable hard drive.
- Clean up sticker residue and magic marker writing.
- Remove LVDT modules; identify and replace screws.
Check that all in-air cables are labeled.
- If possible, reroute cable to eliminate need for fifth feedthrough.
- Debug all electronics, especially actuation.
- Measure IP period; adjust ballast mass.
Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- Set all EQ stops to TBD clearance.
- Install small KOACH filters on LBB.
- Remove First Contact.
- Cable optical lever (Simon, Enzo)
- Align optical lever (Simon)
- Get ready for full TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- (Put up safety bars in SR3 area.)
- Close hole in floor above BS AF area.
Software
- Enter new IP matrices and do safe.snap.
- Send stepper driver info to Miyo-kun.
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Remove unused screens.
- Sort out SVN.
- Add support for comments to SUMCON.
- Create SUMCON model with values commented.
- Derive matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.