Differences between revisions 156 and 180 (spanning 24 versions)
Revision 156 as of 2017-10-10 08:25:38
Size: 2760
Editor: MarkBarton
Comment:
Revision 180 as of 2017-11-24 11:56:59
Size: 3092
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
== 2017-10-02 == == ASAP ==
Line 25: Line 25:
 * Account for second bubble level (might be on BF).
 * Borrow portable hard drive.
 * Clean up sticker residue and magic marker writing.
 * Remove LVDT modules; identify and replace screws.
 * Check that all in-air cables are labeled.
 * If possible, reroute cable to eliminate need for fifth feedthrough.
 * Debug all electronics, especially actuation.
 * --(Check IP yaw.)--
 * --(Recheck centering of suspension in assembly frame.)--
 * Diagonalize OL.
 * Improve OL offloading.
 * Improve GAS offloading.
 * Spectral analysis of Oplev.
 * Design, install angular lock servo using OL.
 * Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
 * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
 * Subtract DC level of Geophones.
 * Spectra analysis of PI sensors (PI LVDTs and Geophones).
 * Design PI Sensor blending filter.
 * Modify IP LVDT damping filters to include set point.
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Set all EQ stops to TBD clearance.
Line 35: Line 39:
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * Set all EQ stops to proper clearance.
 * Install small KOACH filters on LBB.
 * Remove First Contact.
 * Cable optical lever (Simon, Enzo)
 * Align optical lever (Simon)
 * Get ready for full TFs.
 * TFs.
Line 45: Line 42:
 * Enter new IP matrices and do safe.snap.
 * Get pico drive screens fixed (Miyo-kun)
Line 48: Line 43:
 * Remove old OL stuff; add link to new OL stuff.  * Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix; adapt Shoda-san's version).
 * Write a guardian.
 * Sort out SVN.
 * Create SUMCON model with values commented.

=== Medm screens ===
Line 50: Line 50:
 * Sort out SVN.
=== Documentation and Operation Manual ===
 * Publish matrices for IP FRs.
 * Publish matrices for BS PI sensors v4.
 * Finish Foton Operation Manual page.
 * Complete MEDM Operation Manual page.
 * Pico Motor Operation Manual page.
 * Add useful info from Enzo's notebook to BSData.

=== Design ===
 * Finalize redesign of IP yaw adjuster.
 * Design better F0 FR adjuster.
 * Design LBB ballast mass.
Line 55: Line 67:
 * Move safety bars from BS AF area to SR2 area.
 * Close hole in floor above BS AF area.
 * Wipe any rust from around IP LVDTs.
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
Line 61: Line 78:
 * Get clean bag laundered.
Line 64: Line 80:
  * Lock washers for LBB dampers
Line 66: Line 81:
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Line 77: Line 91:
 * Design and install GAS drift compensation filters.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

ASAP

Main Assembly Sequence

  • Diagonalize OL.
  • Improve OL offloading.
  • Improve GAS offloading.
  • Spectral analysis of Oplev.
  • Design, install angular lock servo using OL.
  • Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
  • Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

  • Subtract DC level of Geophones.
  • Spectra analysis of PI sensors (PI LVDTs and Geophones).
  • Design PI Sensor blending filter.
  • Modify IP LVDT damping filters to include set point.
  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to TBD clearance.
  • Measure IP period; adjust ballast mass.
  • TFs.

Software

  • Update real-time model to number channels from #0.
  • Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix; adapt Shoda-san's version).
  • Write a guardian.
  • Sort out SVN.
  • Create SUMCON model with values commented.

Medm screens

  • Remove unused screens.

Documentation and Operation Manual

  • Publish matrices for IP FRs.
  • Publish matrices for BS PI sensors v4.
  • Finish Foton Operation Manual page.
  • Complete MEDM Operation Manual page.
  • Pico Motor Operation Manual page.
  • Add useful info from Enzo's notebook to BSData.

Design

  • Finalize redesign of IP yaw adjuster.
  • Design better F0 FR adjuster.
  • Design LBB ballast mass.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.
  • Close hole in floor above BS AF area.
  • Wipe any rust from around IP LVDTs.
  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.