Differences between revisions 158 and 160 (spanning 2 versions)
Revision 158 as of 2017-10-10 09:20:10
Size: 2923
Editor: MarkBarton
Comment:
Revision 160 as of 2017-10-12 08:26:48
Size: 2971
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
 * Account for second bubble level (might be on BF).  * --(Account for second bubble level (might be on BF))--.
Line 28: Line 28:
 * Remove LVDT modules; identify and replace screws.
 * Check that all in-air cables are labeled.
 * --(Remove LVDT modules; identify screws.)--
 * --(Check that all in-air cables are labeled)--.
Line 31: Line 31:
 * Debug all electronics, especially actuation.  * --(Debug all electronics, especially actuation.)--
Line 36: Line 36:
 * Install small KOACH filters on LBB.
 * Remove First Contact.
 * Cable optical lever (Simon, Enzo)
 * Align optical lever (Simon)
 * --(Install small KOACH filters on LBB.)--
 * --(Remove First Contact.)--
 * --(Cable optical lever (Simon, Enzo))--
 * --(Align optical lever (Simon))--
Line 50: Line 50:
 * Enter new IP matrices and do safe.snap.  * --(Enter new IP matrices and do safe.snap.)--
Line 56: Line 56:
 * Add support for comments to SUMCON.  * --(Add support for comments to SUMCON.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-10

Main Assembly Sequence

  • Account for second bubble level (might be on BF).

  • Borrow portable hard drive.
  • Clean up sticker residue and magic marker writing.
  • Remove LVDT modules; identify screws.

  • Check that all in-air cables are labeled.

  • If possible, reroute cable to eliminate need for fifth feedthrough.
  • Debug all electronics, especially actuation.

  • Measure IP period; adjust ballast mass.
  • Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to TBD clearance.
  • Install small KOACH filters on LBB.

  • Remove First Contact.

  • Cable optical lever (Simon, Enzo)

  • Align optical lever (Simon)

  • Get ready for full TFs.

Etc

  • Move stuff out of PR2 area.
  • Tidy/label parts.
  • Move safety bars from BS AF area to SR2 area.
  • (Put up safety bars in SR3 area.)
  • Close hole in floor above BS AF area.

Software

  • Enter new IP matrices and do safe.snap.

  • Send stepper driver info to Miyo-kun.
  • Update real-time model to number channels from #0.
  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.
  • Sort out SVN.
  • Add support for comments to SUMCON.

  • Create SUMCON model with values commented.
  • Derive matrices for IP FRs.

Design

  • Finalize redesign of IP yaw adjuster.
  • Design better F0 FR adjuster.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)