Line 1: Line 1:
= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
../ToDoOld [[../ToDoOldBS|Archived BS To-Do Items]]

[[../ToDoSR|SR To-Do Items]]

[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

<<Anchor(EveryWeek)>>
Line 6: Line 14:
=== Facilities (mostly full team) ===
 * Clean up after floor work.
=== Facilities ===
Line 11: Line 18:
 * Get stuff from [[../WishList]]
Line 12: Line 20:
== 2017-04-03 == <<Anchor(ComingWeeks)>>
== 2017-09-11 ==
Line 14: Line 23:
=== SF/BF/... ===
 * Trim BF to correct pitch/roll.
 * Install temporary ballast mass in SF.
 * Lift SF/BF/... and check SF pitch/roll balance and overall weight.
=== Main Assembly Sequence ===
 * Debug BF LVDT actuation.
 * Debug other actuation.
 * Remove F-0 rod and reinstall with hex cable clamp.
 * Route cables up past hex cable clamps.
 * Adjust SF trim mass for pitch/roll/vertical.
 *
Line 19: Line 31:
=== Continue PI Prep ===
 * Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
 * Install fishing rod.
 * Enlarge ring of crane adapter.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Set up LBB blade tensioning jig.
 * Install LLB blades.
 * Install LLB blade units in PI.
=== In parallel, time permitting ===
 * Fix links to ADC_MONITOR screens.
 * Check that all Take/Restore Safe.snap buttons work.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Wipe LLB damper parts with ethanol.
 * Figure out how to tighten PI yaw return spring.
Line 28: Line 38:
=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ===
 * Test SF LVDT.
 * Test SF fishing rod stepper.
 * Debug TM-H4.
== Dates ==
 * BUMAX countersunk screws for LBB Cu
 * SDC screws for LBB half rings: 9/15 (Fri)
 * LBB Cu segments: 9/19-20
Line 33: Line 43:
=== Electronics (mostly Enzo, Mark) ===
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 40: Line 71:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-11

Main Assembly Sequence

  • Debug BF LVDT actuation.
  • Debug other actuation.
  • Remove F-0 rod and reinstall with hex cable clamp.
  • Route cables up past hex cable clamps.
  • Adjust SF trim mass for pitch/roll/vertical.

In parallel, time permitting

  • Fix links to ADC_MONITOR screens.
  • Check that all Take/Restore Safe.snap buttons work.
  • Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
  • Wipe LLB damper parts with ethanol.
  • Figure out how to tighten PI yaw return spring.

Dates

  • BUMAX countersunk screws for LBB Cu
  • SDC screws for LBB half rings: 9/15 (Fri)
  • LBB Cu segments: 9/19-20

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.