1577
Comment:
|
1573
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
== 2017-04-03 == === SF/BF/... === * Trim BF to correct pitch/roll. * Install temporary ballast mass in SF. * Lift SF/BF/... and check SF pitch/roll balance and overall weight. |
== 2017-04-24 == |
Line 20: | Line 15: |
* Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender. * Install fishing rod. * Enlarge ring of crane adapter. * Find table, weights, etc for use with LBB blade bending jigs. * Set up LBB blade tensioning jig. |
|
Line 29: | Line 19: |
* Test SF LVDT. * Test SF fishing rod stepper. * Debug TM-H4. |
* Crane in PI. * Connect up SF/... . * Measure overweight if any. * Try removing some/all Cu dampers. * Remove PI again. * Do final trim of SF, fix LVDT if needed. * Crane PI back in. |
Line 34: | Line 28: |
* Debug SF LVDT. | |
Line 41: | Line 36: |
* Count used, unused and broken in-vac cables and send data to Sato-san. | |
Line 43: | Line 39: |
* Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. |
VIS Type B Near Term To-Do List
Every Week
Facilities (mostly full team)
- Clean up after floor work.
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
2017-04-24
Continue PI Prep
- Install LLB blades.
- Install LLB blade units in PI.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Crane in PI.
- Connect up SF/... .
- Measure overweight if any.
- Try removing some/all Cu dampers.
- Remove PI again.
- Do final trim of SF, fix LVDT if needed.
- Crane PI back in.
Electronics (mostly Enzo, Mark)
- Debug SF LVDT.
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
- Count used, unused and broken in-vac cables and send data to Sato-san.
Real-time and SUMCON models (mostly Perry, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.