Differences between revisions 160 and 174 (spanning 14 versions)
Revision 160 as of 2017-10-12 08:26:48
Size: 2971
Editor: MarkBarton
Comment:
Revision 174 as of 2017-11-10 11:26:03
Size: 3243
Editor: EnzoTapia
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
== 2017-10-10 == == 2017-10-30 ==
Line 25: Line 25:
 * --(Account for second bubble level (might be on BF))--.
 * Borrow portable hard drive.
 * Clean up sticker residue and magic marker writing.
 * --(Remove LVDT modules; identify screws.)--
 * --(Check that all in-air cables are labeled)--.
 * If possible, reroute cable to eliminate need for fifth feedthrough.
 * --(Debug all electronics, especially actuation.)--
 * Measure IP period; adjust ballast mass.
 * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3
 * --(Realign OL.)--
 * Cover OL with foil.
 * Offload IP P&Y offsets to picos.
 * Diagonalize OL.
 * Design, install angular lock servo using OL.
 * Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
 * Calibrate IP LVDT actuation against IP LVDT sensing.(Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
 * Spectra analysis of PI sensors (PI LVDTs and Geophones).
 * Design PI Sensor blending filter.
 * Subtract DC level of Geophones.
 * Modify IP LVDT damping filters to include set point.
Line 36: Line 38:
 * --(Install small KOACH filters on LBB.)--
 * --(Remove First Contact.)--
 * --(Cable optical lever (Simon, Enzo))--
 * --(Align optical lever (Simon))--
 * Get ready for full TFs.
 * Measure IP period; adjust ballast mass.
 * TFs.
Line 46: Line 45:
 * (Put up safety bars in SR3 area.)
Line 50: Line 48:
 * --(Enter new IP matrices and do safe.snap.)--
 * Send stepper driver info to Miyo-kun.
Line 53: Line 49:
 * Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix).
 * Sort out SVN.
 * Add support for comments to SUMCON.
 * Create SUMCON model with values commented.

=== Medm screens ===
Line 55: Line 57:
 * Sort out SVN.
 * --(Add support for comments to SUMCON.)--
 * Create SUMCON model with values commented.
 * Derive matrices for IP FRs.

=== Documentation and Operation Manual===
 * Publish matrices for IP FRs.
 * Publish matrices for BS PI sensors v4.
 * Finish Foton operation Manual.
 * Complete MEDM operation Manual.
 * Pico Motor operation Manual.
 * Add useful info from Enzo's notebook to BSData.
Line 63: Line 69:
 * Design LBB ballast mass.
Line 67: Line 74:
 * Wipe any rust from around IP LVDTs.
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-10-30

Main Assembly Sequence

  • Realign OL.

  • Cover OL with foil.
  • Offload IP P&Y offsets to picos.

  • Diagonalize OL.
  • Design, install angular lock servo using OL.
  • Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
  • Calibrate IP LVDT actuation against IP LVDT sensing.(Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

  • Spectra analysis of PI sensors (PI LVDTs and Geophones).
  • Design PI Sensor blending filter.
  • Subtract DC level of Geophones.
  • Modify IP LVDT damping filters to include set point.
  • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  • Set all EQ stops to TBD clearance.
  • Measure IP period; adjust ballast mass.
  • TFs.

Etc

  • Move stuff out of PR2 area.
  • Tidy/label parts.
  • Move safety bars from BS AF area to SR2 area.
  • Close hole in floor above BS AF area.

Software

  • Update real-time model to number channels from #0.
  • Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix).
  • Sort out SVN.
  • Add support for comments to SUMCON.
  • Create SUMCON model with values commented.

Medm screens

  • Remove old OL stuff; add link to new OL stuff.
  • Remove unused screens.

=== Documentation and Operation Manual===

  • Publish matrices for IP FRs.
  • Publish matrices for BS PI sensors v4.
  • Finish Foton operation Manual.
  • Complete MEDM operation Manual.
  • Pico Motor operation Manual.
  • Add useful info from Enzo's notebook to BSData.

Design

  • Finalize redesign of IP yaw adjuster.
  • Design better F0 FR adjuster.
  • Design LBB ballast mass.

Tasks Not To Forget

Major Tasks

  • Wipe any rust from around IP LVDTs.
  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)