Differences between revisions 168 and 209 (spanning 41 versions)
Revision 168 as of 2017-10-24 17:58:30
Size: 3563
Editor: EnzoTapia
Comment:
Revision 209 as of 2018-11-21 19:00:39
Size: 4208
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
== December 2018 vent ==
 * Look for cracks in F0 blades.
 * Install new yaw F0 stepper mechanism (if available).
 * Install new double-sided F0 fishing rod (have all parts except blades).
 * Add more mass to IP to get a lower frequency.
 * Service geophones (one has high noise, one has DC offset).
 * Re-calibrate F0 GAS LVDT.
 * Confirm the positions of the IP LVDTs and Actuators.
 * Tune LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).
Line 22: Line 32:
== 2017-10-16 == == ASAP ==
 * --(Get picomotor drivers back on line.)--
 * --(Debug BS BIO connections, especially PI IP.)--
Line 25: Line 37:
 * --(Borrow portable hard drive.)--
 * --(Remove sticker residue and permanent marker writing on PI.)--
 * --(Fix broken and unreliable connections on IP LVDTs.)--
 * --(Reconfigure the stepper motor cables for Miyo-kun.)--
 * Wipe any rust from around IP LVDTs.
 * (If Enzo thinks it necessary and there's time) adjust IP LVDT mechanical offsets to maximize usable range and recalibrate.
 * --(Add IP LVDT gains and offsets to IP_LVDTINF filter blocks.)--
 * Calibrate IP LVDT actuation against IP LVDT sensing.
 * --(Install damping filters for IP LVDTs.)--
 * Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
 * Modify IP LVDT damping filters to include set point.
 * --(Install and debug IP LVDT and geophone diagonalization matrices.)--
 * (Time permitting) Try adding mass to IP.
 * Work with alignment team.
 * Work with Mirapro on SR LBB and tank installation (Hirata-san, from Wed)
 * Work with Miyo-kun to get user interface for stepper motors.
 * --(Calibrate IP FR actuation against IP LVDT sensing.)--
 * SR procurement.
 * --(Lower LBB by 17.5 mm; suspend and rebalance after removing table KOACH filters.)--
 * --(Reroute cable to eliminate need for fifth feedthrough.)--
 * Set all EQ stops to TBD clearance.
 * Measure IP period; adjust ballast mass.
 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
 * TFs.
 * Necessary for phase-I★★★
  * --(Modify IP LVDT damping filters to include set point.)--
  * --(TFs.)--
  * '''''EXCHANGE YAW/VERT FRs at F0'''''
Line 50: Line 42:
=== Etc ===
 * Move stuff out of PR2 area.
 * Tidy/label parts.
 * Move safety bars from BS AF area to SR2 area.
 * (Put up safety bars in SR3 area.)
 * Close hole in floor above BS AF area.
 * Necessary for phase-II★★
  * Debug BS geophones.
  * Flip circuit boards in BS geophones to make them the same as SRx.
  * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
  * Design PI Sensor blending filter.
  * Tune the LVDT sensitivity
  * Measure IP period; adjust ballast mass.
Line 57: Line 50:
=== Software ===
 * --(Enter new IP matrices and do safe.snap.)--
 * --(Send stepper driver info to Miyo-kun)--.
 * Update real-time model to number channels from #0.
 * Remove old OL stuff; add link to new OL stuff.
 * Remove unused screens.
 * Sort out SVN.
 * --(Add support for comments to SUMCON.)--
 * Create SUMCON model with values commented.
 * Derive matrices for IP FRs.
 * At some point (remotely)★
  * Improve OL offloading.
  * Improve GAS offloading.
  * Spectral analysis of Oplev.
  * Design, install angular lock servo using OL. (Almost done for phase-I)
  * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
  * Subtract DC level of Geophones.
  * Spectra analysis of PI sensors (PI LVDTs and Geophones).
  * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
  * Set all EQ stops to TBD clearance.
  * Modify the model for IP coil driver control
Line 68: Line 62:
=== Design ===
 * Finalize redesign of IP yaw adjuster.
 * Design better F0 FR adjuster.
=== Documentation and Operation Manual ===
 * Add useful info from Enzo's notebook to BSData.
Line 75: Line 68:
 * --(Move safety bars from BS AF area to SR2 area.)--
 * Update circuit diagram.
 * (Time permitting) Try adding mass to IP.
Line 82: Line 78:
 * Return/replace borrowed parts:
  * T
emporary ballast mass (dog clamps) in BF.
 * --(Return/replace temporary ballast mass (dog clamps).)--
* Characterize replacement F0.
 * --(Wipe/clean arc weights that were ra
ined on.)--
Line 85: Line 82:
<<Anchor(elec)>>
Line 86: Line 84:
 * Update BS Circuit diagram, D1503600
  * --(Note removal of LED/PD on TM OSEMs.)--
  * Organize stepper reset system and watchdog BIO.
  * Include information on assignment of channels to feedthrough positions.
  * Reflect gender-changers and non-flipping feedthrough adapters.
  * Reflect actual cable lengths.
  * Include LVDT pin size (1 mm).
  * Include Stepper pin size (1.6 mm).
  * --(Undo renumbering of IP items.)--
  * --(Page 10: "DIO Card # 0" should be "DIO Card # 1")--
  * --(Include OutConfigBoards on OL page (Sheet 18).)--
  * --(Update HPCD section to reflect:)--
   * --(All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.)--
   * --(Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.)--
Line 94: Line 106:
 * Design and install GAS drift compensation filters.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

December 2018 vent

  • Look for cracks in F0 blades.
  • Install new yaw F0 stepper mechanism (if available).
  • Install new double-sided F0 fishing rod (have all parts except blades).
  • Add more mass to IP to get a lower frequency.
  • Service geophones (one has high noise, one has DC offset).
  • Re-calibrate F0 GAS LVDT.
  • Confirm the positions of the IP LVDTs and Actuators.
  • Tune LBB (adjust table height, damper height) - DON'T BOTHER (unless there's an excuse to open the lower half of the tank).

ASAP

  • Get picomotor drivers back on line.

  • Debug BS BIO connections, especially PI IP.

Main Assembly Sequence

  • Necessary for phase-I★★★
    • Modify IP LVDT damping filters to include set point.

    • TFs.

    • EXCHANGE YAW/VERT FRs at F0

  • Necessary for phase-II★★
    • Debug BS geophones.
    • Flip circuit boards in BS geophones to make them the same as SRx.
    • Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

    • Design PI Sensor blending filter.
    • Tune the LVDT sensitivity
    • Measure IP period; adjust ballast mass.
  • At some point (remotely)★
    • Improve OL offloading.
    • Improve GAS offloading.
    • Spectral analysis of Oplev.
    • Design, install angular lock servo using OL. (Almost done for phase-I)
    • Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
    • Subtract DC level of Geophones.
    • Spectra analysis of PI sensors (PI LVDTs and Geophones).
    • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
    • Set all EQ stops to TBD clearance.
    • Modify the model for IP coil driver control

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.

  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace temporary ballast mass (dog clamps).

  • Characterize replacement F0.
  • Wipe/clean arc weights that were rained on.

Electrical

  • Update BS Circuit diagram, D1503600
    • Note removal of LED/PD on TM OSEMs.

    • Organize stepper reset system and watchdog BIO.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Include Stepper pin size (1.6 mm).
    • Undo renumbering of IP items.

    • Page 10: "DIO Card # 0" should be "DIO Card # 1"

    • Include OutConfigBoards on OL page (Sheet 18).

    • Update HPCD section to reflect:

      • All three GAS channels are on HPCD #1 and DIO Card #2, CNB cables, Sheet 13.

      • Three IP channels are on HPCD #0 and DIO Card #2, CNA cables, Sheet 15.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)