= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | [[../ToDoOldBS|Archived BS To-Do Items]] [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 6: | Line 14: |
=== Facilities (mostly full team) === * Clean up after floor work. |
=== Facilities === |
Line 11: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 12: | Line 20: |
== 2017-04-24 == | <<Anchor(ComingWeeks)>> == 2017-09-04 == |
Line 14: | Line 23: |
=== Continue PI Prep === * Install LLB blades. * Install LLB blade units in PI. |
=== Main Assembly Sequence === * --(Crane out SF.)-- * --(Raise BF cap and retrieve lost hex cable clamp PEEK piece.)-- * --(Crane in SF.)-- * --(Install SF-BF rod with hex cable clamp.)-- * --(Route cables via hex cable clamp up to below SF.)-- * --(Adjust BF ballast mass for total weight and pitch/roll.)-- * --(Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.)-- * --(Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).)-- * --(Calibrate SF LVDT.)-- * --(Install SF main ballast mass.)-- * --(Cable and test SF fishing rod stepper.)-- * --(Add SF cap.)-- * Lift and weigh SF/... section. |
Line 18: | Line 39: |
=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) === * Crane in PI. * Connect up SF/... . * Measure overweight if any. * Try removing some/all Cu dampers. * Remove PI again. * Do final trim of SF, fix LVDT if needed. * Crane PI back in. |
=== In parallel, time permitting === * --(Rearrange arc weights on PI to allow installation of magic wand.)-- * --(Install magic wand on PI.)-- * Check that we still have all LBB parts (there was an issue with borrowed lock nuts). * --(Rearrange magnets on SF damper magnet ring for full three Cu segments.)-- * --(Find Ni-plated rods for SF damper magnet ring and do fit check.)-- * --(Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.)-- * Wipe LLB damper parts with ethanol. * --(Get Cu O-rings for feedthroughs.)-- * Figure out how to tighten PI yaw return spring. * --(Recalibrate remachined LBB springs and choose best three.)-- |
Line 27: | Line 51: |
=== Electronics (mostly Enzo, Mark) === * Debug SF LVDT. * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Work with Miyo-kun to get pico drivers added to BS rack and screens * Update E1503600 with DIO card for HPCDs, etc, etc. * Decide final length for BS OSEM cables (Enzo, Mark, Fabian) * Send list of required in-vacuum cables to Takahashi-san |
== Dates == * Repaired LBB half ring is returned: 9/11 (Mon, lunchtime) * BUMAX countersunk screws for LBB Cu * SDC screws for LBB half rings: 9/15 (Fri) * LBB Cu segments: 9/19-20 <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Get pico drive screens fixed (Miyo-kun) * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * Calibrate PI horizontal LVDTs. === Minor Tasks === ==== Mechanical ==== * Get clean bag laundered. * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Lock washers for LBB dampers * Temporary ballast mass (dog clamps) in BF. * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match. ==== Electrical ==== * Decide final in-vacuum and in-air cable routing (Enzo). * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height). ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 35: | Line 85: |
* Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata) * Count used, unused and broken in-vac cables and send data to Sato-san. == Real-time and SUMCON models (mostly Perry, Mark) == |
|
Line 42: | Line 88: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
* Design and install GAS drift compensation filters. * --(Create a proper DAC Monitor MEDM screen.)-- * --(Improve ADC Monitor MEDM screen.)-- |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-09-04
Main Assembly Sequence
Crane out SF.
Raise BF cap and retrieve lost hex cable clamp PEEK piece.
Crane in SF.
Install SF-BF rod with hex cable clamp.
Route cables via hex cable clamp up to below SF.
Adjust BF ballast mass for total weight and pitch/roll.
Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.
Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
Calibrate SF LVDT.
Install SF main ballast mass.
Cable and test SF fishing rod stepper.
Add SF cap.
- Lift and weigh SF/... section.
In parallel, time permitting
Rearrange arc weights on PI to allow installation of magic wand.
Install magic wand on PI.
- Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
Rearrange magnets on SF damper magnet ring for full three Cu segments.
Find Ni-plated rods for SF damper magnet ring and do fit check.
Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.
- Wipe LLB damper parts with ethanol.
Get Cu O-rings for feedthroughs.
- Figure out how to tighten PI yaw return spring.
Recalibrate remachined LBB springs and choose best three.
Dates
- Repaired LBB half ring is returned: 9/11 (Mon, lunchtime)
- BUMAX countersunk screws for LBB Cu
- SDC screws for LBB half rings: 9/15 (Fri)
- LBB Cu segments: 9/19-20
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Get pico drive screens fixed (Miyo-kun)
- Calibrate PI vertical LVDT.
- Set yoke on PI vertical LVDT (if necessary).
- Calibrate PI horizontal LVDTs.
Minor Tasks
Mechanical
- Get clean bag laundered.
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Lock washers for LBB dampers
- Temporary ballast mass (dog clamps) in BF.
- Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Electrical
- Decide final in-vacuum and in-air cable routing (Enzo).
Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.
Create a proper DAC Monitor MEDM screen.
Improve ADC Monitor MEDM screen.