1573
Comment:
|
3346
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | [[../ToDoOldBS|Archived BS To-Do Items]] [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 6: | Line 14: |
=== Facilities (mostly full team) === * Clean up after floor work. |
=== Facilities === |
Line 11: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 12: | Line 20: |
== 2017-04-24 == | <<Anchor(ComingWeeks)>> |
Line 14: | Line 22: |
=== Continue PI Prep === * Install LLB blades. * Install LLB blade units in PI. |
== 2017-09-25 == |
Line 18: | Line 24: |
=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) === * Crane in PI. * Connect up SF/... . * Measure overweight if any. * Try removing some/all Cu dampers. * Remove PI again. * Do final trim of SF, fix LVDT if needed. * Crane PI back in. |
=== Main Assembly Sequence === * --(Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).)-- * --(Fix #1 geophone adapter cable.)-- * Fix broken pico adapter cable? * Debug all electronics, starting with IRM OSEMs. (half done) * --(Unlock IP; use jacks and FRs to center.)-- * Check IP yaw. * Recheck centering of suspension in assembly frame. * Measure IP period; adjust ballast mass. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * LBB stuff (see below). * |
Line 27: | Line 37: |
=== Electronics (mostly Enzo, Mark) === * Debug SF LVDT. * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Work with Miyo-kun to get pico drivers added to BS rack and screens * Update E1503600 with DIO card for HPCDs, etc, etc. * Decide final length for BS OSEM cables (Enzo, Mark, Fabian) * Send list of required in-vacuum cables to Takahashi-san |
=== LBB Sequence === * --(Unclamp LBB ring sandwich; fully suspend Cu ring.)-- * --(Unscrew LBB from tank brackets.)-- * --(Hook LBB.)-- * --(Remove TBD amount of spacers from between LBB and tank brackets.)-- * --(Set LBB blade stops to nominal height.)-- * --(Extend foot screws on LBB to just barely support LBB.)-- * --(Adjust height of LBB magnet ring to set proper gap (4 mm??).)-- * --(Retract LBB foot screws.)-- * --(Add temporary ballast to LBB until LBB blades just barely sink below stops.)-- * --(Check distance from LBB to main beam height (or other suitable reference); adjust by screwing receptacles.)-- * --(Set foot screws to give ≈5 mm (or TBD) movement range of LBB below nominal.)-- * --(Set stop on LBB blades to give ≈3 mm (or TBD, less than Cu-magnet gap) of LBB above nominal.)-- === In parallel, time permitting === <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Get pico drive screens fixed (Miyo-kun) * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Get clean bag laundered. * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Lock washers for LBB dampers * Temporary ballast mass (dog clamps) in BF. * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match. ==== Electrical ==== * Decide final in-vacuum and in-air cable routing (Enzo). * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height). ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 35: | Line 79: |
* Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata) * Count used, unused and broken in-vac cables and send data to Sato-san. == Real-time and SUMCON models (mostly Perry, Mark) == |
|
Line 42: | Line 82: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
* Design and install GAS drift compensation filters. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-09-25
Main Assembly Sequence
Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).
Fix #1 geophone adapter cable.
- Fix broken pico adapter cable?
- Debug all electronics, starting with IRM OSEMs. (half done)
Unlock IP; use jacks and FRs to center.
- Check IP yaw.
- Recheck centering of suspension in assembly frame.
- Measure IP period; adjust ballast mass.
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- LBB stuff (see below).
LBB Sequence
Unclamp LBB ring sandwich; fully suspend Cu ring.
Unscrew LBB from tank brackets.
Hook LBB.
Remove TBD amount of spacers from between LBB and tank brackets.
Set LBB blade stops to nominal height.
Extend foot screws on LBB to just barely support LBB.
Adjust height of LBB magnet ring to set proper gap (4 mm??).
Retract LBB foot screws.
Add temporary ballast to LBB until LBB blades just barely sink below stops.
Check distance from LBB to main beam height (or other suitable reference); adjust by screwing receptacles.
Set foot screws to give ≈5 mm (or TBD) movement range of LBB below nominal.
Set stop on LBB blades to give ≈3 mm (or TBD, less than Cu-magnet gap) of LBB above nominal.
In parallel, time permitting
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Get pico drive screens fixed (Miyo-kun)
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Get clean bag laundered.
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Lock washers for LBB dampers
- Temporary ballast mass (dog clamps) in BF.
- Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
Electrical
- Decide final in-vacuum and in-air cable routing (Enzo).
Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.