1573
Comment:
|
← Revision 210 as of 2019-01-04 15:21:23 ⇥
155
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Every Week == === Facilities (mostly full team) === * Clean up after floor work. * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == 2017-04-24 == === Continue PI Prep === * Install LLB blades. * Install LLB blade units in PI. === Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) === * Crane in PI. * Connect up SF/... . * Measure overweight if any. * Try removing some/all Cu dampers. * Remove PI again. * Do final trim of SF, fix LVDT if needed. * Crane PI back in. === Electronics (mostly Enzo, Mark) === * Debug SF LVDT. * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Work with Miyo-kun to get pico drivers added to BS rack and screens * Update E1503600 with DIO card for HPCDs, etc, etc. * Decide final length for BS OSEM cables (Enzo, Mark, Fabian) * Send list of required in-vacuum cables to Takahashi-san * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata) * Count used, unused and broken in-vac cables and send data to Sato-san. == Real-time and SUMCON models (mostly Perry, Mark) == * Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |