Line 22: | Line 22: |
== 2017-10-30 == | == ASAP == === Pumpdown Prep === * Prepare BS Chamber * --(Remove non-vacuum-compatible ballast from LBB.)-- * --(Check for lost tools.)-- * Wipe down all accessible areas inside tank with Vector Alpha wipes and ethanol. * Help Type Bp Team * --(Add screws to cables at PR2 feedthroughs.)-- |
Line 25: | Line 33: |
* --(Realign OL.)-- * Cover OL with foil. * Offload IP P&Y offsets to picos. * Diagonalize OL. * Design, install angular lock servo using OL. * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. * Calibrate IP LVDT actuation against IP LVDT sensing.(Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553) * Spectra analysis of PI sensors (PI LVDTs and Geophones). * Design PI Sensor blending filter. * Subtract DC level of Geophones. * Modify IP LVDT damping filters to include set point. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * Set all EQ stops to TBD clearance. * Measure IP period; adjust ballast mass. * TFs. |
* Necessary for phase-I★★★ * --(Modify IP LVDT damping filters to include set point.)-- * --(TFs.)-- * '''''EXCHANGE YAW/VERT FRs at F0''''' * Check IP BIO is working or not. |
Line 41: | Line 39: |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * Close hole in floor above BS AF area. |
* Necessary for phase-II★★ * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553) * Design PI Sensor blending filter. * Re-calibrate F0 GAS LVDT * Tune the LVDT sensitivity * Measure IP period; adjust ballast mass. |
Line 47: | Line 46: |
=== Software === * Update real-time model to number channels from #0. * Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix). * Sort out SVN. * Add support for comments to SUMCON. * Create SUMCON model with values commented. |
* At some point (remotely)★ * Improve OL offloading. * Improve GAS offloading. * Spectral analysis of Oplev. * Design, install angular lock servo using OL. (Almost done for phase-I) * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I) * Subtract DC level of Geophones. * Spectra analysis of PI sensors (PI LVDTs and Geophones). * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * Set all EQ stops to TBD clearance. * Modify the model for IP coil driver control |
Line 54: | Line 58: |
=== Medm screens === * Remove old OL stuff; add link to new OL stuff. * Remove unused screens. === Documentation and Operation Manual=== * Publish matrices for IP FRs. * Publish matrices for BS PI sensors v4. * Finish Foton operation Manual. * Complete MEDM operation Manual. * Pico Motor operation Manual. |
=== Documentation and Operation Manual === |
Line 65: | Line 60: |
=== Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. * Design LBB ballast mass. |
|
Line 74: | Line 64: |
* Wipe any rust from around IP LVDTs. | * Move safety bars from BS AF area to SR2 area. * Close hole in floor above BS AF area. |
Line 87: | Line 78: |
<<Anchor(elec)>> | |
Line 88: | Line 80: |
* Update BS Circuit diagram, D1503600 * Note removal of LED/PD on TM OSEMs. * Reflect gender-changers and non-flipping feedthrough adapters. * Reflect actual cable lengths. * Include LVDT pin size (1 mm). |
|
Line 96: | Line 93: |
* Design and install GAS drift compensation filters. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
ASAP
Pumpdown Prep
- Prepare BS Chamber
Remove non-vacuum-compatible ballast from LBB.
Check for lost tools.
- Wipe down all accessible areas inside tank with Vector Alpha wipes and ethanol.
- Help Type Bp Team
Add screws to cables at PR2 feedthroughs.
Main Assembly Sequence
- Necessary for phase-I★★★
Modify IP LVDT damping filters to include set point.
TFs.
EXCHANGE YAW/VERT FRs at F0
- Check IP BIO is working or not.
- Necessary for phase-II★★
Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
- Design PI Sensor blending filter.
- Re-calibrate F0 GAS LVDT
- Tune the LVDT sensitivity
- Measure IP period; adjust ballast mass.
- At some point (remotely)★
- Improve OL offloading.
- Improve GAS offloading.
- Spectral analysis of Oplev.
- Design, install angular lock servo using OL. (Almost done for phase-I)
- Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
- Subtract DC level of Geophones.
- Spectra analysis of PI sensors (PI LVDTs and Geophones).
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- Set all EQ stops to TBD clearance.
- Modify the model for IP coil driver control
Documentation and Operation Manual
- Add useful info from Enzo's notebook to BSData.
Tasks Not To Forget
Major Tasks
- Move safety bars from BS AF area to SR2 area.
- Close hole in floor above BS AF area.
- Update circuit diagram.
- (Time permitting) Try adding mass to IP.
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
- Update BS Circuit diagram, D1503600
- Note removal of LED/PD on TM OSEMs.
- Reflect gender-changers and non-flipping feedthrough adapters.
- Reflect actual cable lengths.
- Include LVDT pin size (1 mm).
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.